X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0304283014000"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0304283014000
 
| Well ID: 0304283014000
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.601950, -113.93684 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.601950, -113.936840 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/14-30-030-28W4/0
 
| Location: 00/14-30-030-28W4/0
Line 43: Line 43:
 
| Surface Hole Latitude: 51.601950
 
| Surface Hole Latitude: 51.601950
 
|-
 
|-
| Surface Hole Longitude: -113.93684
+
| Surface Hole Longitude: -113.936840
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 150: Line 150:
 
| style="text-align: right;" | 929.00
 
| style="text-align: right;" | 929.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
|-
 
| 2006-02-14
 
| Perforation
 
| style="text-align: right;" | 913.00
 
| style="text-align: right;" | 914.00
 
| style="text-align: right;" | 13
 
|-
 
| 2006-02-14
 
| Acid Treatment
 
| style="text-align: right;" | 913.00
 
| style="text-align: right;" | 929.00
 
| style="text-align: right;" | 0
 
|-
 
| 2006-02-15
 
| Perforation
 
| style="text-align: right;" | 458.00
 
| style="text-align: right;" | 459.00
 
| style="text-align: right;" | 13
 
|-
 
| 2006-02-15
 
| Perforation
 
| style="text-align: right;" | 609.00
 
| style="text-align: right;" | 610.00
 
| style="text-align: right;" | 13
 
|-
 
| 2006-02-18
 
| Cement Squeeze
 
| style="text-align: right;" | 609.00
 
| style="text-align: right;" | 610.00
 
| style="text-align: right;" | 0
 
|-
 
| 2006-02-18
 
| Cement Squeeze
 
| style="text-align: right;" | 458.00
 
| style="text-align: right;" | 459.00
 
| style="text-align: right;" | 0
 
|-
 
| 2006-09-10
 
| Packing Dev Cpd w/Res-Gyp Cem
 
| style="text-align: right;" | 908.00
 
| style="text-align: right;" | 911.00
 
| style="text-align: right;" | 0
 
|-
 
| 2006-09-10
 
| Perforation
 
| style="text-align: right;" | 902.50
 
| style="text-align: right;" | 902.80
 
| style="text-align: right;" | 14
 
 
|-
 
|-
 
| 2006-09-10
 
| 2006-09-10
Line 258: Line 210:
 
| style="text-align: right;" | 734.50
 
| style="text-align: right;" | 734.50
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 +
|-
 +
| 2006-02-14
 +
| Perforation
 +
| style="text-align: right;" | 913.00
 +
| style="text-align: right;" | 914.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-09-10
 
| 2006-09-10
Line 294: Line 252:
 
| style="text-align: right;" | 902.80
 
| style="text-align: right;" | 902.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 2006-02-14
 +
| Acid Treatment
 +
| style="text-align: right;" | 913.00
 +
| style="text-align: right;" | 929.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-02-15
 +
| Perforation
 +
| style="text-align: right;" | 458.00
 +
| style="text-align: right;" | 459.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-15
 +
| Perforation
 +
| style="text-align: right;" | 609.00
 +
| style="text-align: right;" | 610.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-18
 +
| Cement Squeeze
 +
| style="text-align: right;" | 609.00
 +
| style="text-align: right;" | 610.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-02-18
 +
| Cement Squeeze
 +
| style="text-align: right;" | 458.00
 +
| style="text-align: right;" | 459.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-09-10
 +
| Packing Dev Cpd w/Res-Gyp Cem
 +
| style="text-align: right;" | 908.00
 +
| style="text-align: right;" | 911.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-09-10
 +
| Perforation
 +
| style="text-align: right;" | 902.50
 +
| style="text-align: right;" | 902.80
 +
| style="text-align: right;" | 14
 
|-
 
|-
 
|}
 
|}
Line 368: Line 368:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:39, 30 January 2021

Well Details

Well ID: 0304283014000
Loading map...
Location: 00/14-30-030-28W4/0
Location Alias: 00/14-30-30-28 W4M
Location Alias 2: 00/14-30-030-28 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 28
Section: 30
County/Municipality: Mountain View County
Well Name: 981384 LPINECK 14-30-30-28
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0335322
License Date: 2005-07-26
License Status: Suspension
Spud Date: 2005-08-28
Final Drill Date: 2005-09-04
Well Total Depth: 935.00 m
Surface Hole Latitude: 51.601950
Surface Hole Longitude: -113.936840

For data sources see[1][2]

Well History

Date Event
2005-07-26 Obtained License
2005-09-01 Surface Casing Operation Performed
2005-09-04 Finished Drilling
2005-09-04 Production Casing Operation Performed
2005-09-04 Well Mode changed to Drilled and Cased
2005-09-05 Rig Released
2005-10-20 Well Log Performed
2006-02-13 Perforation Treatment Performed - Jet Perforation
2006-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-02-14 Perforation Treatment Performed - Jet Perforation
2006-02-15 Perforation Treatment Performed - Jet Perforation
2006-02-15 Well Log Performed
2006-02-18 Perforation Treatment Performed - Cement Squeeze
2006-03-01 Well Log Performed
2006-09-10 Perforation Treatment Performed - Jet Perforation
2006-09-10 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2006-09-12 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-13 Perforation 928.00 929.00 13
2006-09-10 Perforation 886.00 886.60 14
2006-09-10 Perforation 875.00 876.00 14
2006-09-10 Perforation 871.00 871.40 14
2006-09-10 Perforation 861.50 862.60 14
2006-09-10 Perforation 849.70 850.20 14
2006-09-10 Perforation 834.50 834.80 14
2006-09-10 Perforation 821.00 821.50 14
2006-09-10 Perforation 820.00 820.50 14
2006-09-10 Perforation 744.00 744.30 14
2006-09-10 Perforation 734.20 734.50 14
2006-02-14 Perforation 913.00 914.00 13
2006-09-10 Perforation 606.00 606.90 14
2006-09-10 Perforation 489.10 490.70 14
2006-09-10 Perforation 480.20 480.60 14
2006-09-10 Perforation 473.00 473.70 14
2006-09-10 Perforation 464.20 464.80 14
2006-09-12 Fracture 902.50 902.80 0
2006-02-14 Acid Treatment 913.00 929.00 0
2006-02-15 Perforation 458.00 459.00 13
2006-02-15 Perforation 609.00 610.00 13
2006-02-18 Cement Squeeze 609.00 610.00 0
2006-02-18 Cement Squeeze 458.00 459.00 0
2006-09-10 Packing Dev Cpd w/Res-Gyp Cem 908.00 911.00 0
2006-09-10 Perforation 902.50 902.80 14

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-28 No Incident Encountered 0.00 0.00

For data sources see[5]

References