X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0314240508000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0314240508000
 
| Well ID: 0314240508000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.62434400000000778, -113.3629959999999528 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.624344, -113.362996 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/08-05-031-24W4/0
 
| Location: 00/08-05-031-24W4/0
 +
|-
 +
| Location Alias: 00/08-05-31-24 W4M
 +
|-
 +
| Location Alias 2: 00/08-05-031-24 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 031
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 24
 +
|-
 +
| Section: 05
 +
|-
 +
| County/Municipality: [[Kneehill County,_Alberta|Kneehill County]]
 
|-
 
|-
 
| Well Name: ANDEX BUMPER TWINING 8-5-31-24
 
| Well Name: ANDEX BUMPER TWINING 8-5-31-24
 +
|-
 +
| Operator Name: [[Bumper Development Corporation Ltd.]]
 +
|-
 +
| License Number: 0052655
 
|-
 
|-
 
| License Date: 1975-01-28
 
| License Date: 1975-01-28
 
|-
 
|-
| Final Drilling Date: 1975-02-14
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1975-02-06
 +
|-
 +
| Final Drill Date: 1975-02-14
 +
|-
 +
| Well Total Depth: 1757.20 m
 +
|-
 +
| Surface Hole Latitude: 51.624344
 +
|-
 +
| Surface Hole Longitude: -113.362996
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1975-01-28
 +
| Obtained License
 +
|-
 +
| 1975-02-14
 +
| Finished Drilling
 +
|-
 +
| 1975-02-14
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1975-02-15
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-02-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-02-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-02-18
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-02-20
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1975-02-20
 +
| Production Casing Operation Performed
 +
|-
 +
| 1975-02-27
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1975-03-02
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1975-03-02
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1975-03-04
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1975-03-06
 +
| Perforation Treatment Performed - Nitrogen Treatment
 +
|-
 +
| 1975-03-07
 +
| Perforation Treatment Performed - Condensate Squeeze
 +
|-
 +
| 1975-03-14
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1975-03-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1975-08-12
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1975-08-14
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1975-08-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1975-08-15
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1975-08-16
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1975-10-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1975-10-07
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1975-10-11
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1975-11-01
 +
| Well Began Injection
 +
|-
 +
| 1975-11-01
 +
| Well Fluid changed to Water
 +
|-
 +
| 1975-11-01
 +
| Well Type changed to Disposal
 +
|-
 +
| 1984-07-21
 +
| Well Log Performed
 +
|-
 +
| 1984-08-01
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1984-08-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-08-01
 +
| Plug Back Performed
 +
|-
 +
| 1984-08-01
 +
| Well Fluid changed to Water
 +
|-
 +
| 1984-08-01
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1984-08-01
 +
| Well Type changed to Disposal
 +
|-
 +
| 1984-08-02
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-08-02
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1975-02-20
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1702.30
 +
| style="text-align: right;" | 1757.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-08-12
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1702.30
 +
| style="text-align: right;" | 1740.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-08-14
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1670.30
 +
| style="text-align: right;" | 1670.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-08-14
 +
| Perforation
 +
| style="text-align: right;" | 1469.10
 +
| style="text-align: right;" | 1469.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1975-08-14
 +
| Perforation
 +
| style="text-align: right;" | 1472.20
 +
| style="text-align: right;" | 1473.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1975-08-14
 +
| Perforation
 +
| style="text-align: right;" | 1476.10
 +
| style="text-align: right;" | 1477.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1975-08-15
 +
| Acid Treatment
 +
| style="text-align: right;" | 1469.10
 +
| style="text-align: right;" | 1477.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-08-16
 +
| Fracture
 +
| style="text-align: right;" | 1469.10
 +
| style="text-align: right;" | 1477.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-10-05
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1469.10
 +
| style="text-align: right;" | 1477.40
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 1757.2m
+
| 1975-10-07
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1206.10
 +
| style="text-align: right;" | 1207.30
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Water
+
| 1975-10-11
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1702.30
 +
| style="text-align: right;" | 1740.40
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Abandoned
+
| 1975-02-27
 +
| Acid Treatment
 +
| style="text-align: right;" | 1702.30
 +
| style="text-align: right;" | 1757.20
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Disposal
+
| 1984-08-01
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1455.00
 +
| style="text-align: right;" | 1460.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 1984-08-01
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1150.00
 +
| style="text-align: right;" | 1155.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 51.62434400000000778
+
| 1984-08-01
 +
| Perforation
 +
| style="text-align: right;" | 183.50
 +
| style="text-align: right;" | 184.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Longitude: -113.3629959999999528
+
| 1984-08-02
 +
| Cement Squeeze
 +
| style="text-align: right;" | 183.50
 +
| style="text-align: right;" | 184.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 1975-03-02
 +
| Cement Plug
 +
| style="text-align: right;" | 1740.40
 +
| style="text-align: right;" | 1757.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-03-02
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1702.30
 +
| style="text-align: right;" | 1740.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-03-04
 +
| Fracture
 +
| style="text-align: right;" | 1702.30
 +
| style="text-align: right;" | 1740.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-03-06
 +
| Nitrogen Treatment
 +
| style="text-align: right;" | 1702.30
 +
| style="text-align: right;" | 1740.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-03-07
 +
| Condensate Squeeze
 +
| style="text-align: right;" | 1702.30
 +
| style="text-align: right;" | 1740.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-03-14
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1364.30
 +
| style="text-align: right;" | 1373.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-03-15
 +
| Perforation
 +
| style="text-align: right;" | 1206.10
 +
| style="text-align: right;" | 1207.30
 +
| style="text-align: right;" | 7
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1976
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1977
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1978
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1979
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:30, 30 January 2021

Well Details

Well ID: 0314240508000
Loading map...
Location: 00/08-05-031-24W4/0
Location Alias: 00/08-05-31-24 W4M
Location Alias 2: 00/08-05-031-24 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 24
Section: 05
County/Municipality: Kneehill County
Well Name: ANDEX BUMPER TWINING 8-5-31-24
Operator Name: Bumper Development Corporation Ltd.
License Number: 0052655
License Date: 1975-01-28
License Status: RecCertified
Spud Date: 1975-02-06
Final Drill Date: 1975-02-14
Well Total Depth: 1757.20 m
Surface Hole Latitude: 51.624344
Surface Hole Longitude: -113.362996

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-01-28 Obtained License
1975-02-14 Finished Drilling
1975-02-14 Well Mode changed to Drilled and Cased
1975-02-15 Drill Stem Test Performed
1975-02-16 Drill Stem Test Performed
1975-02-17 Drill Stem Test Performed
1975-02-18 Drill Stem Test Performed
1975-02-20 Perforation Treatment Performed - Open-Hole Completion
1975-02-20 Production Casing Operation Performed
1975-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-02 Perforation Treatment Performed - Cement Plug
1975-03-02 Perforation Treatment Performed - Open-Hole Completion
1975-03-04 Perforation Treatment Performed - Fractured
1975-03-06 Perforation Treatment Performed - Nitrogen Treatment
1975-03-07 Perforation Treatment Performed - Condensate Squeeze
1975-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-03-15 Perforation Treatment Performed - Jet Perforation
1975-08-12 Perforation Treatment Performed - Open-Hole Completion
1975-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-08-14 Perforation Treatment Performed - Jet Perforation
1975-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-16 Perforation Treatment Performed - Fractured
1975-10-05 Perforation Treatment Performed - Cement Squeeze
1975-10-07 Perforation Treatment Performed - Cement Squeeze
1975-10-11 Perforation Treatment Performed - Open-Hole Completion
1975-11-01 Well Began Injection
1975-11-01 Well Fluid changed to Water
1975-11-01 Well Type changed to Disposal
1984-07-21 Well Log Performed
1984-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-08-01 Perforation Treatment Performed - Jet Perforation
1984-08-01 Plug Back Performed
1984-08-01 Well Fluid changed to Water
1984-08-01 Well Mode changed to Abandoned
1984-08-01 Well Type changed to Disposal
1984-08-02 Perforation Treatment Performed - Cement Squeeze
1984-08-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-02-20 Open Hole/Barefoot Completion 1702.30 1757.20 0
1975-08-12 Open Hole/Barefoot Completion 1702.30 1740.40 0
1975-08-14 Packing Device Capped w/Cement 1670.30 1670.30 0
1975-08-14 Perforation 1469.10 1469.70 7
1975-08-14 Perforation 1472.20 1473.70 7
1975-08-14 Perforation 1476.10 1477.40 7
1975-08-15 Acid Treatment 1469.10 1477.40 0
1975-08-16 Fracture 1469.10 1477.40 0
1975-10-05 Cement Squeeze 1469.10 1477.40 0
1975-10-07 Cement Squeeze 1206.10 1207.30 0
1975-10-11 Open Hole/Barefoot Completion 1702.30 1740.40 0
1975-02-27 Acid Treatment 1702.30 1757.20 0
1984-08-01 Packing Device Capped w/Cement 1455.00 1460.00 0
1984-08-01 Packing Device Capped w/Cement 1150.00 1155.00 0
1984-08-01 Perforation 183.50 184.00 13
1984-08-02 Cement Squeeze 183.50 184.00 0
1975-03-02 Cement Plug 1740.40 1757.20 0
1975-03-02 Open Hole/Barefoot Completion 1702.30 1740.40 0
1975-03-04 Fracture 1702.30 1740.40 0
1975-03-06 Nitrogen Treatment 1702.30 1740.40 0
1975-03-07 Condensate Squeeze 1702.30 1740.40 0
1975-03-14 Packing Device Capped w/Cement 1364.30 1373.40 0
1975-03-15 Perforation 1206.10 1207.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0

For data sources see[5]

References