X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0334200307000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0334200307000
 
| Well ID: 0334200307000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.7998738, -112.7541782 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.799951, -112.754354 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: HUSKY ROWLEY 7-3-33-20
+
| Location: 00/07-03-033-20W4/0
 
|-
 
|-
| Operator:
+
| Location Alias: 00/07-03-33-20 W4M
 +
|-
 +
| Location Alias 2: 00/07-03-033-20 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 033
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 03
 +
|-
 +
| County/Municipality: [[Starland County,_Alberta|Starland County]]
 +
|-
 +
| Well Name: TEAC ROWLEY 7-3-33-20
 +
|-
 +
| Operator Name: [[Trident Exploration (Alberta) Corp.]]
 +
|-
 +
| License Number: 0033072
 
|-
 
|-
 
| License Date: 1967-11-16
 
| License Date: 1967-11-16
 
|-
 
|-
| Final Drilling Date: 1967-11-25
+
| License Status: Abandoned
 
|-
 
|-
| Total Depth: 1408.5m
+
| Spud Date: 1967-11-18
 
|-
 
|-
| Fluid Type: Gas
+
| Final Drill Date: 1967-11-25
 
|-
 
|-
| Status: Abandoned Zone
+
| Well Total Depth: 1408.50 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 51.799951
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -112.754354
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Violations:
+
| 1909-09-09
 +
| Well Log Performed
 
|-
 
|-
| Latitude: 51.7998738
+
| 1967-11-16
 +
| Obtained License
 
|-
 
|-
| Longitude: -112.7541782
+
| 1967-11-25
 +
| Finished Drilling
 +
|-
 +
| 1967-11-26
 +
| Drill Stem Test Performed
 +
|-
 +
| 1967-11-28
 +
| Drill Stem Test Performed
 +
|-
 +
| 1967-11-29
 +
| Drill Stem Test Performed
 +
|-
 +
| 1967-11-30
 +
| Production Casing Operation Performed
 +
|-
 +
| 1968-01-09
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1995-09-05
 +
| Well Log Performed
 +
|-
 +
| 1995-09-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1995-09-06
 +
| Well Log Performed
 +
|-
 +
| 1997-07-22
 +
| Well Began Production
 +
|-
 +
| 1997-07-22
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1997-07-22
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1999-03-02
 +
| Well Log Performed
 +
|-
 +
| 2001-02-03
 +
| Well Log Performed
 +
|-
 +
| 2001-03-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-05-15
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2001-05-15
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2001-05-15
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2003-02-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2003-02-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2010-08-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-08-15
 +
| Plug Back Performed
 +
|-
 +
| 2010-08-15
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2010-08-15
 +
| Well Log Performed
 +
|-
 +
| 2010-08-15
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2010-08-19
 +
| Well Log Performed
 +
|-
 +
| 2010-08-24
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2010-08-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-08-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-08-30
 +
| Plug Back Performed
 +
|-
 +
| 2010-09-02
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2011-06-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-06-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-06-12
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2011-06-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-06-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-06-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-06-15
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2011-06-16
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2011-06-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-06-16
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2011-06-17
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2011-06-27
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2011-06-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-06-29
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2011-07-01
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-07-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-06-02
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1995-09-06
 +
| Perforation
 +
| style="text-align: right;" | 1365.50
 +
| style="text-align: right;" | 1366.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2010-09-02
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 609.00
 +
| style="text-align: right;" | 610.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-10
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 687.00
 +
| style="text-align: right;" | 695.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 592.00
 +
| style="text-align: right;" | 600.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-12
 +
| Perforation
 +
| style="text-align: right;" | 582.00
 +
| style="text-align: right;" | 583.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-06-12
 +
| Cement Plug
 +
| style="text-align: right;" | 570.00
 +
| style="text-align: right;" | 592.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-14
 +
| Perforation
 +
| style="text-align: right;" | 464.00
 +
| style="text-align: right;" | 465.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-06-15
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 464.00
 +
| style="text-align: right;" | 465.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-15
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 450.00
 +
| style="text-align: right;" | 460.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-16
 +
| Perforation
 +
| style="text-align: right;" | 440.00
 +
| style="text-align: right;" | 441.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-06-16
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 440.00
 +
| style="text-align: right;" | 441.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-03-03
 +
| Perforation
 +
| style="text-align: right;" | 1179.60
 +
| style="text-align: right;" | 1181.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2011-06-16
 +
| Cement Plug
 +
| style="text-align: right;" | 434.00
 +
| style="text-align: right;" | 450.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-17
 +
| Cement Plug
 +
| style="text-align: right;" | 422.20
 +
| style="text-align: right;" | 434.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-27
 +
| Cement Plug
 +
| style="text-align: right;" | 334.40
 +
| style="text-align: right;" | 379.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-29
 +
| Perforation
 +
| style="text-align: right;" | 278.50
 +
| style="text-align: right;" | 280.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-06-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 278.50
 +
| style="text-align: right;" | 280.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-07-01
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 221.00
 +
| style="text-align: right;" | 270.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-07-03
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 99.50
 +
| style="text-align: right;" | 131.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-05-15
 +
| Fracture
 +
| style="text-align: right;" | 1179.60
 +
| style="text-align: right;" | 1181.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-08-15
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1352.00
 +
| style="text-align: right;" | 1360.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-08-24
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1179.60
 +
| style="text-align: right;" | 1181.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-08-30
 +
| Perforation
 +
| style="text-align: right;" | 700.00
 +
| style="text-align: right;" | 701.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2010-08-30
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1162.00
 +
| style="text-align: right;" | 1170.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-08-30
 +
| Perforation
 +
| style="text-align: right;" | 609.00
 +
| style="text-align: right;" | 610.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2010-09-02
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 700.00
 +
| style="text-align: right;" | 701.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1997
 +
| style="text-align: right;" | 3771
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1998
 +
| style="text-align: right;" | 8336
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1999
 +
| style="text-align: right;" | 8439
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2000
 +
| style="text-align: right;" | 7484
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2001
 +
| style="text-align: right;" | 1160
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 02:53, 31 January 2021

Well Details

Well ID: 0334200307000
Loading map...
Location: 00/07-03-033-20W4/0
Location Alias: 00/07-03-33-20 W4M
Location Alias 2: 00/07-03-033-20 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 20
Section: 03
County/Municipality: Starland County
Well Name: TEAC ROWLEY 7-3-33-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0033072
License Date: 1967-11-16
License Status: Abandoned
Spud Date: 1967-11-18
Final Drill Date: 1967-11-25
Well Total Depth: 1408.50 m
Surface Hole Latitude: 51.799951
Surface Hole Longitude: -112.754354

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-11-16 Obtained License
1967-11-25 Finished Drilling
1967-11-26 Drill Stem Test Performed
1967-11-28 Drill Stem Test Performed
1967-11-29 Drill Stem Test Performed
1967-11-30 Production Casing Operation Performed
1968-01-09 Well Mode changed to Drilled and Cased
1995-09-05 Well Log Performed
1995-09-06 Perforation Treatment Performed - Jet Perforation
1995-09-06 Well Log Performed
1997-07-22 Well Began Production
1997-07-22 Well Fluid changed to Gas
1997-07-22 Well Mode changed to Flowing
1999-03-02 Well Log Performed
2001-02-03 Well Log Performed
2001-03-03 Perforation Treatment Performed - Jet Perforation
2001-05-15 Perforation Treatment Performed - Fractured
2001-05-15 Well Fluid changed to Gas
2001-05-15 Well Mode changed to Flowing
2003-02-01 Well Fluid changed to Gas
2003-02-01 Well Mode changed to Suspended
2010-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-15 Plug Back Performed
2010-08-15 Well Fluid changed to Gas
2010-08-15 Well Log Performed
2010-08-15 Well Mode changed to Abandoned Zone
2010-08-19 Well Log Performed
2010-08-24 Perforation Treatment Performed - Cement Squeeze
2010-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-30 Perforation Treatment Performed - Jet Perforation
2010-08-30 Plug Back Performed
2010-09-02 Perforation Treatment Performed - Remedial Casing
2011-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-12 Perforation Treatment Performed - Cement Plug
2011-06-12 Perforation Treatment Performed - Jet Perforation
2011-06-14 Perforation Treatment Performed - Jet Perforation
2011-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-15 Perforation Treatment Performed - Remedial Casing
2011-06-16 Perforation Treatment Performed - Cement Plug
2011-06-16 Perforation Treatment Performed - Jet Perforation
2011-06-16 Perforation Treatment Performed - Remedial Casing
2011-06-17 Perforation Treatment Performed - Cement Plug
2011-06-27 Perforation Treatment Performed - Cement Plug
2011-06-29 Perforation Treatment Performed - Jet Perforation
2011-06-29 Perforation Treatment Performed - Remedial Casing
2011-07-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-06 Perforation 1365.50 1366.70 13
2010-09-02 Remedial Casing Cementing 609.00 610.00 0
2011-06-10 Packing Device Capped w/Cement 687.00 695.00 0
2011-06-11 Packing Device Capped w/Cement 592.00 600.00 0
2011-06-12 Perforation 582.00 583.50 17
2011-06-12 Cement Plug 570.00 592.00 0
2011-06-14 Perforation 464.00 465.00 17
2011-06-15 Remedial Casing Cementing 464.00 465.00 0
2011-06-15 Packing Device Capped w/Cement 450.00 460.00 0
2011-06-16 Perforation 440.00 441.00 17
2011-06-16 Remedial Casing Cementing 440.00 441.00 0
2001-03-03 Perforation 1179.60 1181.60 13
2011-06-16 Cement Plug 434.00 450.00 0
2011-06-17 Cement Plug 422.20 434.00 0
2011-06-27 Cement Plug 334.40 379.40 0
2011-06-29 Perforation 278.50 280.00 17
2011-06-29 Remedial Casing Cementing 278.50 280.00 0
2011-07-01 Packing Device Capped w/Cement 221.00 270.00 0
2011-07-03 Packing Device Capped w/Cement 99.50 131.00 0
2001-05-15 Fracture 1179.60 1181.60 0
2010-08-15 Packing Device Capped w/Cement 1352.00 1360.00 0
2010-08-24 Cement Squeeze 1179.60 1181.60 0
2010-08-30 Perforation 700.00 701.00 20
2010-08-30 Packing Device Capped w/Cement 1162.00 1170.00 0
2010-08-30 Perforation 609.00 610.00 20
2010-09-02 Remedial Casing Cementing 700.00 701.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3771 0.0 0.0 0.0
1998 8336 0.0 0.0 0.0
1999 8439 0.0 0.0 0.0
2000 7484 0.0 0.0 0.0
2001 1160 0.0 0.0 0.0

For data sources see[5]

References