X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0354202206000"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0354202206000
 
| Well ID: 0354202206000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.0173521, -112.7820366 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.017357, -112.781848 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: SHAMAN ET AL FENNBV 6-22-35-20
+
| Location: 00/06-22-035-20W4/0
 
|-
 
|-
| Operator:
+
| Location Alias: 00/06-22-35-20 W4M
 +
|-
 +
| Location Alias 2: 00/06-22-035-20 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 035
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 22
 +
|-
 +
| County/Municipality: [[County of Stettler No. 6,_Alberta|County of Stettler No. 6]]
 +
|-
 +
| Well Name: TEAC FENNBV 6-22-35-20
 +
|-
 +
| Operator Name: [[Trident Exploration (Alberta) Corp.]]
 +
|-
 +
| License Number: 0013085
 
|-
 
|-
 
| License Date: 1957-02-13
 
| License Date: 1957-02-13
 
|-
 
|-
| Final Drilling Date: 1957-03-14
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1957-02-18
 +
|-
 +
| Final Drill Date: 1957-03-14
 +
|-
 +
| Well Total Depth: 1631.30 m
 +
|-
 +
| Surface Hole Latitude: 52.017357
 +
|-
 +
| Surface Hole Longitude: -112.781848
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1957-02-13
 +
| Obtained License
 +
|-
 +
| 1957-03-14
 +
| Drill Stem Test Performed
 +
|-
 +
| 1957-03-14
 +
| Finished Drilling
 +
|-
 +
| 1957-03-14
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1957-03-15
 +
| Well Log Performed
 +
|-
 +
| 1957-03-16
 +
| Production Casing Operation Performed
 +
|-
 +
| 1957-03-16
 +
| Well Log Performed
 +
|-
 +
| 1957-03-18
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1957-03-19
 +
| Well Began Production
 +
|-
 +
| 1957-03-19
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1957-03-19
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1989-07-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1989-07-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1991-05-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1991-05-11
 +
| Plug Back Performed
 +
|-
 +
| 1991-05-11
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1991-05-11
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1991-06-12
 +
| Well Log Performed
 +
|-
 +
| 1991-06-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-02-21
 +
| Perforation Treatment Performed - Bridge Plug No Cement Required
 +
|-
 +
| 2012-02-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-02-29
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2012-03-10
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| Total Depth: 1631.3m
+
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1957-03-18
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1628.20
 +
| style="text-align: right;" | 1631.30
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Abandoned Zone
+
| 2012-02-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 413.50
 +
| style="text-align: right;" | 414.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2012-02-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 375.00
 +
| style="text-align: right;" | 376.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 2012-02-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 200.00
 +
| style="text-align: right;" | 201.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Violations:
+
| 1991-05-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1609.30
 +
| style="text-align: right;" | 1617.30
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 52.0173521
+
| 1991-06-13
 +
| Perforation
 +
| style="text-align: right;" | 1332.00
 +
| style="text-align: right;" | 1334.50
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Longitude: -112.7820366
+
| 2012-02-21
 +
| Bridge Plug, No Cement
 +
| style="text-align: right;" | 1311.20
 +
| style="text-align: right;" | 1313.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-23
 +
| Perforation
 +
| style="text-align: right;" | 658.00
 +
| style="text-align: right;" | 659.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2012-02-23
 +
| Perforation
 +
| style="text-align: right;" | 413.50
 +
| style="text-align: right;" | 414.50
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2012-02-23
 +
| Perforation
 +
| style="text-align: right;" | 375.00
 +
| style="text-align: right;" | 376.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2012-02-23
 +
| Perforation
 +
| style="text-align: right;" | 200.00
 +
| style="text-align: right;" | 201.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2012-02-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 658.00
 +
| style="text-align: right;" | 659.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1961
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1967
 +
| style="text-align: right;" | 168
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 408
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1969
 +
| style="text-align: right;" | 3219
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1970
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:22, 31 January 2021

Well Details

Well ID: 0354202206000
Loading map...
Location: 00/06-22-035-20W4/0
Location Alias: 00/06-22-35-20 W4M
Location Alias 2: 00/06-22-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 22
County/Municipality: County of Stettler No. 6
Well Name: TEAC FENNBV 6-22-35-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0013085
License Date: 1957-02-13
License Status: Abandoned
Spud Date: 1957-02-18
Final Drill Date: 1957-03-14
Well Total Depth: 1631.30 m
Surface Hole Latitude: 52.017357
Surface Hole Longitude: -112.781848

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-02-13 Obtained License
1957-03-14 Drill Stem Test Performed
1957-03-14 Finished Drilling
1957-03-14 Well Mode changed to Drilled and Cased
1957-03-15 Well Log Performed
1957-03-16 Production Casing Operation Performed
1957-03-16 Well Log Performed
1957-03-18 Perforation Treatment Performed - Open-Hole Completion
1957-03-19 Well Began Production
1957-03-19 Well Fluid changed to Crude Oil
1957-03-19 Well Mode changed to Flowing
1989-07-01 Well Fluid changed to Crude Oil
1989-07-01 Well Mode changed to Suspended
1991-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-05-11 Plug Back Performed
1991-05-11 Well Fluid changed to Crude Oil
1991-05-11 Well Mode changed to Abandoned Zone
1991-06-12 Well Log Performed
1991-06-13 Perforation Treatment Performed - Jet Perforation
2012-02-21 Perforation Treatment Performed - Bridge Plug No Cement Required
2012-02-23 Perforation Treatment Performed - Jet Perforation
2012-02-29 Perforation Treatment Performed - Remedial Casing
2012-03-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-03-18 Open Hole/Barefoot Completion 1628.20 1631.30 0
2012-02-29 Remedial Casing Cementing 413.50 414.50 0
2012-02-29 Remedial Casing Cementing 375.00 376.00 0
2012-02-29 Remedial Casing Cementing 200.00 201.00 0
1991-05-11 Packing Device Capped w/Cement 1609.30 1617.30 0
1991-06-13 Perforation 1332.00 1334.50 13
2012-02-21 Bridge Plug, No Cement 1311.20 1313.80 0
2012-02-23 Perforation 658.00 659.00 14
2012-02-23 Perforation 413.50 414.50 14
2012-02-23 Perforation 375.00 376.00 14
2012-02-23 Perforation 200.00 201.00 14
2012-02-29 Remedial Casing Cementing 658.00 659.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 168 0.0 0.0 0.0
1968 408 0.0 0.0 0.0
1969 3219 0.0 0.0 0.0
1970 360 0.0 0.0 0.0

For data sources see[5]

References