If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 15: | Line 15: | ||
| Municipality: [[Busti,_Chautauqua_County,_New_York|Busti]] | | Municipality: [[Busti,_Chautauqua_County,_New_York|Busti]] | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[Vertical Energy Inc.]] |
|- | |- | ||
| Well Status: Active | | Well Status: Active |
Well ID: 31-013-11577 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.006799999,"lon":-79.27588,"icon":""}]} |
Well Name: Crandall 2-11 | |
Country: United States | |
State: New York | |
County: Chautauqua | |
Municipality: Busti | |
Operator Name: Vertical Energy Inc. | |
Well Status: Active | |
Spud Date: | |
Permit Date: 1975-08-27 | |
Well Completion Date: 1976-03-26 | |
Configuration: Vertical | |
Measured Well Depth (ft): 785 | |
Latitude: 42.006799999 | |
Longitude: -79.27588000 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2000 | Vertical Energy Inc. | OIL | 6.48 Bbl | 12 Months |
2001 | Vertical Energy Inc. | GAS | 0 Mcf | 2 Months |
2001 | Vertical Energy Inc. | OIL | 15 Bbl | 2 Months |
2002 | Vertical Energy Inc. | GAS | 0 Mcf | 2 Months |
2002 | Vertical Energy Inc. | OIL | 11 Bbl | 2 Months |
2003 | Vertical Energy Inc. | OIL | 17.37 Bbl | 12 Months |
2004 | Vertical Energy Inc. | OIL | 16 Bbl | 12 Months |
2005 | Vertical Energy Inc. | OIL | 15 Bbl | 12 Months |
2006 | Vertical Energy Inc. | OIL | 10 Bbl | 12 Months |
2008 | Vertical Energy Inc. | GAS | 0 Mcf | 0 Months |
2008 | Vertical Energy Inc. | OIL | 0 Bbl | 0 Months |
2009 | Vertical Energy Inc. | GAS | 0 Mcf | 12 Months |
2009 | Vertical Energy Inc. | OIL | 2 Bbl | 12 Months |
2010 | Vertical Energy Inc. | OIL | 5 Bbl | 12 Months |
2011 | Vertical Energy Inc. | OIL | 5 Bbl | 12 Months |
2012 | Vertical Energy Inc. | GAS | 0 Mcf | 12 Months |
2012 | Vertical Energy Inc. | OIL | 17 Bbl | 12 Months |
2013 | Vertical Energy Inc. | GAS | 1 Mcf | 12 Months |
2013 | Vertical Energy Inc. | OIL | 2 Bbl | 12 Months |
2014 | Vertical Energy Inc. | GAS | 1 Mcf | 12 Months |
2014 | Vertical Energy Inc. | OIL | 2 Bbl | 12 Months |
2015 | Vertical Energy Inc. | GAS | 1 Mcf | 12 Months |
2015 | Vertical Energy Inc. | OIL | 15 Bbl | 12 Months |
2016 | Vertical Energy Inc. | GAS | 1 Mcf | 12 Months |
2016 | Vertical Energy Inc. | OIL | 5 Bbl | 12 Months |
2017 | Vertical Energy Inc. | GAS | 1 Mcf | 12 Months |
2017 | Vertical Energy Inc. | OIL | 4 Bbl | 12 Months |
2018 | Vertical Energy Inc. | GAS | 1 Mcf | 12 Months |
2018 | Vertical Energy Inc. | OIL | 4 Bbl | 12 Months |
For data sources see[2]
Period | Operator | Waste Type | Quantity | Time Produced |
---|---|---|---|---|
2001 | Vertical Energy Inc. | WATER | 2 Bbl | 2 Months |
2002 | Vertical Energy Inc. | WATER | 1 Bbl | 2 Months |
2003 | Vertical Energy Inc. | WATER | 4 Bbl | 12 Months |
2004 | Vertical Energy Inc. | WATER | 2 Bbl | 12 Months |
2005 | Vertical Energy Inc. | WATER | 2 Bbl | 12 Months |
2006 | Vertical Energy Inc. | WATER | 2 Bbl | 12 Months |
2008 | Vertical Energy Inc. | WATER | 0 Bbl | 0 Months |
2009 | Vertical Energy Inc. | WATER | 1 Bbl | 12 Months |
2010 | Vertical Energy Inc. | WATER | 1 Bbl | 12 Months |
2011 | Vertical Energy Inc. | WATER | 1 Bbl | 12 Months |
2012 | Vertical Energy Inc. | WATER | 1 Bbl | 12 Months |
2013 | Vertical Energy Inc. | WATER | 1 Bbl | 12 Months |
2014 | Vertical Energy Inc. | WATER | 1 Bbl | 12 Months |
2015 | Vertical Energy Inc. | WATER | 2 Bbl | 12 Months |
2016 | Vertical Energy Inc. | WATER | 1 Bbl | 12 Months |
2017 | Vertical Energy Inc. | WATER | 1 Bbl | 12 Months |
2018 | Vertical Energy Inc. | WATER | 0 Bbl | 12 Months |
For data sources see[2]
Event Date | Event Description |
---|---|
1975-08-27 | New Permit Issued. |
For data sources see[1]