X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-015-21462"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-015-21462
 
| Well ID: 37-015-21462
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.795205, -76.427069 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.795205, -76.427069 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Bradford County, Pennsylvania|Bradford]]
 
| County: [[Bradford County, Pennsylvania|Bradford]]
Line 9: Line 9:
 
| Municipality: [[Wysox Township, Bradford County, Pennsylvania|Wysox Township]]
 
| Municipality: [[Wysox Township, Bradford County, Pennsylvania|Wysox Township]]
 
|-
 
|-
| Operator Name: [[CHESAPEAKE APPALACHIA LLC|CHESAPEAKE APPALACHIA LLC]]
+
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[148444]]
+
| Well Pad ID: [[148444|148444]]
 
|-
 
|-
 
| Farm/Lease Name: GREGORY 1H
 
| Farm/Lease Name: GREGORY 1H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Violations: 0
 
|-
 
|-
 
| Latitude: 41.795205
 
| Latitude: 41.795205
 
|-
 
|-
 
| Longitude: -76.427069
 
| Longitude: -76.427069
|-
 
|}
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | DATE
 
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
|-
 
| 1996009
 
| 2011-08-12
 
| No Violations Noted
 
| Currently at 353'.  No shows of water of gas on top hole.  Will test BOPs on 13 3/8.
 
 
20 set at 94'
 
13 3/8 will be set at approx 743.  FIT test planned on 13 3/8.  will use lime for processing cuttings
 
 
ETD 12219
 
KP planned on 5719
 
 
Top hole drilled with water based mud
 
Inter plan on Intermediate
 
KO plan on drilling with synthetic
 
|
 
 
|-
 
|-
 
|}
 
|}
Line 69: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2012-2
+
| 2010-2
| style="text-align:right;" | 458083.0
+
| style="text-align:right;" | 0.0
| style="text-align:right;" | 184.0
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2010-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 87: Line 89:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2012-2
 +
| style="text-align:right;" | 458083.0
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 324357.0
 +
| style="text-align:right;" | 181.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-2
 +
| style="text-align:right;" | 306709.0
 +
| style="text-align:right;" | 183.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 96: Line 116:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2014-1
 +
| style="text-align:right;" | 282490.0
 +
| style="text-align:right;" | 179.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 260897.0
 +
| style="text-align:right;" | 182.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 105: Line 134:
 
|-
 
|-
 
|-
 
|-
| 2010-2
+
| 2015-02
 +
| style="text-align:right;" | 3405.0
 +
| style="text-align:right;" | 4.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-01
 +
| style="text-align:right;" | 32679.0
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 2822.0
 +
| style="text-align:right;" | 6.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 114: Line 161:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 125: Line 178:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 +
|-
 +
| 2011-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 100.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR DRILLING OR PLUGGING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2011-2
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 2.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE OF BRINE TO FRAC A WELL
 +
|
 +
|
 +
|-
 +
|-
 +
| 2012-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 2.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| 2012-2
 
| 2012-2
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 3253.0
+
| style="text-align:right;" | 3.0
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 137: Line 223:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2013-1
| DRILLING FLUID WASTE
+
| PRODUCED FLUID
| style="text-align:right;" | 100.0
+
| style="text-align:right;" | 843.69
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 461.0
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR DRILLING OR PLUGGING
+
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 
|  
 
|  
| PA
 
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2014-1
| DRILLING FLUID WASTE
+
| PRODUCED FLUID
| style="text-align:right;" | 2005.0
+
| style="text-align:right;" | 537.6
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE OF BRINE TO FRAC A WELL
+
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2014-2
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 2186.8
+
| style="text-align:right;" | 284.18
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
+
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1996009
 +
| 2011-08-12
 +
| No Violations Noted
 +
| Currently at 353'.  No shows of water of gas on top hole.  Will test BOPs on 13 3/8.
  
 +
20 set at 94'
 +
13 3/8 will be set at approx 743.  FIT test planned on 13 3/8.  will use lime for processing cuttings
 +
 +
ETD 12219
 +
KP planned on 5719
 +
 +
Top hole drilled with water based mud
 +
Inter plan on Intermediate
 +
KO plan on drilling with synthetic
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2178298
 +
| 2013-06-03
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Inspection Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 01:35, 25 June 2015

Well Details

Well ID: 37-015-21462
Loading map...
County: Bradford
Municipality: Wysox Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148444
Farm/Lease Name: GREGORY 1H
First Permit Date: 2011-02-08
Last Permit Date: 2011-02-08
Spud Date: 2011-03-05
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 41.795205
Longitude: -76.427069

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 194434.0 47.0 0.0 0.0 0.0 0.0
2012-2 458083.0 184.0 0.0 0.0 0.0 0.0
2013-1 324357.0 181.0 0.0 0.0 0.0 0.0
2013-2 306709.0 183.0 0.0 0.0 0.0 0.0
2014-1 282490.0 179.0 0.0 0.0 0.0 0.0
2014-2 260897.0 182.0 0.0 0.0 0.0 0.0
2015-02 3405.0 4.0 0.0 0.0 0.0 0.0
2015-01 32679.0 31.0 0.0 0.0 0.0 0.0
2015-03 2822.0 6.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-1 DRILLING FLUID WASTE 100.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-2 DRILLING FLUID WASTE 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2012-1 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-1 PRODUCED FLUID 843.69 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-2 PRODUCED FLUID 461.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 537.6 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 284.18 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1996009 2011-08-12 No Violations Noted Currently at 353'. No shows of water of gas on top hole. Will test BOPs on 13 3/8.

20 set at 94' 13 3/8 will be set at approx 743. FIT test planned on 13 3/8. will use lime for processing cuttings

ETD 12219 KP planned on 5719

Top hole drilled with water based mud Inter plan on Intermediate KO plan on drilling with synthetic

2178298 2013-06-03 No Violations Noted

For data sources see[3]

References