X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28797"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28797
 
| Well ID: 37-129-28797
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.474733, -79.5692 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.474733, -79.5692 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
Line 9: Line 9:
 
| Municipality: [[Washington Township, Westmoreland County, Pennsylvania|Washington Township]]
 
| Municipality: [[Washington Township, Westmoreland County, Pennsylvania|Washington Township]]
 
|-
 
|-
| Operator Name: [[CNX GAS CO LLC|CNX GAS CO LLC]]
+
| Operator Name: [[CNX GAS CO LLC]]
 
|-
 
|-
| Well Pad ID: [[148819]]
+
| Well Pad ID: [[148819|148819]]
 +
|-
 +
| Farm/Lease Name: MAMONT SOUTH 1E
 
|-
 
|-
 
| First Permit Date: 2012-07-05
 
| First Permit Date: 2012-07-05
 
|-
 
|-
| Last Permit Date: 2012-07-05
+
| Last Permit Date: 2013-07-24
 
|-
 
|-
| Spud Date: None
+
| Spud Date: 2013-06-10
 
|-
 
|-
 
| Unconventional: Yes
 
| Unconventional: Yes
Line 23: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 1
 
|-
 
|-
 
| Latitude: 40.474733
 
| Latitude: 40.474733
Line 30: Line 34:
 
|-
 
|-
 
|}
 
|}
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | GAS QUANTITY
 +
!scope="col" | GAS PRODUCTION DAYS
 +
!scope="col" | CONDENSATE QUANTITY
 +
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 235672.86
 +
| style="text-align:right;" | 46.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 487940.44
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 52039.25
 +
| style="text-align:right;" | 28.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-01
 +
| style="text-align:right;" | 61253.76
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 56039.6
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | TYPE
 +
!scope="col" | QUANTITY
 +
!scope="col" | UNITS
 +
!scope="col" | DISPOSAL METHOD
 +
!scope="col" | WASTE FACILITY PERMIT ID
 +
!scope="col" | WASTE FACILITY NAME
 +
!scope="col" | FACILITY CITY
 +
!scope="col" | FACILITY STATE
 +
|-
 +
| 2013-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 1.0
 +
| Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| PAD004835146
 +
| MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY
 +
| YUKON
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 253.62
 +
| Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| PAD004835146
 +
| MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY
 +
| YUKON
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 45.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 0.27
 +
| Bbl
 +
| LANDFILL
 +
| 100434
 +
| EVERGREEN LANDFILL
 +
| BLAIRSVILLE
 +
| PA
 +
|-
 +
|-
 +
| 2014-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 28.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 4.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| SERVICING FLUID
 +
| style="text-align:right;" | 0.14
 +
| Bbl
 +
| LANDFILL
 +
| 100434
 +
| EVERGREEN LANDFILL
 +
| BLAIRSVILLE
 +
| PA
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 28.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 37: Line 226:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 2132724
 
| 2132724
Line 42: Line 233:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the Operator was in the process of cutting and removing trees and underbrush.  The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed.  No observation of accelerated E&S issue in relation to proposed well pad area or the access road.  The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 
| At the time of inspection the Operator was in the process of cutting and removing trees and underbrush.  The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed.  No observation of accelerated E&S issue in relation to proposed well pad area or the access road.  The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 49: Line 242:
 
| No Violations Noted
 
| No Violations Noted
 
| no violations noted
 
| no violations noted
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2152939
 +
| 2013-04-02
 +
| No Violations Noted
 +
| At the time of inspection the Operator was in the process of constructing the site.  At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed.  No observation of accelerated E&S issue in relation to proposed well pad area or the access road.  The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2163818
 +
| 2013-05-06
 +
| No Violations Noted
 +
| At the time of inspection the Operator was in the process of constructing the site.  At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed.  No observation of accelerated E&S issue in relation to proposed well pad area or the access road.  The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2174970
 +
| 2013-06-13
 +
| In Compliance with Policy
 +
| Inspection the result of the Operator reporting a breached BMP during a precipitation event.  The Operator is in compliance with the Departments notification policy for a BMP breach.  During the inspection the Department notes that an infiltration ditch located closest to the access road failed during a heavy precipitation event in the early morning hours on 6/13/2013.  The failure resulted in material from the infiltration ditch being washed into a 32" silt sox, which did not contain the material and also failed.  The two failures resulted is accelerated erosion of the access road and scouring of a hillside below the excavated pad area.  The precipitation event appears to exceed the Departments criteria for construction standards.  The Operators response was to rebuild the failed portion of the infiltration ditch, add an additional rock outlet and repair the silt sox.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2175886
 +
| 2013-06-13
 +
| No Violations Noted
 +
| Well not spud in at time of inspection.  Inspection conducted w/OGI J. Branan.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2177614
 +
| 2013-05-24
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was located onsite and placed on containment.  The Department notes that the Operator replaced the silt sox, installed an additional rock outlet, and repaired the failed earthen dike surrounding the well site.  The Department has also notes that the additions have been added to the E&S plan.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2182019
 +
| 2013-07-05
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was located onsite and placed on containment.  No observation of accelerated erosion or sedimentation in relation to the access road or well site.  The E&S plan was on site and all associated BMPs appear to be installed as outlined on the plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2182380
 +
| 2013-07-09
 +
| No Violations Noted
 +
| Waiting on rig to commence tophole drilling.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2185975
 +
| 2013-07-24
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2189814
 +
| 2013-08-06
 +
| Violation(s) Noted
 +
| Inspection the result of a spill reported to the Department on 8/6/2013 at 11:50am.  The Department recognizes that the Operator in in compliance with the Departments spill policy.  At the time of inspection the Operator indicated that approximately 1.5 barrels of drilling water spilled off of containment. The Operator indicated the drilling water contained liquid aluminum, defoamer, flocculants and surfactants.  The MSDS sheets for these substances were on site and supplied to the Department upon request.  During the inspection the Operator vacuumed the affected area and excavated the affected media for disposal.  The affected area was approximately 20'x25'x8".  The Department suggests the Operator submit confirmatory sample results of the drilling water, affected media and background to verify clean up.
 +
| 674641
 +
| 78.54 - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
 +
|
 +
|-
 +
|-
 +
| 2189901
 +
| 2013-08-01
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2195036
 +
| 2013-08-07
 +
| No Violations Noted
 +
| Falcon rig#28 Schramm 200 shut down and waiting on 4ï¾” pipe ram rubber at time of inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2209077
 +
| 2013-10-02
 +
| No Violations Noted
 +
| CEI inspection in response to violations written to the Operator on 8/6/2013.  The issues resulting in violations have been corrected.  The Department has received Operators 15 and 30 day responses, which is in compliance with the Department spill policy.  The Department has also received confirmatory samples. At the time of inspection the well was drilled to KOP.  The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2216398
 +
| 2013-10-25
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled to KOP.  The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2217799
 +
| 2013-10-23
 +
| No Violations Noted
 +
| Waiting on rig to commence lateral drilling.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2222912
 +
| 2013-11-14
 +
| No Violations Noted
 +
| CalFrac cementing 5 1/2ï¾” at time of inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2226523
 +
| 2013-11-26
 +
| No Violations Noted
 +
| Waiting on frac.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2243103
 +
| 2014-02-06
 +
| No Violations Noted
 +
| At the time of inspection the Operator was actively preparing the site for stimulation.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2249735
 +
| 2014-02-18
 +
| No Violations Noted
 +
| At the time of inspection the Operator was actively stimulating the wells located onsite.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2249754
 +
| 2014-03-03
 +
| No Violations Noted
 +
| See inspection # 2249702 for events and description from the 3/3/2014 inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2253174
 +
| 2014-03-13
 +
| No Violations Noted
 +
| See inspection # 2253170 for events and description from the 3/13/2014 inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2360468
 +
| 2015-04-13
 +
| No Violations Noted
 +
| Inspection in response to a Well Site Restoration Report file by the Operator on 11-24-2014. At the time of inspection all earth disturbance activities
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2361184
 +
| 2015-04-08
 +
| No Violations Noted
 +
| Well operating and properly identified. Well equipped with production unit (separation
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Oil and Gas Historical Inspection Report
!scope="col" | PERIOD
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
!scope="col" | GAS QUANTITY
+
| date = 2015-05-26
!scope="col" | GAS PRODUCTION DAYS
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
!scope="col" | CONDENSATE QUANTITY
+
| accessdate = 2015-05-27 }}</ref>
!scope="col" | CONDENSATE PRODUCTION DAYS
+
== References ==
!scope="col" | OIL QUANTITY
+
{{reflist}}
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
==References==
 
{{Reflist}}
 
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 05:08, 25 June 2015

Well Details

Well ID: 37-129-28797
Loading map...
County: Westmoreland
Municipality: Washington Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 148819
Farm/Lease Name: MAMONT SOUTH 1E
First Permit Date: 2012-07-05
Last Permit Date: 2013-07-24
Spud Date: 2013-06-10
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 1
Latitude: 40.474733
Longitude: -79.5692

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 235672.86 46.0 0.0 0.0 0.0 0.0
2014-2 487940.44 184.0 0.0 0.0 0.0 0.0
2015-02 52039.25 28.0 0.0 0.0 0.0 0.0
2015-01 61253.76 31.0 0.0 0.0 0.0 0.0
2015-03 56039.6 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-2 DRILL CUTTINGS 1.0 Tons RESIDUAL WASTE TRANSFER FACILITY PAD004835146 MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY YUKON PA
2013-2 DRILLING FLUID WASTE 253.62 Bbl RESIDUAL WASTE TRANSFER FACILITY PAD004835146 MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY YUKON PA
2013-2 FRACING FLUID WASTE 45.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FRACING FLUID WASTE 0.27 Bbl LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2014-1 FRACING FLUID WASTE 28.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 SERVICING FLUID 0.14 Bbl LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2014-2 PRODUCED FLUID 28.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2132724 2013-01-22 No Violations Noted At the time of inspection the Operator was in the process of cutting and removing trees and underbrush. The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2139212 2013-02-13 No Violations Noted no violations noted
2152939 2013-04-02 No Violations Noted At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2163818 2013-05-06 No Violations Noted At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2174970 2013-06-13 In Compliance with Policy Inspection the result of the Operator reporting a breached BMP during a precipitation event. The Operator is in compliance with the Departments notification policy for a BMP breach. During the inspection the Department notes that an infiltration ditch located closest to the access road failed during a heavy precipitation event in the early morning hours on 6/13/2013. The failure resulted in material from the infiltration ditch being washed into a 32" silt sox, which did not contain the material and also failed. The two failures resulted is accelerated erosion of the access road and scouring of a hillside below the excavated pad area. The precipitation event appears to exceed the Departments criteria for construction standards. The Operators response was to rebuild the failed portion of the infiltration ditch, add an additional rock outlet and repair the silt sox. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2175886 2013-06-13 No Violations Noted Well not spud in at time of inspection. Inspection conducted w/OGI J. Branan.
2177614 2013-05-24 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. The Department notes that the Operator replaced the silt sox, installed an additional rock outlet, and repaired the failed earthen dike surrounding the well site. The Department has also notes that the additions have been added to the E&S plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2182019 2013-07-05 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. No observation of accelerated erosion or sedimentation in relation to the access road or well site. The E&S plan was on site and all associated BMPs appear to be installed as outlined on the plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2182380 2013-07-09 No Violations Noted Waiting on rig to commence tophole drilling.
2185975 2013-07-24 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2189814 2013-08-06 Violation(s) Noted Inspection the result of a spill reported to the Department on 8/6/2013 at 11:50am. The Department recognizes that the Operator in in compliance with the Departments spill policy. At the time of inspection the Operator indicated that approximately 1.5 barrels of drilling water spilled off of containment. The Operator indicated the drilling water contained liquid aluminum, defoamer, flocculants and surfactants. The MSDS sheets for these substances were on site and supplied to the Department upon request. During the inspection the Operator vacuumed the affected area and excavated the affected media for disposal. The affected area was approximately 20'x25'x8". The Department suggests the Operator submit confirmatory sample results of the drilling water, affected media and background to verify clean up. 674641 78.54 - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
2189901 2013-08-01 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2195036 2013-08-07 No Violations Noted Falcon rig#28 Schramm 200 shut down and waiting on 4ï¾” pipe ram rubber at time of inspection.
2209077 2013-10-02 No Violations Noted CEI inspection in response to violations written to the Operator on 8/6/2013. The issues resulting in violations have been corrected. The Department has received Operators 15 and 30 day responses, which is in compliance with the Department spill policy. The Department has also received confirmatory samples. At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2216398 2013-10-25 No Violations Noted At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2217799 2013-10-23 No Violations Noted Waiting on rig to commence lateral drilling.
2222912 2013-11-14 No Violations Noted CalFrac cementing 5 1/2ï¾” at time of inspection.
2226523 2013-11-26 No Violations Noted Waiting on frac.
2243103 2014-02-06 No Violations Noted At the time of inspection the Operator was actively preparing the site for stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2249735 2014-02-18 No Violations Noted At the time of inspection the Operator was actively stimulating the wells located onsite. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2249754 2014-03-03 No Violations Noted See inspection # 2249702 for events and description from the 3/3/2014 inspection.
2253174 2014-03-13 No Violations Noted See inspection # 2253170 for events and description from the 3/13/2014 inspection.
2360468 2015-04-13 No Violations Noted Inspection in response to a Well Site Restoration Report file by the Operator on 11-24-2014. At the time of inspection all earth disturbance activities
2361184 2015-04-08 No Violations Noted Well operating and properly identified. Well equipped with production unit (separation

For data sources see[3]

References