Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28315
 
| Well ID: 37-129-28315
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.180791, -79.481966 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.180791, -79.481966 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[Mount Pleasant Township, Westmoreland County, Pennsylvania|Mount Pleasant Township]]
 
|-
 
|-
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: HUTTER 002
 
|-
 
|-
 
| First Permit Date: 2010-03-29
 
| First Permit Date: 2010-03-29
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.180791
 
| Latitude: 40.180791
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2010-0
| style="text-align:right;" | 9195.0
+
| style="text-align:right;" | 2800.0
 +
| style="text-align:right;" | 122.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 10532.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2013-0
| style="text-align:right;" | 10532.0
+
| style="text-align:right;" | 9195.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2014-0
| style="text-align:right;" | 2800.0
+
| style="text-align:right;" | 7621.0
| style="text-align:right;" | 122.0
+
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 70: Line 89:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 82: Line 107:
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 
|-
 
|-
| 2012-0
+
| 2010-0
| PRODUCED FLUID
+
| DRILLING FLUID WASTE
| style="text-align:right;" | 70.0
+
| style="text-align:right;" | 330.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095273
+
| PA0091472
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
| JOSEPHINE
+
| SALTSBURG
 
| PA
 
| PA
 
|-
 
|-
Line 99: Line 124:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
Line 105: Line 130:
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| DRILLING FLUID WASTE
+
| FRACING FLUID WASTE
| style="text-align:right;" | 330.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2012-0
| FRACING FLUID WASTE
+
| PRODUCED FLUID
| style="text-align:right;" | 1080.0
+
| style="text-align:right;" | 70.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PA0095273
| TUNNELTON LIQUIDS COMPANY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
| SALTSBURG
+
| JOSEPHINE
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2012-0
+
| 2014-0
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 70.0
+
| style="text-align:right;" | 20.0
 
| Bbl
 
| Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 144: Line 175:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1906640
 
| 1906640
Line 149: Line 182:
 
| No Violations Noted
 
| No Violations Noted
 
| Site constructed, drilling had not commenced.  E&S controls had been implemented as outlined in the E&S plan.  No accelerated erosion & sedimentation was observed in relation to the access road or well-site.  Noted that the below grade pit located onsite was holding approximately one to two feet of water.  After checking the observed weather history for the area it was found that no substantial rain events had occurred in the vicinity of the well pad area.  Before utilizing the below grade pit the operator should remove all of the standing water and insure that the bottom of the pit is at least 20 inches above the seasonal high groundwater table.  Verified with operator representative Mike Cioffi that the drill cuttings were to be land farmed.
 
| Site constructed, drilling had not commenced.  E&S controls had been implemented as outlined in the E&S plan.  No accelerated erosion & sedimentation was observed in relation to the access road or well-site.  Noted that the below grade pit located onsite was holding approximately one to two feet of water.  After checking the observed weather history for the area it was found that no substantial rain events had occurred in the vicinity of the well pad area.  Before utilizing the below grade pit the operator should remove all of the standing water and insure that the bottom of the pit is at least 20 inches above the seasonal high groundwater table.  Verified with operator representative Mike Cioffi that the drill cuttings were to be land farmed.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 156: Line 191:
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling was ongoing at the time of the inspection.  Met onsite with operator representative Mike Cioffi.  Mr. Cioffi stated that the pit had been drained of the rainwater prior to lining.  Noted no evidence that water had begun to seep in underneath the pit liner as a result of a shallow seasonal high groundwater table.
 
| Drilling was ongoing at the time of the inspection.  Met onsite with operator representative Mike Cioffi.  Mr. Cioffi stated that the pit had been drained of the rainwater prior to lining.  Noted no evidence that water had begun to seep in underneath the pit liner as a result of a shallow seasonal high groundwater table.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 17:57, 25 June 2015

Well Details

Well ID: 37-129-28315
Loading map...
County: Westmoreland
Municipality: Mount Pleasant Township
Operator Name: KRIEBEL MINERALS INC
Well Pad ID:
Farm/Lease Name: HUTTER 002
First Permit Date: 2010-03-29
Last Permit Date: 2010-03-29
Spud Date: 2010-08-18
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.180791
Longitude: -79.481966

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 2800.0 122.0 0.0 0.0 0.0 0.0
2011-0 10532.0 334.0 0.0 0.0 0.0 0.0
2012-0 10291.0 335.0 0.0 0.0 0.0 0.0
2013-0 9195.0 334.0 0.0 0.0 0.0 0.0
2014-0 7621.0 334.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 DRILLING FLUID WASTE 330.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 FRACING FLUID WASTE 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-0 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2012-0 PRODUCED FLUID 70.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2014-0 PRODUCED FLUID 20.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1906640 2010-08-17 No Violations Noted Site constructed, drilling had not commenced. E&S controls had been implemented as outlined in the E&S plan. No accelerated erosion & sedimentation was observed in relation to the access road or well-site. Noted that the below grade pit located onsite was holding approximately one to two feet of water. After checking the observed weather history for the area it was found that no substantial rain events had occurred in the vicinity of the well pad area. Before utilizing the below grade pit the operator should remove all of the standing water and insure that the bottom of the pit is at least 20 inches above the seasonal high groundwater table. Verified with operator representative Mike Cioffi that the drill cuttings were to be land farmed.
1907428 2010-08-20 No Violations Noted Drilling was ongoing at the time of the inspection. Met onsite with operator representative Mike Cioffi. Mr. Cioffi stated that the pit had been drained of the rainwater prior to lining. Noted no evidence that water had begun to seep in underneath the pit liner as a result of a shallow seasonal high groundwater table.