If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-003-22157 | | Well ID: 37-003-22157 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.212797, -79.882661 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Allegheny County, Pennsylvania|Allegheny]] | ||
+ | |- | ||
+ | | Municipality: [[Forward Township, Allegheny County, Pennsylvania|Forward Township]] | ||
|- | |- | ||
| Operator Name: [[KRIEBEL MINERALS INC]] | | Operator Name: [[KRIEBEL MINERALS INC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: CANTONI 003 | ||
|- | |- | ||
| First Permit Date: 2010-12-13 | | First Permit Date: 2010-12-13 | ||
Line 17: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
− | | Violations: | + | | Well Status: ORND |
+ | |- | ||
+ | | Violations: 0 | ||
|- | |- | ||
| Latitude: 40.212797 | | Latitude: 40.212797 | ||
Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|- | |- | ||
− | | | + | | 2010-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 0.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 0.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
− | |||
− | |||
|- | |- | ||
|- | |- | ||
Line 61: | Line 62: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2012-0 |
+ | | style="text-align:right;" | 6969.0 | ||
+ | | style="text-align:right;" | 335.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 75.0 | ||
+ | | style="text-align:right;" | 335.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 5222.0 | ||
+ | | style="text-align:right;" | 334.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 55.0 | ||
+ | | style="text-align:right;" | 334.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 3778.0 | ||
+ | | style="text-align:right;" | 332.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 40.0 | ||
+ | | style="text-align:right;" | 332.0 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 82: | Line 107: | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
|- | |- | ||
− | | | + | | 2011-0 |
− | | | + | | DRILLING FLUID WASTE |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 1.0 |
| Bbl | | Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0091472 |
− | | | + | | TUNNELTON LIQUIDS TREATMENT FACILITY |
− | + | | SALTSBURG | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
| PA | | PA | ||
|- | |- | ||
Line 110: | Line 124: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095443 | | PA0095443 | ||
− | | | + | | CREEKSIDE TREATMENT FACILITY |
| CREEKSIDE | | CREEKSIDE | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| PA | | PA | ||
|- | |- | ||
Line 132: | Line 135: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0091472 | | PA0091472 | ||
− | | TUNNELTON LIQUIDS | + | | TUNNELTON LIQUIDS TREATMENT FACILITY |
| SALTSBURG | | SALTSBURG | ||
| PA | | PA | ||
Line 143: | Line 146: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095443 | | PA0095443 | ||
− | | | + | | CREEKSIDE TREATMENT FACILITY |
| CREEKSIDE | | CREEKSIDE | ||
| PA | | PA | ||
Line 154: | Line 157: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
− | | PA | + | | FLUID RECOVERY SERVICE JOSEPHINE FACILITY |
+ | | JOSEPHINE | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 22.0 | ||
+ | | Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095273 | ||
+ | | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | ||
| JOSEPHINE | | JOSEPHINE | ||
| PA | | PA | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 166: | Line 186: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1947949 | | 1947949 | ||
Line 171: | Line 193: | ||
| No Violations Noted | | No Violations Noted | ||
| On January 12th, 2010 I visited this site as a routine inspection. Drilling had not yet started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad. | | On January 12th, 2010 I visited this site as a routine inspection. Drilling had not yet started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 178: | Line 202: | ||
| No Violations Noted | | No Violations Noted | ||
| On January 14th, 2011 I visited this site as a routine inspection. Drilling had started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad. | | On January 14th, 2011 I visited this site as a routine inspection. Drilling had started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 185: | Line 211: | ||
| No Violations Noted | | No Violations Noted | ||
| On January 20th, 2011 I visited this site as a routine inspection. Drilling was taking place. The access road was beginning to need maintenance. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | | On January 20th, 2011 I visited this site as a routine inspection. Drilling was taking place. The access road was beginning to need maintenance. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 192: | Line 220: | ||
| No Violations Noted | | No Violations Noted | ||
| SITE IS BUILT. PIT IS NOT LINED. NO RIG. | | SITE IS BUILT. PIT IS NOT LINED. NO RIG. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 200: | Line 230: | ||
| FALCON RIG #19 DRILLING AT 1400'. | | FALCON RIG #19 DRILLING AT 1400'. | ||
SITE, PIT, E&S, AND ACCESS OK. | SITE, PIT, E&S, AND ACCESS OK. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 208: | Line 240: | ||
| FALCON RIG #19 RUNNING 4.5" CASING AND WILL CEMENT LATER IN THE DAY. | | FALCON RIG #19 RUNNING 4.5" CASING AND WILL CEMENT LATER IN THE DAY. | ||
SITE, PIT, E&S, AND ACCESS OK. | SITE, PIT, E&S, AND ACCESS OK. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 215: | Line 249: | ||
| No Violations Noted | | No Violations Noted | ||
| DRILLING COMPLETE AND 4.5" IS CEMENTED. | | DRILLING COMPLETE AND 4.5" IS CEMENTED. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 222: | Line 258: | ||
| No Violations Noted | | No Violations Noted | ||
| On January 28th, 2011 I visited this site as a routine inspection. Drilling was completed. The rig had moved offsite. The access road appeared to be in good condition. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and water trucks were removing water from the pit. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | | On January 28th, 2011 I visited this site as a routine inspection. Drilling was completed. The rig had moved offsite. The access road appeared to be in good condition. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and water trucks were removing water from the pit. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 229: | Line 267: | ||
| No Violations Noted | | No Violations Noted | ||
| On February 3rd, 2011 I visited this site as a routine inspection. Drilling and frac were completed. The access road was becoming soft with the thaw. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and was empty. E&S controls in the lowere corner needed maintenance again. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | | On February 3rd, 2011 I visited this site as a routine inspection. Drilling and frac were completed. The access road was becoming soft with the thaw. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and was empty. E&S controls in the lowere corner needed maintenance again. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 236: | Line 276: | ||
| No Violations Noted | | No Violations Noted | ||
| On February 9th, 2011 I visited this site as a routine inspection. Drilling was completed but the well was not yet in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. Equipment was on site restoring the pad. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | | On February 9th, 2011 I visited this site as a routine inspection. Drilling was completed but the well was not yet in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. Equipment was on site restoring the pad. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 243: | Line 285: | ||
| No Violations Noted | | No Violations Noted | ||
| On February 17th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. The site was rough graded. Additional riprap was added to the lower E&S controls. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and 70% vegetative cover is achieved. | | On February 17th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. The site was rough graded. Additional riprap was added to the lower E&S controls. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and 70% vegetative cover is achieved. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 250: | Line 294: | ||
| No Violations Noted | | No Violations Noted | ||
| On July 8th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. The site was restored and well vegetated. A well tag was present. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | | On July 8th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. The site was restored and well vegetated. A well tag was present. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-003-22157 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.212797,"lon":-79.882661,"icon":""}]} |
County: Allegheny | |
Municipality: Forward Township | |
Operator Name: KRIEBEL MINERALS INC | |
Well Pad ID: | |
Farm/Lease Name: CANTONI 003 | |
First Permit Date: 2010-12-13 | |
Last Permit Date: 2010-12-13 | |
Spud Date: 2011-01-12 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ORND | |
Violations: 0 | |
Latitude: 40.212797 | |
Longitude: -79.882661 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 8071.0 | 303.0 | 0.0 | 0.0 | 75.0 | 365.0 |
2012-0 | 6969.0 | 335.0 | 0.0 | 0.0 | 75.0 | 335.0 |
2013-0 | 5222.0 | 334.0 | 0.0 | 0.0 | 55.0 | 334.0 |
2014-0 | 3778.0 | 332.0 | 0.0 | 0.0 | 40.0 | 332.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-0 | DRILLING FLUID WASTE | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
2011-0 | FRACING FLUID WASTE | 270.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
2011-0 | FRACING FLUID WASTE | 310.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 10.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 20.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
2014-0 | PRODUCED FLUID | 22.0 | Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1947949 | 2011-01-12 | No Violations Noted | On January 12th, 2010 I visited this site as a routine inspection. Drilling had not yet started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad. | |||
1952924 | 2011-01-14 | No Violations Noted | On January 14th, 2011 I visited this site as a routine inspection. Drilling had started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad. | |||
1953011 | 2011-01-20 | No Violations Noted | On January 20th, 2011 I visited this site as a routine inspection. Drilling was taking place. The access road was beginning to need maintenance. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |||
1953937 | 2011-01-12 | No Violations Noted | SITE IS BUILT. PIT IS NOT LINED. NO RIG. | |||
1954053 | 2011-01-20 | No Violations Noted | FALCON RIG #19 DRILLING AT 1400'.
SITE, PIT, E&S, AND ACCESS OK. |
|||
1955629 | 2011-01-25 | No Violations Noted | FALCON RIG #19 RUNNING 4.5" CASING AND WILL CEMENT LATER IN THE DAY.
SITE, PIT, E&S, AND ACCESS OK. |
|||
1955641 | 2011-02-04 | No Violations Noted | DRILLING COMPLETE AND 4.5" IS CEMENTED. | |||
1957791 | 2011-01-28 | No Violations Noted | On January 28th, 2011 I visited this site as a routine inspection. Drilling was completed. The rig had moved offsite. The access road appeared to be in good condition. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and water trucks were removing water from the pit. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |||
1957859 | 2011-02-03 | No Violations Noted | On February 3rd, 2011 I visited this site as a routine inspection. Drilling and frac were completed. The access road was becoming soft with the thaw. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and was empty. E&S controls in the lowere corner needed maintenance again. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |||
1958402 | 2011-02-09 | No Violations Noted | On February 9th, 2011 I visited this site as a routine inspection. Drilling was completed but the well was not yet in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. Equipment was on site restoring the pad. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |||
1958653 | 2011-02-17 | No Violations Noted | On February 17th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. The site was rough graded. Additional riprap was added to the lower E&S controls. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and 70% vegetative cover is achieved. | |||
1992060 | 2011-07-08 | No Violations Noted | On July 8th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. The site was restored and well vegetated. A well tag was present. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. |
For data sources see[3]