X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31120"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31120
 
| Well ID: 37-005-31120
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.7927, -79.542202 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.792655, -79.542133 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Armstrong County, Pennsylvania|Armstrong]]
 
| County: [[Armstrong County, Pennsylvania|Armstrong]]
Line 9: Line 9:
 
| Municipality: [[North Buffalo Township, Armstrong County, Pennsylvania|North Buffalo Township]]
 
| Municipality: [[North Buffalo Township, Armstrong County, Pennsylvania|North Buffalo Township]]
 
|-
 
|-
| Operator Name: [[MDS ENERGY LTD|MDS ENERGY LTD]]
+
| Operator Name: [[MDS ENERGY DEV LLC]]
 
|-
 
|-
| Well Pad ID: [[146598]]
+
| Well Pad ID: [[146598|146598]]
 +
|-
 +
| Farm/Lease Name: RAYMOND W & SUSAN TARR 1M-A
 
|-
 
|-
 
| First Permit Date: 2013-01-30
 
| First Permit Date: 2013-01-30
Line 17: Line 19:
 
| Last Permit Date: 2013-01-30
 
| Last Permit Date: 2013-01-30
 
|-
 
|-
| Spud Date: None
+
| Spud Date: 2013-03-05
 
|-
 
|-
 
| Unconventional: Yes
 
| Unconventional: Yes
Line 23: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
| Latitude: 40.7927
+
| Latitude: 40.792655
 
|-
 
|-
| Longitude: -79.542202
+
| Longitude: -79.542133
 
|-
 
|-
|}
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | DATE
 
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
 
|}
 
|}
 
== Production Data ==
 
== Production Data ==
Line 47: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-2
 +
| style="text-align:right;" | 28837.0
 +
| style="text-align:right;" | 83.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 31541.0
 +
| style="text-align:right;" | 181.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 22254.0
 +
| style="text-align:right;" | 162.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 3230.6
 +
| style="text-align:right;" | 28.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-01
 +
| style="text-align:right;" | 3824.9
 +
| style="text-align:right;" | 24.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 3330.0
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 59: Line 124:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 +
|-
 +
| 2013-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 75.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW006
 +
| CAES WATER TRMT & RECYCLING FAC
 +
| CLARION
 +
| PA
 +
|-
 +
|-
 +
| 2013-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 75.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW006
 +
| CAES WATER TRMT & RECYCLING FAC
 +
| CLARION
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 220.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW006
 +
| CAES WATER TRMT & RECYCLING FAC
 +
| CLARION
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 2.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW006
 +
| CAES WATER TRMT & RECYCLING FAC
 +
| CLARION
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 192.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 155-23223
 +
| NATALE #2 (SWIW #29)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 15-Jan
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 116.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 +
|
 +
| PA
 +
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 2148488
 +
| 2013-02-27
 +
| No Violations Noted
 +
| Site was prepared for construction. All perimeter E&S controls appeared to be adequate and installed according to the on-site E&S plan.
  
 +
This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32  - 3258 a. 1.
 +
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2149817
 +
| 2013-03-18
 +
| No Violations Noted
 +
| Well spud in.  Pit lined and freeboard maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2161283
 +
| 2013-04-24
 +
| No Violations Noted
 +
| Drilling  was not ongoing at the time of the inspection.  Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2182309
 +
| 2013-07-01
 +
| No Violations Noted
 +
| Well logging being completed at time of inspection.  Preparing to run 4 1/2ï¾” production casing.  Discussed 7ï¾” intermediate casing perf and squeeze job w/Operator rep S. Baker.  Operator rep stated that returns to surface were achieved.  Will submit successful pressure test results.  Referred ongoing excavation at site at time of inspection to WQS G. Higgins.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2196982
 +
| 2013-08-19
 +
| No Violations Noted
 +
| Well appeared to be equipped for production.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  There was minor erosion observed on the fill slopes.  The Department recommends that the operator complete site restoration activities as soon as possible to take advantage of the remainder of the 2013 growing season.  Brine tanks located onsite and they appeared to be in sound condition.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2211100
 +
| 2013-10-07
 +
| No Violations Noted
 +
| Id sign in place. Drilling complete and well equipped for production. 2 tanks onsite. No open pits. Vegetation started.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2236060
 +
| 2014-01-14
 +
| No Violations Noted
 +
| Well appeared to be equipped for production.  Brine tanks located onsite and they appeared to be in sound condition.  Site had been effectively restored and the vegetative cover met the 70% uniform coverage criteria.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 +
|
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Inspection Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 06:09, 26 June 2015

Well Details

Well ID: 37-005-31120
Loading map...
County: Armstrong
Municipality: North Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 146598
Farm/Lease Name: RAYMOND W & SUSAN TARR 1M-A
First Permit Date: 2013-01-30
Last Permit Date: 2013-01-30
Spud Date: 2013-03-05
Unconventional: Yes
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.792655
Longitude: -79.542133

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 28837.0 83.0 0.0 0.0 0.0 0.0
2014-1 31541.0 181.0 0.0 0.0 0.0 0.0
2014-2 22254.0 162.0 0.0 0.0 0.0 0.0
2015-02 3230.6 28.0 0.0 0.0 0.0 0.0
2015-01 3824.9 24.0 0.0 0.0 0.0 0.0
2015-03 3330.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-1 DRILLING FLUID WASTE 75.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW006 CAES WATER TRMT & RECYCLING FAC CLARION PA
2013-1 FRACING FLUID WASTE 75.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW006 CAES WATER TRMT & RECYCLING FAC CLARION PA
2013-2 DRILLING FLUID WASTE 220.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006 CAES WATER TRMT & RECYCLING FAC CLARION PA
2013-2 FRACING FLUID WASTE 2.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006 CAES WATER TRMT & RECYCLING FAC CLARION PA
2013-2 PRODUCED FLUID 192.0 Bbl INJECTION DISPOSAL WELL 155-23223 NATALE #2 (SWIW #29) VIENNA OH
15-Jan PRODUCED FLUID 116.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005 RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2148488 2013-02-27 No Violations Noted Site was prepared for construction. All perimeter E&S controls appeared to be adequate and installed according to the on-site E&S plan.

This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 - 3258 a. 1.

2149817 2013-03-18 No Violations Noted Well spud in. Pit lined and freeboard maintained.
2161283 2013-04-24 No Violations Noted Drilling was not ongoing at the time of the inspection. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road.
2182309 2013-07-01 No Violations Noted Well logging being completed at time of inspection. Preparing to run 4 1/2ï¾” production casing. Discussed 7ï¾” intermediate casing perf and squeeze job w/Operator rep S. Baker. Operator rep stated that returns to surface were achieved. Will submit successful pressure test results. Referred ongoing excavation at site at time of inspection to WQS G. Higgins.
2196982 2013-08-19 No Violations Noted Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. There was minor erosion observed on the fill slopes. The Department recommends that the operator complete site restoration activities as soon as possible to take advantage of the remainder of the 2013 growing season. Brine tanks located onsite and they appeared to be in sound condition.
2211100 2013-10-07 No Violations Noted Id sign in place. Drilling complete and well equipped for production. 2 tanks onsite. No open pits. Vegetation started.
2236060 2014-01-14 No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been effectively restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

For data sources see[3]

References