X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28639"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28639
 
| Well ID: 37-129-28639
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.50838, -79.559211 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.50838, -79.559211 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
Line 9: Line 9:
 
| Municipality: [[Washington Township, Westmoreland County, Pennsylvania|Washington Township]]
 
| Municipality: [[Washington Township, Westmoreland County, Pennsylvania|Washington Township]]
 
|-
 
|-
| Operator Name: [[CNX GAS CO LLC|CNX GAS CO LLC]]
+
| Operator Name: [[CNX GAS CO LLC]]
 
|-
 
|-
| Well Pad ID: [[148391]]
+
| Well Pad ID: [[148391|148391]]
 
|-
 
|-
 
| Farm/Lease Name: GAUT 4B
 
| Farm/Lease Name: GAUT 4B
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.50838
 
| Latitude: 40.50838
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | GAS QUANTITY
 +
!scope="col" | GAS PRODUCTION DAYS
 +
!scope="col" | CONDENSATE QUANTITY
 +
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-2
 +
| style="text-align:right;" | 619685.0
 +
| style="text-align:right;" | 175.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 358111.0
 +
| style="text-align:right;" | 181.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-2
 +
| style="text-align:right;" | 266623.06
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 255815.89
 +
| style="text-align:right;" | 181.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 177635.56
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 20995.41
 +
| style="text-align:right;" | 28.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-01
 +
| style="text-align:right;" | 20011.29
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 25279.79
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | TYPE
 +
!scope="col" | QUANTITY
 +
!scope="col" | UNITS
 +
!scope="col" | DISPOSAL METHOD
 +
!scope="col" | WASTE FACILITY PERMIT ID
 +
!scope="col" | WASTE FACILITY NAME
 +
!scope="col" | FACILITY CITY
 +
!scope="col" | FACILITY STATE
 +
|-
 +
| 2011-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 550.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 250050885
 +
| SOIL REMEDIATION INC. (SRI)
 +
| LOWELLVILLE
 +
| OH
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 1.0
 +
| Tons
 +
| LANDFILL
 +
| 100280
 +
| VALLEY LANDFILL
 +
| IRWIN
 +
| PA
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 239.75
 +
| Bbl
 +
| LANDFILL
 +
| 250050885
 +
| SOIL REMEDIATION INC. (SRI)
 +
| LOWELLVILLE
 +
| OH
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 432.85
 +
| Bbl
 +
| LANDFILL
 +
| 100280
 +
| VALLEY LANDFILL
 +
| IRWIN
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 248.38
 +
| Tons
 +
| LANDFILL
 +
| 100434
 +
| EVERGREEN LANDFILL
 +
| BLAIRSVILLE
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 10.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 889.27
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23584
 +
| KOONTZ #1 DISPOSAL WELL
 +
| WARREN
 +
| OH
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 511.14
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-22038
 +
| PAROBEK #2 (SWIW #12)
 +
|
 +
| OH
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 154.75
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-22403
 +
| ANNAROCK D-1
 +
| FOWLER
 +
| OH
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-013-20609
 +
| BUCKEYE UIC BARNESVILLE #1 (SWIW#2)
 +
| BARNESVILLE
 +
| OH
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 205.92
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
| KLEESE #1 (SWIW #18)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 120.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23759
 +
| KLEESE #5 (SWIW #25)
 +
| TRUMBULL
 +
| OH
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 511.78
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23584
 +
| KOONTZ #1 DISPOSAL WELL
 +
| WARREN
 +
| OH
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-167-23862
 +
| NICHOLS #1 (SWIW #13) [HECKMAN WATER RES(CVR)INC]
 +
| BELPRE
 +
| OH
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 517.14
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-22038
 +
| PAROBEK #2 (SWIW #12)
 +
|
 +
| OH
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 28.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 67.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-013-20609
 +
| BUCKEYE UIC BARNESVILLE #1 (SWIW#2)
 +
| BARNESVILLE
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 607.41
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-119-28776
 +
| GOFF #1 (SWIW #27)
 +
| NORWICH
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 100.62
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
| KLEESE #1 (SWIW #18)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 113.49
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23732
 +
| KLEESE #4 (SWIW #24)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 288.9
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23759
 +
| KLEESE #5 (SWIW #25)
 +
| TRUMBULL
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 370.61
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 155-23223
 +
| NATALE #2 (SWIW #29)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 107.64
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-167-23862
 +
| NICHOLS #1 (SWIW #13) [HECKMAN WATER RES(CVR)INC]
 +
| BELPRE
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 38.99
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 16.66
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21893
 +
| WOLF #1 DISP WELL
 +
| NEWTON FALLS
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 16.67
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21894
 +
| WOLF #2 DISPOSAL WELL
 +
| NEWTON FALLS
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 16.67
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23203
 +
| WOLF #4 DISPOSAL WELL
 +
| NEWTON FALLS
 +
| OH
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 99.23
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-013-20609
 +
| BUCKEYE UIC BARNESVILLE #1 (SWIW#2)
 +
| BARNESVILLE
 +
| OH
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 352.17
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
| KLEESE #1 (SWIW #18)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 132.21
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21447
 +
| KLEESE #2 (SWIW #19)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 114.66
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23732
 +
| KLEESE #4 (SWIW #24)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 589.68
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23223
 +
| NATALE #2 (SWIW #29)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 2.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-013-20609
 +
| BUCKEYE UIC BARNESVILLE #1 (SWIW#2)
 +
| BARNESVILLE
 +
| OH
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 28.08
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-119-28776
 +
| GOFF #1 (SWIW #27)
 +
| NORWICH
 +
| OH
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 41: Line 583:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 2004647
 
| 2004647
Line 46: Line 590:
 
| No Violations Noted
 
| No Violations Noted
 
| Cementing 13 3/8" casing at time of inspection.  Closed loop system being utilized.  Pit lined and freeboard maintained.
 
| Cementing 13 3/8" casing at time of inspection.  Closed loop system being utilized.  Pit lined and freeboard maintained.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 53: Line 599:
 
| No Violations Noted
 
| No Violations Noted
 
| Waiting on rig to commence lateral drilling.  Pit lined and freeboard maintained.  Inspection conducted w/OGI S. Banks.
 
| Waiting on rig to commence lateral drilling.  Pit lined and freeboard maintained.  Inspection conducted w/OGI S. Banks.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 60: Line 608:
 
| No Violations Noted
 
| No Violations Noted
 
| Waiting on rig to commence lateral drilling.  Pit lined and freeboard maintained.  Inspection conducted w/OGI S. Banks.
 
| Waiting on rig to commence lateral drilling.  Pit lined and freeboard maintained.  Inspection conducted w/OGI S. Banks.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 67: Line 617:
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling was not ongoing at the time of the inspection.  A small pit had been constructed onsite and it appeared to contain drill fluids.  The pit was properly lined and it had more than the required two feet of lined freeboard.  All E&S controls had been installed as outlined in the E&S plan.  The disturbed area had been temporarily stabilized.  There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
 
| Drilling was not ongoing at the time of the inspection.  A small pit had been constructed onsite and it appeared to contain drill fluids.  The pit was properly lined and it had more than the required two feet of lined freeboard.  All E&S controls had been installed as outlined in the E&S plan.  The disturbed area had been temporarily stabilized.  There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 74: Line 626:
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection in response to a spill on Friday March 30 at approximately 1:30 pm EST.  The operator notified the Department within the ICP protocol and the Department was informed at the time of the call that the spill was on containment. While disassembling the rig the spill originated from a pipe between mud pits and a shaker skid.  At the time of the spill a CPX Environmental truck was onsite and was immediately ordered by the operator to clean up the spill.
 
| Inspection in response to a spill on Friday March 30 at approximately 1:30 pm EST.  The operator notified the Department within the ICP protocol and the Department was informed at the time of the call that the spill was on containment. While disassembling the rig the spill originated from a pipe between mud pits and a shaker skid.  At the time of the spill a CPX Environmental truck was onsite and was immediately ordered by the operator to clean up the spill.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 81: Line 635:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the well was drilled and in the beginning phases of stimulation.  No accelerated erosion and sedimentation observed in relation to the well pad area or access road.  The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
 
| At the time of inspection the well was drilled and in the beginning phases of stimulation.  No accelerated erosion and sedimentation observed in relation to the well pad area or access road.  The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 88: Line 644:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the well was drilled and stimulated and being actively equipped for production.  No accelerated erosion and sedimentation observed in relation to the well pad area or access road.  The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
 
| At the time of inspection the well was drilled and stimulated and being actively equipped for production.  No accelerated erosion and sedimentation observed in relation to the well pad area or access road.  The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 95: Line 653:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the well appeared to be drilled and the Operator was actively working to equip the well for production.  The well apparatus, brine tanks and heating units appear to be in sounds working condition.    At the time of inspection the Erosion and Sedimentation plan was onsite and appeared to be implemented.  All BMPs were installed and functionally properly.  The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
| At the time of inspection the well appeared to be drilled and the Operator was actively working to equip the well for production.  The well apparatus, brine tanks and heating units appear to be in sounds working condition.    At the time of inspection the Erosion and Sedimentation plan was onsite and appeared to be implemented.  All BMPs were installed and functionally properly.  The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 102: Line 662:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the drill rig was onsite and on containment. During the inspection the Operator indicated that the 4G was the well actively being drilled, at this time the 4B well was drilled and equipped for production.  The associated well apparatus and brine tanks located appear to be in sound condition.  During the inspection the Department walked the perimeter and inspected the associated spring and seeps down gradient from the well pad area, no observation of contaminate at the time of inspection.  The Erosion and Sedimentation plan was onsite and appeared to be implemented.  All BMPs were installed and functionally properly.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
| At the time of inspection the drill rig was onsite and on containment. During the inspection the Operator indicated that the 4G was the well actively being drilled, at this time the 4B well was drilled and equipped for production.  The associated well apparatus and brine tanks located appear to be in sound condition.  During the inspection the Department walked the perimeter and inspected the associated spring and seeps down gradient from the well pad area, no observation of contaminate at the time of inspection.  The Erosion and Sedimentation plan was onsite and appeared to be implemented.  All BMPs were installed and functionally properly.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 112: Line 674:
 
Well site on pad where additional wells being drilled.
 
Well site on pad where additional wells being drilled.
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 119: Line 683:
 
| No Violations Noted
 
| No Violations Noted
 
| no violations noted
 
| no violations noted
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 129: Line 695:
 
Well site on pad where additional wells being drilled.
 
Well site on pad where additional wells being drilled.
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 136: Line 704:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the well appears to be drilled and equipped for production.  The associated well apparatus, brine tanks, and production heaters appear to be in sound condition.  The Erosion and Sedimentation plan was onsite and appeared to be implemented.  All BMPs were installed and functionally properly.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
| At the time of inspection the well appears to be drilled and equipped for production.  The associated well apparatus, brine tanks, and production heaters appear to be in sound condition.  The Erosion and Sedimentation plan was onsite and appeared to be implemented.  All BMPs were installed and functionally properly.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2232488
| style="text-align:right;" | 619685.0
+
| 2013-12-30
| style="text-align:right;" | 175.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| At the time of inspection the well appears to be plugged while the Operator prepares the site to drill additional wells. The Erosion and Sedimentation plan was onsite and appeared to be implemented.  All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2244027
| style="text-align:right;" | 0.0
+
| 2014-02-10
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2250122
| style="text-align:right;" | 0.0
+
| 2014-02-25
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well operating and properly identified.
| style="text-align:right;" | 0.0
+
Well equipped with production unit and produced fluids tanks.
| style="text-align:right;" | 0.0
+
Well on site where additional wells, three (3), waiting on frac.
| style="text-align:right;" | 0.0
+
 
|-
+
 
|}
+
|  
== Waste Data ==
+
|  
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 889.27
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23584
 
| KOONTZ #1 DISPOSAL WELL
 
| WARREN
 
| OH
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 511.14
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-22038
 
| PAROBEK #2 (SWIW #12)
 
 
|  
 
|  
| OH
 
 
|-
 
|-
 
|-
 
|-
| 2012-2
+
| 2363135
| FRACING FLUID WASTE
+
| 2015-04-21
| style="text-align:right;" | 10010.0
+
| No Violations Noted
| Bbl
+
| At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
 
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 
|-
 
|-
| 2012-2
+
| 2368805
| PRODUCED FLUID
+
| 2015-05-11
| style="text-align:right;" | 154.75
+
| No Violations Noted
| Bbl
+
| Well operating and properly identified. Well equipped with production unit (separation
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
 
 
|  
 
|  
 
|  
 
|  
|-
 
|-
 
| 2012-2
 
| DRILL CUTTINGS
 
| style="text-align:right;" | 248.38
 
| Tons
 
| LANDFILL
 
| 100434
 
| WASTE MANAGEMENT, INC - EVERGREEN LANDFILL
 
| BLAIRSVILLE
 
| PA
 
|-
 
|-
 
| 2011-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 550.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 0250050885
 
| SOIL REMEDIATION INC. (SRI)
 
| LOWELLVILLE
 
| OH
 
|-
 
|-
 
| 2012-1
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 239.75
 
| Bbl
 
| LANDFILL
 
| 0250050885
 
| SOIL REMEDIATION INC. (SRI)
 
| LOWELLVILLE
 
| OH
 
|-
 
|-
 
| 2012-1
 
| DRILL CUTTINGS
 
| style="text-align:right;" | 1089.5
 
| Tons
 
| LANDFILL
 
| 100280
 
| USA VALLEY FACILITY, INC
 
| IRWIN
 
| PA
 
|-
 
|-
 
| 2012-1
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 432.85
 
| Bbl
 
| LANDFILL
 
| 100280
 
| USA VALLEY FACILITY, INC
 
| IRWIN
 
| PA
 
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 08:01, 26 June 2015

Well Details

Well ID: 37-129-28639
Loading map...
County: Westmoreland
Municipality: Washington Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 148391
Farm/Lease Name: GAUT 4B
First Permit Date: 2011-07-05
Last Permit Date: 2011-10-04
Spud Date: 2011-08-09
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.50838
Longitude: -79.559211

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 619685.0 175.0 0.0 0.0 0.0 0.0
2013-1 358111.0 181.0 0.0 0.0 0.0 0.0
2013-2 266623.06 184.0 0.0 0.0 0.0 0.0
2014-1 255815.89 181.0 0.0 0.0 0.0 0.0
2014-2 177635.56 184.0 0.0 0.0 0.0 0.0
2015-02 20995.41 28.0 0.0 0.0 0.0 0.0
2015-01 20011.29 31.0 0.0 0.0 0.0 0.0
2015-03 25279.79 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-2 PRODUCED FLUID 550.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 250050885 SOIL REMEDIATION INC. (SRI) LOWELLVILLE OH
2012-1 DRILL CUTTINGS 1.0 Tons LANDFILL 100280 VALLEY LANDFILL IRWIN PA
2012-1 DRILLING FLUID WASTE 239.75 Bbl LANDFILL 250050885 SOIL REMEDIATION INC. (SRI) LOWELLVILLE OH
2012-1 DRILLING FLUID WASTE 432.85 Bbl LANDFILL 100280 VALLEY LANDFILL IRWIN PA
2012-2 DRILL CUTTINGS 248.38 Tons LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2012-2 FRACING FLUID WASTE 10.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 889.27 Bbl INJECTION DISPOSAL WELL 34-155-23584 KOONTZ #1 DISPOSAL WELL WARREN OH
2012-2 PRODUCED FLUID 511.14 Bbl INJECTION DISPOSAL WELL 34-007-22038 PAROBEK #2 (SWIW #12) OH
2012-2 PRODUCED FLUID 154.75 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-1 PRODUCED FLUID 1.0 Bbl INJECTION DISPOSAL WELL 34-155-22403 ANNAROCK D-1 FOWLER OH
2013-1 PRODUCED FLUID 1.0 Bbl INJECTION DISPOSAL WELL 34-013-20609 BUCKEYE UIC BARNESVILLE #1 (SWIW#2) BARNESVILLE OH
2013-1 PRODUCED FLUID 205.92 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) VIENNA OH
2013-1 PRODUCED FLUID 120.0 Bbl INJECTION DISPOSAL WELL 34-155-23759 KLEESE #5 (SWIW #25) TRUMBULL OH
2013-1 PRODUCED FLUID 511.78 Bbl INJECTION DISPOSAL WELL 34-155-23584 KOONTZ #1 DISPOSAL WELL WARREN OH
2013-1 PRODUCED FLUID 1.0 Bbl INJECTION DISPOSAL WELL 34-167-23862 NICHOLS #1 (SWIW #13) [HECKMAN WATER RES(CVR)INC] BELPRE OH
2013-1 PRODUCED FLUID 517.14 Bbl INJECTION DISPOSAL WELL 34-007-22038 PAROBEK #2 (SWIW #12) OH
2013-1 PRODUCED FLUID 28.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-2 FRACING FLUID WASTE 67.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 1.0 Bbl INJECTION DISPOSAL WELL 34-013-20609 BUCKEYE UIC BARNESVILLE #1 (SWIW#2) BARNESVILLE OH
2013-2 PRODUCED FLUID 607.41 Bbl INJECTION DISPOSAL WELL 34-119-28776 GOFF #1 (SWIW #27) NORWICH OH
2013-2 PRODUCED FLUID 100.62 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) VIENNA OH
2013-2 PRODUCED FLUID 113.49 Bbl INJECTION DISPOSAL WELL 34-155-23732 KLEESE #4 (SWIW #24) VIENNA OH
2013-2 PRODUCED FLUID 288.9 Bbl INJECTION DISPOSAL WELL 34-155-23759 KLEESE #5 (SWIW #25) TRUMBULL OH
2013-2 PRODUCED FLUID 370.61 Bbl INJECTION DISPOSAL WELL 155-23223 NATALE #2 (SWIW #29) VIENNA OH
2013-2 PRODUCED FLUID 107.64 Bbl INJECTION DISPOSAL WELL 34-167-23862 NICHOLS #1 (SWIW #13) [HECKMAN WATER RES(CVR)INC] BELPRE OH
2013-2 PRODUCED FLUID 38.99 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 16.66 Bbl INJECTION DISPOSAL WELL 34-155-21893 WOLF #1 DISP WELL NEWTON FALLS OH
2013-2 PRODUCED FLUID 16.67 Bbl INJECTION DISPOSAL WELL 34-155-21894 WOLF #2 DISPOSAL WELL NEWTON FALLS OH
2013-2 PRODUCED FLUID 16.67 Bbl INJECTION DISPOSAL WELL 34-155-23203 WOLF #4 DISPOSAL WELL NEWTON FALLS OH
2014-1 PRODUCED FLUID 99.23 Bbl INJECTION DISPOSAL WELL 34-013-20609 BUCKEYE UIC BARNESVILLE #1 (SWIW#2) BARNESVILLE OH
2014-1 PRODUCED FLUID 352.17 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) VIENNA OH
2014-1 PRODUCED FLUID 132.21 Bbl INJECTION DISPOSAL WELL 34-155-21447 KLEESE #2 (SWIW #19) VIENNA OH
2014-1 PRODUCED FLUID 114.66 Bbl INJECTION DISPOSAL WELL 34-155-23732 KLEESE #4 (SWIW #24) VIENNA OH
2014-1 PRODUCED FLUID 589.68 Bbl INJECTION DISPOSAL WELL 34-155-23223 NATALE #2 (SWIW #29) VIENNA OH
2014-1 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 1.0 Bbl INJECTION DISPOSAL WELL 34-013-20609 BUCKEYE UIC BARNESVILLE #1 (SWIW#2) BARNESVILLE OH
2014-2 PRODUCED FLUID 28.08 Bbl INJECTION DISPOSAL WELL 34-119-28776 GOFF #1 (SWIW #27) NORWICH OH
2014-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2004647 2011-09-19 No Violations Noted Cementing 13 3/8" casing at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained.
2010299 2011-10-07 No Violations Noted Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI S. Banks.
2013348 2011-10-20 No Violations Noted Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI S. Banks.
2014628 2011-10-28 No Violations Noted Drilling was not ongoing at the time of the inspection. A small pit had been constructed onsite and it appeared to contain drill fluids. The pit was properly lined and it had more than the required two feet of lined freeboard. All E&S controls had been installed as outlined in the E&S plan. The disturbed area had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
2055814 2012-04-02 No Violations Noted Inspection in response to a spill on Friday March 30 at approximately 1:30 pm EST. The operator notified the Department within the ICP protocol and the Department was informed at the time of the call that the spill was on containment. While disassembling the rig the spill originated from a pipe between mud pits and a shaker skid. At the time of the spill a CPX Environmental truck was onsite and was immediately ordered by the operator to clean up the spill.
2076916 2012-06-18 No Violations Noted At the time of inspection the well was drilled and in the beginning phases of stimulation. No accelerated erosion and sedimentation observed in relation to the well pad area or access road. The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
2092866 2012-08-20 No Violations Noted At the time of inspection the well was drilled and stimulated and being actively equipped for production. No accelerated erosion and sedimentation observed in relation to the well pad area or access road. The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
2101728 2012-09-20 No Violations Noted At the time of inspection the well appeared to be drilled and the Operator was actively working to equip the well for production. The well apparatus, brine tanks and heating units appear to be in sounds working condition. At the time of inspection the Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2108700 2012-10-17 No Violations Noted At the time of inspection the drill rig was onsite and on containment. During the inspection the Operator indicated that the 4G was the well actively being drilled, at this time the 4B well was drilled and equipped for production. The associated well apparatus and brine tanks located appear to be in sound condition. During the inspection the Department walked the perimeter and inspected the associated spring and seeps down gradient from the well pad area, no observation of contaminate at the time of inspection. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2110424 2012-10-16 No Violations Noted Well operating and properly identified.

Well equipped with production unit and produced fluids tanks. Well site on pad where additional wells being drilled.

2115661 2012-11-14 No Violations Noted no violations noted
2116152 2012-11-13 No Violations Noted Well operating and properly identified.

Well equipped with production unit and produced fluids tanks. Well site on pad where additional wells being drilled.

2127479 2013-01-03 No Violations Noted At the time of inspection the well appears to be drilled and equipped for production. The associated well apparatus, brine tanks, and production heaters appear to be in sound condition. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2232488 2013-12-30 No Violations Noted At the time of inspection the well appears to be plugged while the Operator prepares the site to drill additional wells. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2244027 2014-02-10 No Violations Noted At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2250122 2014-02-25 No Violations Noted Well operating and properly identified.

Well equipped with production unit and produced fluids tanks. Well on site where additional wells, three (3), waiting on frac.


2363135 2015-04-21 No Violations Noted At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2368805 2015-05-11 No Violations Noted Well operating and properly identified. Well equipped with production unit (separation

For data sources see[3]

References