If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-129-28794 | | Well ID: 37-129-28794 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.4748, -79.569313 | width=100% | height=100% }} |
|- | |- | ||
| County: [[Westmoreland County, Pennsylvania|Westmoreland]] | | County: [[Westmoreland County, Pennsylvania|Westmoreland]] | ||
Line 9: | Line 9: | ||
| Municipality: [[Washington Township, Westmoreland County, Pennsylvania|Washington Township]] | | Municipality: [[Washington Township, Westmoreland County, Pennsylvania|Washington Township]] | ||
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[CNX GAS CO LLC]] |
|- | |- | ||
− | | Well Pad ID: [[148819]] | + | | Well Pad ID: [[148819|148819]] |
+ | |- | ||
+ | | Farm/Lease Name: MAMONT SOUTH 1B | ||
|- | |- | ||
| First Permit Date: 2012-07-05 | | First Permit Date: 2012-07-05 | ||
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: 2013-07-26 |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: 2013-06-10 |
|- | |- | ||
| Unconventional: Yes | | Unconventional: Yes | ||
Line 23: | Line 25: | ||
| Horizontal: Yes | | Horizontal: Yes | ||
|- | |- | ||
− | | Violations: | + | | Well Status: ACTIVE |
+ | |- | ||
+ | | Violations: 0 | ||
|- | |- | ||
| Latitude: 40.4748 | | Latitude: 40.4748 | ||
Line 30: | Line 34: | ||
|- | |- | ||
|} | |} | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | GAS QUANTITY | ||
+ | !scope="col" | GAS PRODUCTION DAYS | ||
+ | !scope="col" | CONDENSATE QUANTITY | ||
+ | !scope="col" | CONDENSATE PRODUCTION DAYS | ||
+ | !scope="col" | OIL QUANTITY | ||
+ | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2013-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 299554.76 | ||
+ | | style="text-align:right;" | 41.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 681106.07 | ||
+ | | style="text-align:right;" | 184.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-02 | ||
+ | | style="text-align:right;" | 67575.02 | ||
+ | | style="text-align:right;" | 28.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-01 | ||
+ | | style="text-align:right;" | 79121.09 | ||
+ | | style="text-align:right;" | 31.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-03 | ||
+ | | style="text-align:right;" | 73395.12 | ||
+ | | style="text-align:right;" | 31.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | TYPE | ||
+ | !scope="col" | QUANTITY | ||
+ | !scope="col" | UNITS | ||
+ | !scope="col" | DISPOSAL METHOD | ||
+ | !scope="col" | WASTE FACILITY PERMIT ID | ||
+ | !scope="col" | WASTE FACILITY NAME | ||
+ | !scope="col" | FACILITY CITY | ||
+ | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 546.46 | ||
+ | | Tons | ||
+ | | RESIDUAL WASTE TRANSFER FACILITY | ||
+ | | PAD004835146 | ||
+ | | MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY | ||
+ | | YUKON | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 164.52 | ||
+ | | Bbl | ||
+ | | RESIDUAL WASTE TRANSFER FACILITY | ||
+ | | PAD004835146 | ||
+ | | MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY | ||
+ | | YUKON | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 45.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 0.27 | ||
+ | | Bbl | ||
+ | | LANDFILL | ||
+ | | 100434 | ||
+ | | EVERGREEN LANDFILL | ||
+ | | BLAIRSVILLE | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 21.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 7.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 32.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 37: | Line 215: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 2132720 | | 2132720 | ||
Line 42: | Line 222: | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection the Operator was in the process of cutting and removing trees and underbrush. The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | | At the time of inspection the Operator was in the process of cutting and removing trees and underbrush. The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 49: | Line 231: | ||
| No Violations Noted | | No Violations Noted | ||
| no violation noted | | no violation noted | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2152934 | ||
+ | | 2013-04-02 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2163797 | ||
+ | | 2013-05-06 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2174949 | ||
+ | | 2013-06-13 | ||
+ | | In Compliance with Policy | ||
+ | | Inspection the result of the Operator reporting a breached BMP during a precipitation event. The Operator is in compliance with the Departments notification policy for a BMP breach. During the inspection the Department notes that an infiltration ditch located closest to the access road failed during a heavy precipitation event in the early morning hours on 6/13/2013. The failure resulted in material from the infiltration ditch being washed into a 32" silt sox, which did not contain the material and also failed. The two failures resulted is accelerated erosion of the access road and scouring of a hillside below the excavated pad area. The precipitation event appears to exceed the Departments criteria for construction standards. The Operators response was to rebuild the failed portion of the infiltration ditch, add an additional rock outlet and repair the silt sox. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2175881 | ||
+ | | 2013-06-13 | ||
+ | | No Violations Noted | ||
+ | | Well not spud in at time of inspection. Inspection conducted w/OGI J. Branan. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2177609 | ||
+ | | 2013-05-24 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the drill rig was located onsite and placed on containment. The Department notes that the Operator replaced the silt sox, installed an additional rock outlet, and repaired the failed earthen dike surrounding the well site. The Department has also notes that the additions have been added to the E&S plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2182012 | ||
+ | | 2013-07-05 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the drill rig was located onsite and placed on containment. No observation of accelerated erosion or sedimentation in relation to the access road or well site. The E&S plan was on site and all associated BMPs appear to be installed as outlined on the plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2182472 | ||
+ | | 2013-07-09 | ||
+ | | No Violations Noted | ||
+ | | Waiting on cement at time of inspection. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2185972 | ||
+ | | 2013-07-24 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2189850 | ||
+ | | 2013-08-01 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2189853 | ||
+ | | 2013-08-06 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection #2189814 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2195023 | ||
+ | | 2013-08-07 | ||
+ | | No Violations Noted | ||
+ | | Waiting on rig to commence lateral drilling. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2209073 | ||
+ | | 2013-10-02 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2216385 | ||
+ | | 2013-10-25 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2217795 | ||
+ | | 2013-10-23 | ||
+ | | No Violations Noted | ||
+ | | Waiting on rig to commence lateral drilling. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2222905 | ||
+ | | 2013-11-14 | ||
+ | | No Violations Noted | ||
+ | | Waiting on rig to commence lateral drilling. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2226509 | ||
+ | | 2013-11-26 | ||
+ | | No Violations Noted | ||
+ | | Preparing to move Nabors rig# M62 to commence lateral drilling. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2243095 | ||
+ | | 2014-02-06 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the Operator was actively preparing the site for stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2249709 | ||
+ | | 2014-02-18 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the Operator was actively stimulating the wells located onsite. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2249710 | ||
+ | | 2014-03-03 | ||
+ | | No Violations Noted | ||
+ | | See inspection # 2249702 for events and description from the 3/3/2014 inspection. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2253170 | ||
+ | | 2014-03-13 | ||
+ | | Pending | ||
+ | | Incident inspection the result of a 2 gallon motor oil spill reported by the Operator on 3/12/2014. The Operator is in compliance with the spill policy. During an onsite inspection the Operator indicated the spill occurred during a maintenance break. The Operator indicated that a mechanic spilled the motor oil while preforming routine maintenance on an engine located on top of containment. The continent was full of precipitation and the motor oil was suspended on the water, which results in a portion of the oil reaching a portion of the pad. The Operator immediately added spill booms and vacuumed the affected area. At the time of inspection the Department did not visually observe any threat to the environment associated with this spill. The Department suggest the operator take confirmatory samples and background samples to ensure the spill was properly remediated. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2360463 | ||
+ | | 2015-04-13 | ||
+ | | No Violations Noted | ||
+ | | Inspection in response to a Well Site Restoration Report file by the Operator on 11-24-2014. At the time of inspection all earth disturbance activities | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2361178 | ||
+ | | 2015-04-08 | ||
+ | | No Violations Noted | ||
+ | | Well operating and properly identified. Well equipped with production unit (separation | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | { | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2015-05-26 | |
− | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | |
− | + | | accessdate = 2015-05-27 }}</ref> | |
− | + | == References == | |
− | + | {{reflist}} | |
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | ==References== | ||
− | {{ | ||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-129-28794 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4748,"lon":-79.569313,"icon":""}]} |
County: Westmoreland | |
Municipality: Washington Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 148819 | |
Farm/Lease Name: MAMONT SOUTH 1B | |
First Permit Date: 2012-07-05 | |
Last Permit Date: 2013-07-26 | |
Spud Date: 2013-06-10 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 40.4748 | |
Longitude: -79.569313 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 299554.76 | 41.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 681106.07 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 67575.02 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 79121.09 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 73395.12 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2013-2 | DRILL CUTTINGS | 546.46 | Tons | RESIDUAL WASTE TRANSFER FACILITY | PAD004835146 | MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY | YUKON | PA |
2013-2 | DRILLING FLUID WASTE | 164.52 | Bbl | RESIDUAL WASTE TRANSFER FACILITY | PAD004835146 | MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY | YUKON | PA |
2013-2 | FRACING FLUID WASTE | 45.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | FRACING FLUID WASTE | 0.27 | Bbl | LANDFILL | 100434 | EVERGREEN LANDFILL | BLAIRSVILLE | PA |
2014-1 | FRACING FLUID WASTE | 21.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | PRODUCED FLUID | 7.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 32.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2132720 | 2013-01-22 | No Violations Noted | At the time of inspection the Operator was in the process of cutting and removing trees and underbrush. The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | |||
2139197 | 2013-02-13 | No Violations Noted | no violation noted | |||
2152934 | 2013-04-02 | No Violations Noted | At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | |||
2163797 | 2013-05-06 | No Violations Noted | At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | |||
2174949 | 2013-06-13 | In Compliance with Policy | Inspection the result of the Operator reporting a breached BMP during a precipitation event. The Operator is in compliance with the Departments notification policy for a BMP breach. During the inspection the Department notes that an infiltration ditch located closest to the access road failed during a heavy precipitation event in the early morning hours on 6/13/2013. The failure resulted in material from the infiltration ditch being washed into a 32" silt sox, which did not contain the material and also failed. The two failures resulted is accelerated erosion of the access road and scouring of a hillside below the excavated pad area. The precipitation event appears to exceed the Departments criteria for construction standards. The Operators response was to rebuild the failed portion of the infiltration ditch, add an additional rock outlet and repair the silt sox. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2175881 | 2013-06-13 | No Violations Noted | Well not spud in at time of inspection. Inspection conducted w/OGI J. Branan. | |||
2177609 | 2013-05-24 | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. The Department notes that the Operator replaced the silt sox, installed an additional rock outlet, and repaired the failed earthen dike surrounding the well site. The Department has also notes that the additions have been added to the E&S plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2182012 | 2013-07-05 | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. No observation of accelerated erosion or sedimentation in relation to the access road or well site. The E&S plan was on site and all associated BMPs appear to be installed as outlined on the plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2182472 | 2013-07-09 | No Violations Noted | Waiting on cement at time of inspection. | |||
2185972 | 2013-07-24 | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2189850 | 2013-08-01 | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2189853 | 2013-08-06 | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection #2189814 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2195023 | 2013-08-07 | No Violations Noted | Waiting on rig to commence lateral drilling. | |||
2209073 | 2013-10-02 | No Violations Noted | At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2216385 | 2013-10-25 | No Violations Noted | At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2217795 | 2013-10-23 | No Violations Noted | Waiting on rig to commence lateral drilling. | |||
2222905 | 2013-11-14 | No Violations Noted | Waiting on rig to commence lateral drilling. | |||
2226509 | 2013-11-26 | No Violations Noted | Preparing to move Nabors rig# M62 to commence lateral drilling. | |||
2243095 | 2014-02-06 | No Violations Noted | At the time of inspection the Operator was actively preparing the site for stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2249709 | 2014-02-18 | No Violations Noted | At the time of inspection the Operator was actively stimulating the wells located onsite. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | |||
2249710 | 2014-03-03 | No Violations Noted | See inspection # 2249702 for events and description from the 3/3/2014 inspection. | |||
2253170 | 2014-03-13 | Pending | Incident inspection the result of a 2 gallon motor oil spill reported by the Operator on 3/12/2014. The Operator is in compliance with the spill policy. During an onsite inspection the Operator indicated the spill occurred during a maintenance break. The Operator indicated that a mechanic spilled the motor oil while preforming routine maintenance on an engine located on top of containment. The continent was full of precipitation and the motor oil was suspended on the water, which results in a portion of the oil reaching a portion of the pad. The Operator immediately added spill booms and vacuumed the affected area. At the time of inspection the Department did not visually observe any threat to the environment associated with this spill. The Department suggest the operator take confirmatory samples and background samples to ensure the spill was properly remediated. | |||
2360463 | 2015-04-13 | No Violations Noted | Inspection in response to a Well Site Restoration Report file by the Operator on 11-24-2014. At the time of inspection all earth disturbance activities | |||
2361178 | 2015-04-08 | No Violations Noted | Well operating and properly identified. Well equipped with production unit (separation |
For data sources see[3]