If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-005-30127 | | Well ID: 37-005-30127 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.881369, -79.242938 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Armstrong County, Pennsylvania|Armstrong]] | ||
+ | |- | ||
+ | | Municipality: [[Dayton Borough, Armstrong County, Pennsylvania|Dayton Borough]] | ||
|- | |- | ||
| Operator Name: [[BLX INC]] | | Operator Name: [[BLX INC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: DAYTON UNITED METHOD CHURCH 1 | ||
|- | |- | ||
| First Permit Date: 2008-12-11 | | First Permit Date: 2008-12-11 | ||
Line 17: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
− | | Violations: | + | | Well Status: ACTIVE |
+ | |- | ||
+ | | Violations: 0 | ||
|- | |- | ||
| Latitude: 40.881369 | | Latitude: 40.881369 | ||
Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|- | |- | ||
− | | | + | | 2009-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 1104.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 65.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 43: | Line 53: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2010-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 7090.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 308.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 61: | Line 71: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2012-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 3978.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 366.0 |
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 2936.0 | ||
+ | | style="text-align:right;" | 359.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 70: | Line 89: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2014-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 2931.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 365.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 79: | Line 98: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 90: | Line 115: | ||
!scope="col" | FACILITY CITY | !scope="col" | FACILITY CITY | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2010-0 | | 2010-0 | ||
Line 108: | Line 122: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0101508 | | PA0101508 | ||
− | | | + | | FLUID RECOVERY SERVICE FRANKLIN FACILITY |
| FRANKLIN | | FRANKLIN | ||
| PA | | PA | ||
Line 119: | Line 133: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095443 | | PA0095443 | ||
− | | | + | | CREEKSIDE TREATMENT FACILITY |
| CREEKSIDE | | CREEKSIDE | ||
| PA | | PA | ||
Line 130: | Line 144: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0101508 | | PA0101508 | ||
− | | | + | | FLUID RECOVERY SERVICE FRANKLIN FACILITY |
| FRANKLIN | | FRANKLIN | ||
| PA | | PA | ||
Line 141: | Line 155: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095443 | | PA0095443 | ||
− | | | + | | CREEKSIDE TREATMENT FACILITY |
| CREEKSIDE | | CREEKSIDE | ||
| PA | | PA | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 153: | Line 173: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1798847 | | 1798847 | ||
Line 158: | Line 180: | ||
| No Violations Noted | | No Violations Noted | ||
| on-site meeting with operator to dicuss drill plan/site made - E&S ok/ID&pit ok | | on-site meeting with operator to dicuss drill plan/site made - E&S ok/ID&pit ok | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 165: | Line 189: | ||
| No Violations Noted | | No Violations Noted | ||
| Drilling was ongoing at the time of the inspection. Below grade pit had more than the two feet of required freeboard. Tool pusher informed WQS Higgins that drilling would not occur during the weekend and that they planned to hit the targeted formation on Monday morning. | | Drilling was ongoing at the time of the inspection. Below grade pit had more than the two feet of required freeboard. Tool pusher informed WQS Higgins that drilling would not occur during the weekend and that they planned to hit the targeted formation on Monday morning. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 172: | Line 198: | ||
| No Violations Noted | | No Violations Noted | ||
| Drilling was ongoing at the time of the inspection. Below grade pit had more than the two feet of required freeboard. Met onsite with David Miller of BLX, Inc. and David Bittinger of Bittinger drilling and discussed the possibility of solidifcation of the drill cuttings. Informed them that Mr. Mike Morgart, Hydrogeologist would review and approve the alternative waste management practice of solidification and that a copy of the forms to be filled out would be faxed to Mr. Bittinger. | | Drilling was ongoing at the time of the inspection. Below grade pit had more than the two feet of required freeboard. Met onsite with David Miller of BLX, Inc. and David Bittinger of Bittinger drilling and discussed the possibility of solidifcation of the drill cuttings. Informed them that Mr. Mike Morgart, Hydrogeologist would review and approve the alternative waste management practice of solidification and that a copy of the forms to be filled out would be faxed to Mr. Bittinger. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 179: | Line 207: | ||
| No Violations Noted | | No Violations Noted | ||
| site prepared, proper e/s in place. | | site prepared, proper e/s in place. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 186: | Line 216: | ||
| No Violations Noted | | No Violations Noted | ||
| drilling commenced - @ 16ft/E&S ok/ID&pit ok | | drilling commenced - @ 16ft/E&S ok/ID&pit ok | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 193: | Line 225: | ||
| No Violations Noted | | No Violations Noted | ||
| drilling @ 3000ft - gas flow 3MCF/E&S ok/ID&pit ok | | drilling @ 3000ft - gas flow 3MCF/E&S ok/ID&pit ok | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 200: | Line 234: | ||
| No Violations Noted | | No Violations Noted | ||
| drilling @ 650ft/ID&pit ok/E&S ok | | drilling @ 650ft/ID&pit ok/E&S ok | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 205: | Line 241: | ||
| 2146346 | | 2146346 | ||
| 2013-03-08 | | 2013-03-08 | ||
− | |||
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | Drilling had been completed well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Well is located in a parking lot for the Dayton United Methodist Church. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-005-30127 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.881369,"lon":-79.242938,"icon":""}]} |
County: Armstrong | |
Municipality: Dayton Borough | |
Operator Name: BLX INC | |
Well Pad ID: | |
Farm/Lease Name: DAYTON UNITED METHOD CHURCH 1 | |
First Permit Date: 2008-12-11 | |
Last Permit Date: 2008-12-11 | |
Spud Date: 2009-05-21 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 40.881369 | |
Longitude: -79.242938 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2009-0 | 1104.0 | 65.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 7090.0 | 308.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 5419.0 | 364.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 3978.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 2936.0 | 359.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-0 | 2931.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | PRODUCED FLUID | 70.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | FLUID RECOVERY SERVICE FRANKLIN FACILITY | FRANKLIN | PA |
2011-0 | PRODUCED FLUID | 80.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
2011-0 | PRODUCED FLUID | 70.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | FLUID RECOVERY SERVICE FRANKLIN FACILITY | FRANKLIN | PA |
2012-0 | PRODUCED FLUID | 75.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1798847 | 2009-05-06 | No Violations Noted | on-site meeting with operator to dicuss drill plan/site made - E&S ok/ID&pit ok | |||
1801978 | 2009-05-28 | No Violations Noted | Drilling was ongoing at the time of the inspection. Below grade pit had more than the two feet of required freeboard. Tool pusher informed WQS Higgins that drilling would not occur during the weekend and that they planned to hit the targeted formation on Monday morning. | |||
1801980 | 2009-06-01 | No Violations Noted | Drilling was ongoing at the time of the inspection. Below grade pit had more than the two feet of required freeboard. Met onsite with David Miller of BLX, Inc. and David Bittinger of Bittinger drilling and discussed the possibility of solidifcation of the drill cuttings. Informed them that Mr. Mike Morgart, Hydrogeologist would review and approve the alternative waste management practice of solidification and that a copy of the forms to be filled out would be faxed to Mr. Bittinger. | |||
1803646 | 2009-05-06 | No Violations Noted | site prepared, proper e/s in place. | |||
1804485 | 2009-05-21 | No Violations Noted | drilling commenced - @ 16ft/E&S ok/ID&pit ok | |||
1804492 | 2009-06-01 | No Violations Noted | drilling @ 3000ft - gas flow 3MCF/E&S ok/ID&pit ok | |||
1804504 | 2009-05-27 | No Violations Noted | drilling @ 650ft/ID&pit ok/E&S ok | |||
2146346 | 2013-03-08 | No Violations Noted | Drilling had been completed well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Well is located in a parking lot for the Dayton United Methodist Church. |
For data sources see[3]