X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-20554"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-115-20554
 
| Well ID: 37-115-20554
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.682336, -75.660833 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.682336, -75.660833 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Susquehanna County, Pennsylvania|Susquehanna]]
 
| County: [[Susquehanna County, Pennsylvania|Susquehanna]]
Line 9: Line 9:
 
| Municipality: [[Lenox Township, Susquehanna County, Pennsylvania|Lenox Township]]
 
| Municipality: [[Lenox Township, Susquehanna County, Pennsylvania|Lenox Township]]
 
|-
 
|-
| Operator Name: [[SOUTHWESTERN ENERGY PROD CO|SOUTHWESTERN ENERGY PROD CO]]
+
| Operator Name: [[SOUTHWESTERN ENERGY PROD CO]]
 
|-
 
|-
| Well Pad ID: [[148376]]
+
| Well Pad ID: [[148376|148376]]
 
|-
 
|-
 
| Farm/Lease Name: FROST MASTRI GAS UNIT 5H
 
| Farm/Lease Name: FROST MASTRI GAS UNIT 5H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
 
| Violations: 2
 
| Violations: 2
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | PERIOD
!scope="col" | DATE
+
!scope="col" | GAS QUANTITY
!scope="col" | DESCRIPTION
+
!scope="col" | GAS PRODUCTION DAYS
!scope="col" | COMMENT
+
!scope="col" | CONDENSATE QUANTITY
!scope="col" | VIOLATION ID
+
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 
|-
 
|-
| 1976509
+
| 2011-2
| 2011-05-27
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2002243
+
| 2012-1
| 2011-09-13
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Falcon Rig 16. Run 14 lb EMW for 15 min on shoe.  When drilled out, repeated test.  Tests ok.  Drillers log on site and up to date.  Secondary containment in place and in good condition.  Cement reports show good returns on both strings.  Currently preparing to skid rig over to 4H.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2011500
+
| 2012-2
| 2011-10-13
+
| style="text-align:right;" | 0.0
| Violation(s) Noted
+
| style="text-align:right;" | 0.0
| DEP on site 11:15. Desoto Rig 9.  Falcon 16 drilled tophole.  Currently at 11568'.  Proposed TD = 12, 577.  Will be cemented to above curve to @ 4000'.  Drillers log on site and up to date.  Walked site with Company Man.  Drilling fluid anddrill cutting on ground near mud storage tanks and solids tanks.  Violations cited.
+
| style="text-align:right;" | 0.0
| 622410
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2011500
+
| 2013-1
| 2011-10-13
+
| style="text-align:right;" | 0.0
| Violation(s) Noted
+
| style="text-align:right;" | 0.0
| DEP on site 11:15. Desoto Rig 9.  Falcon 16 drilled tophole.  Currently at 11568'.  Proposed TD = 12, 577.  Will be cemented to above curve to @ 4000'.  Drillers log on site and up to date.  Walked site with Company Man.  Drilling fluid anddrill cutting on ground near mud storage tanks and solids tanks.  Violations cited.
+
| style="text-align:right;" | 0.0
| 622411
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2014398
+
| 2013-2
| 2011-10-24
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| DESOTO Rig 9. Follow up inspection on previous violations cited for drill mud on ground and cutting on ground near solids tanks.  Operator cleaned up cuttings and mud and expanded secondary containment.  Checked cellar.  Operator asked to clean well stack and re-inspect cellar for bubbling.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2014-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 96: Line 116:
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2014-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 105: Line 125:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2015-02
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 114: Line 134:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 123: Line 143:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 132: Line 152:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 150: Line 176:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR119
 
| WMGR119
| EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT)
+
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
 
| WILLIAMSPORT
 
| WILLIAMSPORT
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1976509
 +
| 2011-05-27
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2002243
 +
| 2011-09-13
 +
| No Violations Noted
 +
| Falcon Rig 16.  Run 14 lb EMW for 15 min on shoe.  When drilled out, repeated test.  Tests ok.  Drillers log on site and up to date.  Secondary containment in place and in good condition.  Cement reports show good returns on both strings.  Currently preparing to skid rig over to 4H.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2011500
 +
| 2011-10-13
 +
| Violation(s) Noted
 +
| DEP on site 11:15.  Desoto Rig 9.  Falcon 16 drilled tophole.  Currently at 11568'.  Proposed TD = 12, 577.  Will be cemented to above curve to @ 4000'.  Drillers log on site and up to date.  Walked site with Company Man.  Drilling fluid anddrill cutting on ground near mud storage tanks and solids tanks.  Violations cited.
 +
| 622410
 +
| 78.54 - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
 +
| Operator failed to contain drilling dluid in containment.
 +
 
 +
Watson inspected on 10/24/2011 and noted no violations
 +
|-
 +
|-
 +
| 2011500
 +
| 2011-10-13
 +
| Violation(s) Noted
 +
| DEP on site 11:15.  Desoto Rig 9.  Falcon 16 drilled tophole.  Currently at 11568'.  Proposed TD = 12, 577.  Will be cemented to above curve to @ 4000'.  Drillers log on site and up to date.  Walked site with Company Man.  Drilling fluid anddrill cutting on ground near mud storage tanks and solids tanks.  Violations cited.
 +
| 622411
 +
| 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances.
 +
| Operator failed to contain residual waste in tank.
  
 +
Watson inspected on 10/24/2011 and noted no violations
 +
|-
 +
|-
 +
| 2014398
 +
| 2011-10-24
 +
| No Violations Noted
 +
| DESOTO Rig 9.  Follow up inspection on previous violations cited for drill mud on ground and cutting on ground near solids tanks.  Operator cleaned up cuttings and mud and expanded secondary containment.  Checked cellar.  Operator asked to clean well stack and re-inspect cellar for bubbling.
 +
|
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Inspection Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 11:04, 26 June 2015

Well Details

Well ID: 37-115-20554
Loading map...
County: Susquehanna
Municipality: Lenox Township
Operator Name: SOUTHWESTERN ENERGY PROD CO
Well Pad ID: 148376
Farm/Lease Name: FROST MASTRI GAS UNIT 5H
First Permit Date: 2011-04-21
Last Permit Date: 2011-04-21
Spud Date: 2011-08-18
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 2
Latitude: 41.682336
Longitude: -75.660833

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 0.0 0.0 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 FRACING FLUID WASTE 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT WILLIAMSPORT PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1976509 2011-05-27 No Violations Noted
2002243 2011-09-13 No Violations Noted Falcon Rig 16. Run 14 lb EMW for 15 min on shoe. When drilled out, repeated test. Tests ok. Drillers log on site and up to date. Secondary containment in place and in good condition. Cement reports show good returns on both strings. Currently preparing to skid rig over to 4H.
2011500 2011-10-13 Violation(s) Noted DEP on site 11:15. Desoto Rig 9. Falcon 16 drilled tophole. Currently at 11568'. Proposed TD = 12, 577. Will be cemented to above curve to @ 4000'. Drillers log on site and up to date. Walked site with Company Man. Drilling fluid anddrill cutting on ground near mud storage tanks and solids tanks. Violations cited. 622410 78.54 - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Operator failed to contain drilling dluid in containment.

Watson inspected on 10/24/2011 and noted no violations

2011500 2011-10-13 Violation(s) Noted DEP on site 11:15. Desoto Rig 9. Falcon 16 drilled tophole. Currently at 11568'. Proposed TD = 12, 577. Will be cemented to above curve to @ 4000'. Drillers log on site and up to date. Walked site with Company Man. Drilling fluid anddrill cutting on ground near mud storage tanks and solids tanks. Violations cited. 622411 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. Operator failed to contain residual waste in tank.

Watson inspected on 10/24/2011 and noted no violations

2014398 2011-10-24 No Violations Noted DESOTO Rig 9. Follow up inspection on previous violations cited for drill mud on ground and cutting on ground near solids tanks. Operator cleaned up cuttings and mud and expanded secondary containment. Checked cellar. Operator asked to clean well stack and re-inspect cellar for bubbling.

For data sources see[3]

References