X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20037"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-131-20037
 
| Well ID: 37-131-20037
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.639313, -75.973297 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.639313, -75.973297 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Wyoming County, Pennsylvania|Wyoming]]
 
| County: [[Wyoming County, Pennsylvania|Wyoming]]
Line 9: Line 9:
 
| Municipality: [[Washington Township, Wyoming County, Pennsylvania|Washington Township]]
 
| Municipality: [[Washington Township, Wyoming County, Pennsylvania|Washington Township]]
 
|-
 
|-
| Operator Name: [[CHESAPEAKE APPALACHIA LLC|CHESAPEAKE APPALACHIA LLC]]
+
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[148860]]
+
| Well Pad ID: [[148860|148860]]
 
|-
 
|-
 
| Farm/Lease Name: MCGRAW 2H
 
| Farm/Lease Name: MCGRAW 2H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
 
| Violations: 6
 
| Violations: 6
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | GAS QUANTITY
 +
!scope="col" | GAS PRODUCTION DAYS
 +
!scope="col" | CONDENSATE QUANTITY
 +
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2010-3
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2010-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2010-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-2
 +
| style="text-align:right;" | 827205.0
 +
| style="text-align:right;" | 93.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 2009095.0
 +
| style="text-align:right;" | 181.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-2
 +
| style="text-align:right;" | 1633497.0
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 981448.0
 +
| style="text-align:right;" | 142.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 757033.0
 +
| style="text-align:right;" | 109.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-01
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 143774.0
 +
| style="text-align:right;" | 20.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | TYPE
 +
!scope="col" | QUANTITY
 +
!scope="col" | UNITS
 +
!scope="col" | DISPOSAL METHOD
 +
!scope="col" | WASTE FACILITY PERMIT ID
 +
!scope="col" | WASTE FACILITY NAME
 +
!scope="col" | FACILITY CITY
 +
!scope="col" | FACILITY STATE
 +
|-
 +
| 2012-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 314.5
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 55.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR119
 +
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
 +
| WILLIAMSPORT
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 726.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 415.83
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 367.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 100.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC008
 +
| SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY
 +
|
 +
| PA
 +
|-
 +
|-
 +
| 2014-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 30.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC008
 +
| SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY
 +
|
 +
| PA
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 206.87
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 146.17
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 20.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC008
 +
| SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY
 +
|
 +
| PA
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 41: Line 311:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1922616
 
| 1922616
Line 46: Line 318:
 
| No Violations Noted
 
| No Violations Noted
 
| Rigging down to move to McGraw 5H
 
| Rigging down to move to McGraw 5H
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 54: Line 328:
 
| Onsite visit with DEP Geologist (Eric Rooney) and DEP WQS (Ryan Klemish).  Followup inpsection of possible stray gas in cellar.  Lower elbow on the 2" vent line of the 13 3/8" annulus had bubbles migrating out of joint.  Small intermitent bubbles seen every 10 sec.  Approx 6" of water in cellar at time of inspection.  Asked DEP rep to use flir camera to detect any gas that may be present as I wasn't sure if bubbling from elbow was gas migration or plumbing problem.  Also, Gauge on 13 3/8 showing 0 psi, however vavle closed during time of inspection and possible loose elbow.  Talked with completions supervisor Nick Pottmeyer stating they would go out and tighten up fittings, open the vavle and monitor for any pressure buildup.  Also asked Mr. Pottmeyer to replace the guage on the string with one with smaller graduations to detect any gas that may be present.
 
| Onsite visit with DEP Geologist (Eric Rooney) and DEP WQS (Ryan Klemish).  Followup inpsection of possible stray gas in cellar.  Lower elbow on the 2" vent line of the 13 3/8" annulus had bubbles migrating out of joint.  Small intermitent bubbles seen every 10 sec.  Approx 6" of water in cellar at time of inspection.  Asked DEP rep to use flir camera to detect any gas that may be present as I wasn't sure if bubbling from elbow was gas migration or plumbing problem.  Also, Gauge on 13 3/8 showing 0 psi, however vavle closed during time of inspection and possible loose elbow.  Talked with completions supervisor Nick Pottmeyer stating they would go out and tighten up fittings, open the vavle and monitor for any pressure buildup.  Also asked Mr. Pottmeyer to replace the guage on the string with one with smaller graduations to detect any gas that may be present.
 
| 601700
 
| 601700
 +
| 207B - Failure to case and cement to prevent migrations into fresh groundwater
 +
| 78.81(a)(2)&(3)
 
|-
 
|-
 
|-
 
|-
Line 61: Line 337:
 
| Onsite visit with DEP Geologist (Eric Rooney) and DEP WQS (Ryan Klemish).  Followup inpsection of possible stray gas in cellar.  Lower elbow on the 2" vent line of the 13 3/8" annulus had bubbles migrating out of joint.  Small intermitent bubbles seen every 10 sec.  Approx 6" of water in cellar at time of inspection.  Asked DEP rep to use flir camera to detect any gas that may be present as I wasn't sure if bubbling from elbow was gas migration or plumbing problem.  Also, Gauge on 13 3/8 showing 0 psi, however vavle closed during time of inspection and possible loose elbow.  Talked with completions supervisor Nick Pottmeyer stating they would go out and tighten up fittings, open the vavle and monitor for any pressure buildup.  Also asked Mr. Pottmeyer to replace the guage on the string with one with smaller graduations to detect any gas that may be present.
 
| Onsite visit with DEP Geologist (Eric Rooney) and DEP WQS (Ryan Klemish).  Followup inpsection of possible stray gas in cellar.  Lower elbow on the 2" vent line of the 13 3/8" annulus had bubbles migrating out of joint.  Small intermitent bubbles seen every 10 sec.  Approx 6" of water in cellar at time of inspection.  Asked DEP rep to use flir camera to detect any gas that may be present as I wasn't sure if bubbling from elbow was gas migration or plumbing problem.  Also, Gauge on 13 3/8 showing 0 psi, however vavle closed during time of inspection and possible loose elbow.  Talked with completions supervisor Nick Pottmeyer stating they would go out and tighten up fittings, open the vavle and monitor for any pressure buildup.  Also asked Mr. Pottmeyer to replace the guage on the string with one with smaller graduations to detect any gas that may be present.
 
| 601701
 
| 601701
 +
| 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 +
|
 
|-
 
|-
 
|-
 
|-
Line 68: Line 346:
 
| Follow-up of loose elbow on 2" vent line of 13 3/8".  Water drained from cellar.  Gauges were replaced with those of smaller graduations on casing strings.  300PSI on production string.
 
| Follow-up of loose elbow on 2" vent line of 13 3/8".  Water drained from cellar.  Gauges were replaced with those of smaller graduations on casing strings.  300PSI on production string.
 
| 600760
 
| 600760
 +
| 207B - Failure to case and cement to prevent migrations into fresh groundwater
 +
| 78.81(a)(2)&(3)
 
|-
 
|-
 
|-
 
|-
Line 75: Line 355:
 
| Follow-up of loose elbow on 2" vent line of 13 3/8".  Water drained from cellar.  Gauges were replaced with those of smaller graduations on casing strings.  300PSI on production string.
 
| Follow-up of loose elbow on 2" vent line of 13 3/8".  Water drained from cellar.  Gauges were replaced with those of smaller graduations on casing strings.  300PSI on production string.
 
| 600761
 
| 600761
 +
| 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 +
|
 
|-
 
|-
 
|-
 
|-
Line 82: Line 364:
 
| All valves were open and that there was no pressure on any of the gauges (including the production string).  I also noted that there was a brass vented nipple installed on the 2" vent line that appeared to be on the outside of the 13 3/8" annulus.
 
| All valves were open and that there was no pressure on any of the gauges (including the production string).  I also noted that there was a brass vented nipple installed on the 2" vent line that appeared to be on the outside of the 13 3/8" annulus.
 
| 600762
 
| 600762
 +
| 207B - Failure to case and cement to prevent migrations into fresh groundwater
 +
| 78.81(a)(2)&(3)
 
|-
 
|-
 
|-
 
|-
Line 89: Line 373:
 
| All valves were open and that there was no pressure on any of the gauges (including the production string).  I also noted that there was a brass vented nipple installed on the 2" vent line that appeared to be on the outside of the 13 3/8" annulus.
 
| All valves were open and that there was no pressure on any of the gauges (including the production string).  I also noted that there was a brass vented nipple installed on the 2" vent line that appeared to be on the outside of the 13 3/8" annulus.
 
| 600763
 
| 600763
 +
| 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 +
|
 
|-
 
|-
 
|-
 
|-
Line 95: Line 381:
 
| No Violations Noted
 
| No Violations Noted
 
| Reading at wellhead measured 50% methane on vent of 13 3/8".  During time of inspection noted that pressure guages were removed from the wellhead.
 
| Reading at wellhead measured 50% methane on vent of 13 3/8".  During time of inspection noted that pressure guages were removed from the wellhead.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 102: Line 390:
 
| No Violations Noted
 
| No Violations Noted
 
| Preparing location for fract ops
 
| Preparing location for fract ops
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 108: Line 398:
 
| 2011-02-16
 
| 2011-02-16
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 116: Line 408:
 
| No Violations Noted
 
| No Violations Noted
 
| Checked well.  Head being heated.  No activity.  13 3/8" being vented.
 
| Checked well.  Head being heated.  No activity.  13 3/8" being vented.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 123: Line 417:
 
| No Violations Noted
 
| No Violations Noted
 
| Laying down mats and liner to prepare for spudding of 5H
 
| Laying down mats and liner to prepare for spudding of 5H
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 130: Line 426:
 
| No Violations Noted
 
| No Violations Noted
 
| 200# gauge on surface.  0 psi.  Contacted Nick Pottmeyer requesting smaller gauge (50#) on surface casing string.
 
| 200# gauge on surface.  0 psi.  Contacted Nick Pottmeyer requesting smaller gauge (50#) on surface casing string.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 137: Line 435:
 
| No Violations Noted
 
| No Violations Noted
 
| 13 3/8 gauges replaced wth 50# as requested.  All other gauges 100#
 
| 13 3/8 gauges replaced wth 50# as requested.  All other gauges 100#
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 143: Line 443:
 
| 2011-09-19
 
| 2011-09-19
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 151: Line 453:
 
| No Violations Noted
 
| No Violations Noted
 
| cellar is dug out, no water.  9 5/8" X 13 3/8" annulus vented.  Checked with gas meter, no gas.
 
| cellar is dug out, no water.  9 5/8" X 13 3/8" annulus vented.  Checked with gas meter, no gas.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 161: Line 465:
 
9 X 5 - -2.4680 psi (not vented)
 
9 X 5 - -2.4680 psi (not vented)
 
5 1/2 - 29.634 psi
 
5 1/2 - 29.634 psi
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 173: Line 479:
 
9 5/8 x 13 3/8" annulus = 2.28 psi
 
9 5/8 x 13 3/8" annulus = 2.28 psi
 
Also on pad,  5H is producing and 1 empty cellar.
 
Also on pad,  5H is producing and 1 empty cellar.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2248241
| style="text-align:right;" | 827205.0
+
| 2014-02-25
| style="text-align:right;" | 93.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Producing well.  Cellar empty w/ a little snow.
| style="text-align:right;" | 0.0
+
Tbg  = 1205.9 psi
| style="text-align:right;" | 0.0
+
5 1/2" csg  = 12.9 psi
| style="text-align:right;" | 0.0
+
5 X 9" annulus = 0.28 psi
 +
9 X 13" annulus = 7.1 psi
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2337920
| style="text-align:right;" | 0.0
+
| 2015-01-20
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2348623
| style="text-align:right;" | 0.0
+
| 2015-02-18
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Chesapeake was in the process of breaking down secondary containment and washing rig mats. I recorded a conductivity reading of (3.59) milliSiemens/cm in water on containment on the western side of the pad near the cut slope. A vacuum truck operator was in the process of removing water on containment nearby area where the elevated conductivity was recorded. I pointed out to him the where the water with the elevated conductivity was. He claimed he would remove all of the water on containment. I recorded (3.62) milliSiemens/cm conductivity in water on the pad surface next to a heating unit and frac tank used to contain water to wash the rig mats. Mr. Wilkes informed that the water with the elevated conductivity readings off containment will be removed via and on-site vacuum truck.
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2349427
| style="text-align:right;" | 0.0
+
| 2015-02-26
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Chesapeake was in the process of breaking down secondary containment
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2010-2
+
| 2349574
| style="text-align:right;" | 0.0
+
| 2015-03-05
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| This administrative inspection has been created to document Chesapeake
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2010-3
+
| 2349622
| style="text-align:right;" | 0.0
+
| 2015-03-06
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Chesapeake was in the process of attempting to return the McGraw 2H and McGraw 5H wells into production. Mr. Krut contacted me on 3-5-15 regarding the removal of all of the secondary containment used for hydraulic fracturing operations. The containment was completely removed from the site on 3-4-15. It has taken several weeks to remove the containment from the site due to the weather
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 55.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR119
 
| EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT)
 
| WILLIAMSPORT
 
| PA
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 726.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
 
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2359214
| PRODUCED FLUID
+
| 2015-04-08
| style="text-align:right;" | 314.5
+
| No Violations Noted
| Bbl
+
| This administrative inspection has been created to document Chesapeake
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
 
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:38, 26 June 2015

Well Details

Well ID: 37-131-20037
Loading map...
County: Wyoming
Municipality: Washington Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148860
Farm/Lease Name: MCGRAW 2H
First Permit Date: 2010-05-12
Last Permit Date: 2010-05-12
Spud Date: 2010-08-24
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 6
Latitude: 41.639313
Longitude: -75.973297

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 827205.0 93.0 0.0 0.0 0.0 0.0
2013-1 2009095.0 181.0 0.0 0.0 0.0 0.0
2013-2 1633497.0 184.0 0.0 0.0 0.0 0.0
2014-1 981448.0 142.0 0.0 0.0 0.0 0.0
2014-2 757033.0 109.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 143774.0 20.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 PRODUCED FLUID 314.5 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 55.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT WILLIAMSPORT PA
2012-2 PRODUCED FLUID 726.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-1 PRODUCED FLUID 415.83 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-2 PRODUCED FLUID 367.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 DRILLING FLUID WASTE 100.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008 SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY PA
2014-1 FRACING FLUID WASTE 30.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008 SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY PA
2014-1 PRODUCED FLUID 206.87 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 146.17 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 20.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008 SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1922616 2010-10-25 No Violations Noted Rigging down to move to McGraw 5H
1930322 2010-11-23 Violation(s) Noted Onsite visit with DEP Geologist (Eric Rooney) and DEP WQS (Ryan Klemish). Followup inpsection of possible stray gas in cellar. Lower elbow on the 2" vent line of the 13 3/8" annulus had bubbles migrating out of joint. Small intermitent bubbles seen every 10 sec. Approx 6" of water in cellar at time of inspection. Asked DEP rep to use flir camera to detect any gas that may be present as I wasn't sure if bubbling from elbow was gas migration or plumbing problem. Also, Gauge on 13 3/8 showing 0 psi, however vavle closed during time of inspection and possible loose elbow. Talked with completions supervisor Nick Pottmeyer stating they would go out and tighten up fittings, open the vavle and monitor for any pressure buildup. Also asked Mr. Pottmeyer to replace the guage on the string with one with smaller graduations to detect any gas that may be present. 601700 207B - Failure to case and cement to prevent migrations into fresh groundwater 78.81(a)(2)&(3)
1930322 2010-11-23 Violation(s) Noted Onsite visit with DEP Geologist (Eric Rooney) and DEP WQS (Ryan Klemish). Followup inpsection of possible stray gas in cellar. Lower elbow on the 2" vent line of the 13 3/8" annulus had bubbles migrating out of joint. Small intermitent bubbles seen every 10 sec. Approx 6" of water in cellar at time of inspection. Asked DEP rep to use flir camera to detect any gas that may be present as I wasn't sure if bubbling from elbow was gas migration or plumbing problem. Also, Gauge on 13 3/8 showing 0 psi, however vavle closed during time of inspection and possible loose elbow. Talked with completions supervisor Nick Pottmeyer stating they would go out and tighten up fittings, open the vavle and monitor for any pressure buildup. Also asked Mr. Pottmeyer to replace the guage on the string with one with smaller graduations to detect any gas that may be present. 601701 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
1931929 2010-11-30 Violation(s) Noted Follow-up of loose elbow on 2" vent line of 13 3/8". Water drained from cellar. Gauges were replaced with those of smaller graduations on casing strings. 300PSI on production string. 600760 207B - Failure to case and cement to prevent migrations into fresh groundwater 78.81(a)(2)&(3)
1931929 2010-11-30 Violation(s) Noted Follow-up of loose elbow on 2" vent line of 13 3/8". Water drained from cellar. Gauges were replaced with those of smaller graduations on casing strings. 300PSI on production string. 600761 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
1931939 2010-12-03 Violation(s) Noted All valves were open and that there was no pressure on any of the gauges (including the production string). I also noted that there was a brass vented nipple installed on the 2" vent line that appeared to be on the outside of the 13 3/8" annulus. 600762 207B - Failure to case and cement to prevent migrations into fresh groundwater 78.81(a)(2)&(3)
1931939 2010-12-03 Violation(s) Noted All valves were open and that there was no pressure on any of the gauges (including the production string). I also noted that there was a brass vented nipple installed on the 2" vent line that appeared to be on the outside of the 13 3/8" annulus. 600763 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
1939058 2010-12-22 No Violations Noted Reading at wellhead measured 50% methane on vent of 13 3/8". During time of inspection noted that pressure guages were removed from the wellhead.
1944427 2011-01-04 No Violations Noted Preparing location for fract ops
1950451 2011-02-16 No Violations Noted
1955249 2011-01-24 No Violations Noted Checked well. Head being heated. No activity. 13 3/8" being vented.
1966044 2011-04-07 No Violations Noted Laying down mats and liner to prepare for spudding of 5H
1985334 2011-06-30 No Violations Noted 200# gauge on surface. 0 psi. Contacted Nick Pottmeyer requesting smaller gauge (50#) on surface casing string.
1987623 2011-07-13 No Violations Noted 13 3/8 gauges replaced wth 50# as requested. All other gauges 100#
2004017 2011-09-19 No Violations Noted
2062439 2012-03-15 No Violations Noted cellar is dug out, no water. 9 5/8" X 13 3/8" annulus vented. Checked with gas meter, no gas.
2120690 2012-09-13 No Violations Noted Well fract. 2 seperators, 2 tanks. 8 Brine water tanks, 11 fresh water tanks on location

13 X 9 - -0.6735 psi. Vented to atmosphere (70% spike combustible gas, 68% hold utilizing MSA 60) 9 X 5 - -2.4680 psi (not vented) 5 1/2 - 29.634 psi

2133552 2013-01-15 No Violations Noted Producing well. No water in cellar.

tbg = 2749.9 psi 5 1/2" csg = 11.1 psi 5 1/2 x 9 5/8" annulus = 0.94 psi 9 5/8 x 13 3/8" annulus = 2.28 psi Also on pad, 5H is producing and 1 empty cellar.

2248241 2014-02-25 No Violations Noted Producing well. Cellar empty w/ a little snow.

Tbg = 1205.9 psi 5 1/2" csg = 12.9 psi 5 X 9" annulus = 0.28 psi 9 X 13" annulus = 7.1 psi

2337920 2015-01-20 No Violations Noted
2348623 2015-02-18 No Violations Noted Chesapeake was in the process of breaking down secondary containment and washing rig mats. I recorded a conductivity reading of (3.59) milliSiemens/cm in water on containment on the western side of the pad near the cut slope. A vacuum truck operator was in the process of removing water on containment nearby area where the elevated conductivity was recorded. I pointed out to him the where the water with the elevated conductivity was. He claimed he would remove all of the water on containment. I recorded (3.62) milliSiemens/cm conductivity in water on the pad surface next to a heating unit and frac tank used to contain water to wash the rig mats. Mr. Wilkes informed that the water with the elevated conductivity readings off containment will be removed via and on-site vacuum truck.
2349427 2015-02-26 No Violations Noted Chesapeake was in the process of breaking down secondary containment
2349574 2015-03-05 No Violations Noted This administrative inspection has been created to document Chesapeake
2349622 2015-03-06 No Violations Noted Chesapeake was in the process of attempting to return the McGraw 2H and McGraw 5H wells into production. Mr. Krut contacted me on 3-5-15 regarding the removal of all of the secondary containment used for hydraulic fracturing operations. The containment was completely removed from the site on 3-4-15. It has taken several weeks to remove the containment from the site due to the weather
2359214 2015-04-08 No Violations Noted This administrative inspection has been created to document Chesapeake

For data sources see[3]

References