If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-063-37291 | | Well ID: 37-063-37291 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.435055, -79.127544 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Indiana County, Pennsylvania|Indiana]] | ||
+ | |- | ||
+ | | Municipality: [[West Wheatfield Township, Indiana County, Pennsylvania|West Wheatfield Township]] | ||
|- | |- | ||
| Operator Name: [[PENN VIEW EXPLORATION CORP]] | | Operator Name: [[PENN VIEW EXPLORATION CORP]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: ST CLAIR 2 | ||
|- | |- | ||
| First Permit Date: 2011-12-28 | | First Permit Date: 2011-12-28 | ||
Line 17: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
− | | Violations: | + | | Well Status: ACTIVE |
+ | |- | ||
+ | | Violations: 0 | ||
|- | |- | ||
| Latitude: 40.435055 | | Latitude: 40.435055 | ||
Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|- | |- | ||
− | | | + | | 2011-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 0.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 0.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 52: | Line 62: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-0 |
+ | | style="text-align:right;" | 6095.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 4709.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 61: | Line 80: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 79: | Line 104: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
− | | | + | | FLUID RECOVERY SERVICE JOSEPHINE FACILITY |
| JOSEPHINE | | JOSEPHINE | ||
| PA | | PA | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-0 |
| PRODUCED FLUID | | PRODUCED FLUID | ||
− | | style="text-align:right;" | | + | | style="text-align:right;" | 456.0 |
| Bbl | | Bbl | ||
− | | | + | | CENT WASTE TRT FAC NPDES DISCHARGE |
| PA0095273 | | PA0095273 | ||
− | | | + | | FLUID RECOVERY SERVICE JOSEPHINE FACILITY |
| JOSEPHINE | | JOSEPHINE | ||
| PA | | PA | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2014-0 |
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 91.0 | ||
+ | | Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
+ | | CAMBRIA COUNTY ROADSPREADING - JACKSON TOWNSHIP | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
| PRODUCED FLUID | | PRODUCED FLUID | ||
− | | style="text-align:right;" | | + | | style="text-align:right;" | 250.0 |
| Bbl | | Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
Line 106: | Line 142: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 113: | Line 155: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 2041291 | | 2041291 | ||
Line 125: | Line 169: | ||
No violations noted at this time. | No violations noted at this time. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 131: | Line 177: | ||
| 2012-02-14 | | 2012-02-14 | ||
| No Violations Noted | | No Violations Noted | ||
− | | First Class Energy was contracted by Penn View (Wayne Brannon | + | | First Class Energy was contracted by Penn View (Wayne Brannon ﾿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Water was recorded at 200 feet. Water Protection pipe (9 5/8﾿) was set at 421﾿. Pipe was cemented with 150 sacks of Class A with 15 bbls of return. Plug was down at 9:10 am on 2/10/12. Surface pipe (7﾿) was set at 1,117 feet with 185 sacks of Class A with 10 bbls return. Plug was down at 9:52 pm on 2/13/12. First Class Energy was currently drilling at 1, 300 feet. The anticipated total depth for the well was 4,745 feet. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 138: | Line 186: | ||
| 2012-02-16 | | 2012-02-16 | ||
| No Violations Noted | | No Violations Noted | ||
− | | First Class Energy was contracted by Penn View (Wayne Brannon | + | | First Class Energy was contracted by Penn View (Wayne Brannon ï¾– tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 145: | Line 195: | ||
| 2012-02-16 | | 2012-02-16 | ||
| No Violations Noted | | No Violations Noted | ||
− | | First Class Energy was contracted by Penn View (Wayne Brannon | + | | First Class Energy was contracted by Penn View (Wayne Brannon ï¾– tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 160: | Line 212: | ||
PA DEP Water Quality Specialist April Weiland was present during inspection. | PA DEP Water Quality Specialist April Weiland was present during inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 165: | Line 219: | ||
| 2151616 | | 2151616 | ||
| 2013-03-20 | | 2013-03-20 | ||
− | |||
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | First Class Energy was contracted by Penn View . Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Conductor pipe (20 モ) was set at 35 feet and was sanded in. Water was recorded at 60 feet and 540 feet. Water Protection pipe (9 5/8ヤ) was set at 431メ. Pipe was cemented with 176 sacks of Class A with 12 bbl. of return. Plug was down at 9:01 am on 3/18/13. Surface pipe (7ヤ) was set at 1,179 feet with 200 sacks of Class A with 12 bbl. return. Plug was down at 8:52 pm on 3/19/13. The anticipated total depth for the well was 4,975 feet. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-063-37291 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.435055,"lon":-79.127544,"icon":""}]} |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: PENN VIEW EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: ST CLAIR 2 | |
First Permit Date: 2011-12-28 | |
Last Permit Date: 2011-12-28 | |
Spud Date: 2012-02-09 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 40.435055 | |
Longitude: -79.127544 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 4567.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 6095.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-0 | 4709.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 295.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
2013-0 | PRODUCED FLUID | 456.0 | Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
2014-0 | PRODUCED FLUID | 91.0 | Bbl | ROAD SPREADING | CAMBRIA COUNTY ROADSPREADING - JACKSON TOWNSHIP | |||
2014-0 | PRODUCED FLUID | 250.0 | Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2041291 | 2012-02-08 | No Violations Noted | Site visit was due to spud notification.
Site E&S plan was at start of access road, howeve no site ID sign was installed. Site was constructed. Long access road was constructed and rocked. Snow and freezing temperatures kept E&S issues at a minimum. Site was constructed. Silt fence was installed. Pit was drilled but not yet lined. No violations noted at this time. |
|||
2042702 | 2012-02-14 | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon ﾿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Water was recorded at 200 feet. Water Protection pipe (9 5/8﾿) was set at 421﾿. Pipe was cemented with 150 sacks of Class A with 15 bbls of return. Plug was down at 9:10 am on 2/10/12. Surface pipe (7﾿) was set at 1,117 feet with 185 sacks of Class A with 10 bbls return. Plug was down at 9:52 pm on 2/13/12. First Class Energy was currently drilling at 1, 300 feet. The anticipated total depth for the well was 4,745 feet. | |||
2043974 | 2012-02-16 | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon ï¾– tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. | |||
2043985 | 2012-02-16 | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon ï¾– tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. | |||
2048847 | 2012-03-06 | No Violations Noted | Site visit was part of routine inspection.
Site E&S plan was at start of access road. Site ID sign was also installed. Well was drilled and was being placed into production. Long access road was still rocked and stable. Site was regraded and pit was removed. No violations noted at this time. PA DEP Water Quality Specialist April Weiland was present during inspection. |
|||
2151616 | 2013-03-20 | No Violations Noted | First Class Energy was contracted by Penn View . Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Conductor pipe (20 モ) was set at 35 feet and was sanded in. Water was recorded at 60 feet and 540 feet. Water Protection pipe (9 5/8ヤ) was set at 431メ. Pipe was cemented with 176 sacks of Class A with 12 bbl. of return. Plug was down at 9:01 am on 3/18/13. Surface pipe (7ヤ) was set at 1,179 feet with 200 sacks of Class A with 12 bbl. return. Plug was down at 8:52 pm on 3/19/13. The anticipated total depth for the well was 4,975 feet. |
For data sources see[3]