X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-27897"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-27897
 
| Well ID: 37-129-27897
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.134473, -79.546485 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.134473, -79.546485 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[East Huntingdon Township, Westmoreland County, Pennsylvania|East Huntingdon Township]]
 
|-
 
|-
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: GLICK BROTHERS 009
 
|-
 
|-
 
| First Permit Date: 2009-04-24
 
| First Permit Date: 2009-04-24
Line 16: Line 24:
 
|-
 
|-
 
| Horizontal: No
 
| Horizontal: No
 +
|-
 +
| Well Status: ACTIVE
 
|-
 
|-
 
| Violations: 1
 
| Violations: 1
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2010-0
| style="text-align:right;" | 6708.0
+
| style="text-align:right;" | 14520.0
 +
| style="text-align:right;" | 306.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 13552.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2013-0
| style="text-align:right;" | 13552.0
+
| style="text-align:right;" | 6708.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2014-0
| style="text-align:right;" | 14520.0
+
| style="text-align:right;" | 5363.0
| style="text-align:right;" | 306.0
+
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 70: Line 89:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 81: Line 106:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 45.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
 
| CREEKSIDE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
Line 99: Line 113:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 110: Line 124:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 117: Line 131:
 
| 2010-0
 
| 2010-0
 
| FRACING FLUID WASTE
 
| FRACING FLUID WASTE
| style="text-align:right;" | 1190.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 132: Line 146:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 +
| PA
 +
|-
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 105.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 +
| JOSEPHINE
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 144: Line 175:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1857560
 
| 1857560
 
| 2009-01-21
 
| 2009-01-21
 
| Violation(s) Noted
 
| Violation(s) Noted
| The Department conducted an investigation in response to a spud report that was sent in.  Upon inspection of the E&S controls the Department noticed dark green staining of the snow that was left on site.  After closer inspection of the unknown discharge, the Department spoke with two people on site to ask if they knew what had happened. The drilling company stated that the night crew had blown a hydraulic line and they didn¿t know that it had reached the controls. I immediately telephoned Mark Hopkins and Mike Cioffi and let him know of the discharge.  (CONT.)
+
| The Department conducted an investigation in response to a spud report that was sent in.  Upon inspection of the E&S controls the Department noticed dark green staining of the snow that was left on site.  After closer inspection of the unknown discharge, the Department spoke with two people on site to ask if they knew what had happened. The drilling company stated that the night crew had blown a hydraulic line and they didn﾿t know that it had reached the controls. I immediately telephoned Mark Hopkins and Mike Cioffi and let him know of the discharge.  (CONT.)
 
| 579825
 
| 579825
 +
| 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith
 +
|
 
|-
 
|-
 
|-
 
|-
Line 155: Line 190:
 
| 2009-01-21
 
| 2009-01-21
 
| Violation(s) Noted
 
| Violation(s) Noted
| The Department conducted an investigation in response to a spud report that was sent in.  Upon inspection of the E&S controls the Department noticed dark green staining of the snow that was left on site.  After closer inspection of the unknown discharge, the Department spoke with two people on site to ask if they knew what had happened. The drilling company stated that the night crew had blown a hydraulic line and they didn¿t know that it had reached the controls. I immediately telephoned Mark Hopkins and Mike Cioffi and let him know of the discharge.  (CONT.)
+
| The Department conducted an investigation in response to a spud report that was sent in.  Upon inspection of the E&S controls the Department noticed dark green staining of the snow that was left on site.  After closer inspection of the unknown discharge, the Department spoke with two people on site to ask if they knew what had happened. The drilling company stated that the night crew had blown a hydraulic line and they didn﾿t know that it had reached the controls. I immediately telephoned Mark Hopkins and Mike Cioffi and let him know of the discharge.  (CONT.)
 
| 579825
 
| 579825
 +
| 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith
 +
|
 
|-
 
|-
 
|-
 
|-
Line 163: Line 200:
 
| No Violations Noted
 
| No Violations Noted
 
| The Department conducted a compliance evaluation inspection for the violations noted on 1/21/10. (Operator discharged industrial waste to the ground.)(Operator failed to notify the Department of a pollution event.)    On the date of the compliance evaluation inspection all of the above referenced violations have been abated.  The Department also noted that during the inspection of the E&S controls, they began to be over topped from collection of water at the site.  The Department contacted Mike Cioffi and he stated it would be taken care of immediately.
 
| The Department conducted a compliance evaluation inspection for the violations noted on 1/21/10. (Operator discharged industrial waste to the ground.)(Operator failed to notify the Department of a pollution event.)    On the date of the compliance evaluation inspection all of the above referenced violations have been abated.  The Department also noted that during the inspection of the E&S controls, they began to be over topped from collection of water at the site.  The Department contacted Mike Cioffi and he stated it would be taken care of immediately.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 172: Line 211:
 
Well appears to be in production at this time.
 
Well appears to be in production at this time.
 
Site is graded, seeded and mulched.  The operator is close to achieving 70% vegetative cover.
 
Site is graded, seeded and mulched.  The operator is close to achieving 70% vegetative cover.
The access road is in good condition ¿ BMPs in place.  
+
The access road is in good condition ﾿ BMPs in place.  
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 22:28, 26 June 2015

Well Details

Well ID: 37-129-27897
Loading map...
County: Westmoreland
Municipality: East Huntingdon Township
Operator Name: KRIEBEL MINERALS INC
Well Pad ID:
Farm/Lease Name: GLICK BROTHERS 009
First Permit Date: 2009-04-24
Last Permit Date: 2009-04-24
Spud Date: 2010-01-01
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 1
Latitude: 40.134473
Longitude: -79.546485

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 14520.0 306.0 0.0 0.0 0.0 0.0
2011-0 13552.0 334.0 0.0 0.0 0.0 0.0
2012-0 9247.0 335.0 0.0 0.0 0.0 0.0
2013-0 6708.0 334.0 0.0 0.0 0.0 0.0
2014-0 5363.0 334.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 DRILLING FLUID WASTE 550.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2010-0 DRILLING FLUID WASTE 990.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2012-0 PRODUCED FLUID 45.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2014-0 PRODUCED FLUID 105.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1857560 2009-01-21 Violation(s) Noted The Department conducted an investigation in response to a spud report that was sent in. Upon inspection of the E&S controls the Department noticed dark green staining of the snow that was left on site. After closer inspection of the unknown discharge, the Department spoke with two people on site to ask if they knew what had happened. The drilling company stated that the night crew had blown a hydraulic line and they didn﾿t know that it had reached the controls. I immediately telephoned Mark Hopkins and Mike Cioffi and let him know of the discharge. (CONT.) 579825 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith
1857560 2009-01-21 Violation(s) Noted The Department conducted an investigation in response to a spud report that was sent in. Upon inspection of the E&S controls the Department noticed dark green staining of the snow that was left on site. After closer inspection of the unknown discharge, the Department spoke with two people on site to ask if they knew what had happened. The drilling company stated that the night crew had blown a hydraulic line and they didn﾿t know that it had reached the controls. I immediately telephoned Mark Hopkins and Mike Cioffi and let him know of the discharge. (CONT.) 579825 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith
1858242 2010-01-25 No Violations Noted The Department conducted a compliance evaluation inspection for the violations noted on 1/21/10. (Operator discharged industrial waste to the ground.)(Operator failed to notify the Department of a pollution event.) On the date of the compliance evaluation inspection all of the above referenced violations have been abated. The Department also noted that during the inspection of the E&S controls, they began to be over topped from collection of water at the site. The Department contacted Mike Cioffi and he stated it would be taken care of immediately.
1888054 2010-05-24 No Violations Noted Drilling was completed.

Well appears to be in production at this time. Site is graded, seeded and mulched. The operator is close to achieving 70% vegetative cover. The access road is in good condition ﾿ BMPs in place.

For data sources see[3]

References