X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-20621"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-117-20621
 
| Well ID: 37-117-20621
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.689755, -77.560883 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.689755, -77.560883 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Tioga County, Pennsylvania|Tioga]]
 
| County: [[Tioga County, Pennsylvania|Tioga]]
Line 9: Line 9:
 
| Municipality: [[Gaines Township, Tioga County, Pennsylvania|Gaines Township]]
 
| Municipality: [[Gaines Township, Tioga County, Pennsylvania|Gaines Township]]
 
|-
 
|-
| Operator Name: [[ULTRA RESOURCES INC|ULTRA RESOURCES INC]]
+
| Operator Name: [[ULTRA RESOURCES INC]]
 
|-
 
|-
| Well Pad ID: [[149057]]
+
| Well Pad ID: [[149057|149057]]
 
|-
 
|-
 
| Farm/Lease Name: PIERSON 810 6H
 
| Farm/Lease Name: PIERSON 810 6H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
 
| Violations: 3
 
| Violations: 3
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | PERIOD
!scope="col" | DATE
+
!scope="col" | GAS QUANTITY
!scope="col" | DESCRIPTION
+
!scope="col" | GAS PRODUCTION DAYS
!scope="col" | COMMENT
+
!scope="col" | CONDENSATE QUANTITY
!scope="col" | VIOLATION ID
+
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 1916292
+
| 2010-3
| 2010-09-29
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1965575
+
| 2010-2
| 2011-04-12
+
| style="text-align:right;" | 0.0
| Violation(s) Noted
+
| style="text-align:right;" | 0.0
| High sp con on pad surface puddles.
+
| style="text-align:right;" | 0.0
| 608858
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1965575
+
| 2010-2
| 2011-04-12
+
| style="text-align:right;" | 0.0
| Violation(s) Noted
+
| style="text-align:right;" | 0.0
| High sp con on pad surface puddles.
+
| style="text-align:right;" | 0.0
| 608859
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1965575
+
| 2011-1
| 2011-04-12
+
| style="text-align:right;" | 82427.0
| Violation(s) Noted
+
| style="text-align:right;" | 69.0
| High sp con on pad surface puddles.
+
| style="text-align:right;" | 0.0
| 608860
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2039718
+
| 2011-2
| 2012-01-31
+
| style="text-align:right;" | 204524.0
| No Violations Noted
+
| style="text-align:right;" | 184.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2054149
+
| 2012-1
| 2012-03-21
+
| style="text-align:right;" | 141305.0
| No Violations Noted
+
| style="text-align:right;" | 182.0
| A routine inspection was conducted at the Pierson 810 pad on Mar. 21, 2012.  Seven wells are drilled (1H, 2H, 3H, 4H, 5H, 6H, and 8H) and one additional well is permitted (7H).  The Fox pad has not yet been constructed.  The erosion control BMPs were inspected and wer found to be functioning and maintained.  Several puddles around the pad were monitored with a conductivity probe.  No elevated readings for specific conductivity were found outside containment.  A reading of 3,200 µS was taken from inside the secondary containment for the production tanks.  This material should be recovered and disposed of properly.  Both cut and fill slopes were showing signs of sporadic vegetative growth.  These areas need to be assessed to determine if re-seeding is warranted.  No violations were cited during this inspection. - MRN
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2081848
+
| 2012-2
| 2012-07-09
+
| style="text-align:right;" | 131448.0
| No Violations Noted
+
| style="text-align:right;" | 184.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2013-1
| style="text-align:right;" | 133116.0
+
| style="text-align:right;" | 114753.0
| style="text-align:right;" | 184.0
+
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 110: Line 116:
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2013-2
| style="text-align:right;" | 143628.0
+
| style="text-align:right;" | 106876.0
| style="text-align:right;" | 182.0
+
| style="text-align:right;" | 174.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 119: Line 125:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2014-1
| style="text-align:right;" | 169271.0
+
| style="text-align:right;" | 88525.0
| style="text-align:right;" | 183.0
+
| style="text-align:right;" | 145.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 128: Line 134:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2014-2
| style="text-align:right;" | 82638.0
+
| style="text-align:right;" | 104132.25
| style="text-align:right;" | 69.0
+
| style="text-align:right;" | 174.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 137: Line 143:
 
|-
 
|-
 
|-
 
|-
| 2010-2
+
| 2015-02
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-01
 +
| style="text-align:right;" | 11495.57
 +
| style="text-align:right;" | 22.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 146: Line 161:
 
|-
 
|-
 
|-
 
|-
| 2010-3
+
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 155: Line 170:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 167: Line 188:
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 
|-
 
|-
| 2012-2
+
| 2013-2
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 468.3
+
| style="text-align:right;" | 249.8
 
| Bbl
 
| Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR119
+
| WMGR123NC010
| EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT)
+
| HYDRO RECOVERY LP ANTRIM FACILITY
| WILLIAMSPORT
+
| WELLSBORO
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2012-2
+
| 2013-2
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 486.7
+
| style="text-align:right;" | 188.0
 
| Bbl
 
| Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR0123
 
| WMGR0123
| HYDRO RECOVERY - BLOSSBURG
+
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| BLOSSBURG
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2014-1
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 3577.7
+
| style="text-align:right;" | 265.5
 
| Bbl
 
| Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC010
 +
| HYDRO RECOVERY LP ANTRIM FACILITY
 +
| WELLSBORO
 +
| PA
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1916292
 +
| 2010-09-29
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1965575
 +
| 2011-04-12
 +
| Violation(s) Noted
 +
| High sp con on pad surface puddles.
 +
| 608858
 +
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 +
|
 +
|-
 +
|-
 +
| 1965575
 +
| 2011-04-12
 +
| Violation(s) Noted
 +
| High sp con on pad surface puddles.
 +
| 608859
 +
| 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
 +
|
 +
|-
 +
|-
 +
| 1965575
 +
| 2011-04-12
 +
| Violation(s) Noted
 +
| High sp con on pad surface puddles.
 +
| 608860
 +
| 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances.
 +
|
 +
|-
 +
|-
 +
| 2039718
 +
| 2012-01-31
 +
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
| FRAC WATER REUSE
 
 
|  
 
|  
| PA
 
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2054149
| PRODUCED FLUID
+
| 2012-03-21
| style="text-align:right;" | 7295.4
+
| No Violations Noted
| Bbl
+
| A routine inspection was conducted at the Pierson 810 pad on Mar. 21, 2012.  Seven wells are drilled (1H, 2H, 3H, 4H, 5H, 6H, and 8H) and one additional well is permitted (7H).  The Fox pad has not yet been constructed.  The erosion control BMPs were inspected and wer found to be functioning and maintained.  Several puddles around the pad were monitored with a conductivity probe.  No elevated readings for specific conductivity were found outside containment.  A reading of 3,200 ï¾µS was taken from inside the secondary containment for the production tanks.  This material should be recovered and disposed of properly.  Both cut and fill slopes were showing signs of sporadic vegetative growth.  These areas need to be assessed to determine if re-seeding is warranted.  No violations were cited during this inspection. - MRN
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
|  
| WMGR119
+
|  
| EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT)
+
|  
| WILLIAMSPORT
 
| PA
 
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2081848
| PRODUCED FLUID
+
| 2012-07-09
| style="text-align:right;" | 5088.3
+
| No Violations Noted
| Bbl
+
|  
| REUSE OTHER THAN ROAD SPREADING
+
|  
 
|  
 
|  
| FRAC WATER REUSE
 
 
|  
 
|  
| PA
 
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2210699
| PRODUCED FLUID
+
| 2013-10-07
| style="text-align:right;" | 1711.5
+
| No Violations Noted
| Bbl
+
| On October 7, 2013 an inspection was conducted at the Pierson 810 pad in Gaines Township, Tioga County.  The last inspection conducted on behalf of the operator was on 10/4/13.  During this inspection the following was noted:  The silt sock installed at this has degraded over time and is in need of maintenance or replacement prior to any additional earth disturbance activities.  Several area of the site are in need of additional stabilization.  No evidence of sediment transport off-site was observed during this inspection.  Several puddles were screened and no exhibited elevated conductance.  No violations were cited during this inspection.
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
|  
| WMGR0123
+
|  
| HYDRO RECOVERY - BLOSSBURG
+
|  
| BLOSSBURG
 
| PA
 
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 23:33, 26 June 2015

Well Details

Well ID: 37-117-20621
Loading map...
County: Tioga
Municipality: Gaines Township
Operator Name: ULTRA RESOURCES INC
Well Pad ID: 149057
Farm/Lease Name: PIERSON 810 6H
First Permit Date: 2010-03-23
Last Permit Date: 2010-11-16
Spud Date: 2010-09-28
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 3
Latitude: 41.689755
Longitude: -77.560883

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 82427.0 69.0 0.0 0.0 0.0 0.0
2011-2 204524.0 184.0 0.0 0.0 0.0 0.0
2012-1 141305.0 182.0 0.0 0.0 0.0 0.0
2012-2 131448.0 184.0 0.0 0.0 0.0 0.0
2013-1 114753.0 181.0 0.0 0.0 0.0 0.0
2013-2 106876.0 174.0 0.0 0.0 0.0 0.0
2014-1 88525.0 145.0 0.0 0.0 0.0 0.0
2014-2 104132.25 174.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 11495.57 22.0 0.0 0.0 0.0 0.0
2015-03 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-2 PRODUCED FLUID 249.8 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010 HYDRO RECOVERY LP ANTRIM FACILITY WELLSBORO PA
2013-2 PRODUCED FLUID 188.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
2014-1 PRODUCED FLUID 265.5 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010 HYDRO RECOVERY LP ANTRIM FACILITY WELLSBORO PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1916292 2010-09-29 No Violations Noted
1965575 2011-04-12 Violation(s) Noted High sp con on pad surface puddles. 608858 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
1965575 2011-04-12 Violation(s) Noted High sp con on pad surface puddles. 608859 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
1965575 2011-04-12 Violation(s) Noted High sp con on pad surface puddles. 608860 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances.
2039718 2012-01-31 No Violations Noted
2054149 2012-03-21 No Violations Noted A routine inspection was conducted at the Pierson 810 pad on Mar. 21, 2012. Seven wells are drilled (1H, 2H, 3H, 4H, 5H, 6H, and 8H) and one additional well is permitted (7H). The Fox pad has not yet been constructed. The erosion control BMPs were inspected and wer found to be functioning and maintained. Several puddles around the pad were monitored with a conductivity probe. No elevated readings for specific conductivity were found outside containment. A reading of 3,200 ï¾µS was taken from inside the secondary containment for the production tanks. This material should be recovered and disposed of properly. Both cut and fill slopes were showing signs of sporadic vegetative growth. These areas need to be assessed to determine if re-seeding is warranted. No violations were cited during this inspection. - MRN
2081848 2012-07-09 No Violations Noted
2210699 2013-10-07 No Violations Noted On October 7, 2013 an inspection was conducted at the Pierson 810 pad in Gaines Township, Tioga County. The last inspection conducted on behalf of the operator was on 10/4/13. During this inspection the following was noted: The silt sock installed at this has degraded over time and is in need of maintenance or replacement prior to any additional earth disturbance activities. Several area of the site are in need of additional stabilization. No evidence of sediment transport off-site was observed during this inspection. Several puddles were screened and no exhibited elevated conductance. No violations were cited during this inspection.

For data sources see[3]

References