| Well ID: 34-133-24467
 
| Well ID: 34-133-24467
 +
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.04378832, -81.31412306 | width=100% | height=100% }}
 
|-
 
|-
| County:
+
| County: [[Portage County, Ohio|Portage]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[M & M ROYALTY LTD]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date: 2014-10-31
 
|-
 
|-
| Unconventional:
+
| Unconventional:  
 
|-
 
|-
| Horizontal:
+
| Configuration:  
 
|-
 
|-
| Producing:
+
| Well Status: Well Drilled
 
|-
 
|-
| Violations:
+
| Violations: 0
 
|-
 
|-
| Latitude:
+
| Latitude: 41.04378832
 
|-
 
|-
| Longitude:
+
| Longitude: -81.31412306
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 63: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1007493394
 +
| 2014-08-18
 +
|
 +
| I was on location to conduct an urban area, pre-site inspection of the location.  I was accompanied by Mike Weinsz and Matt Egnotovich.  The location is in a farm field and is a large swale.  The location will require a big cut and I asked them to stockpile the topsoil to the south to form a noise barrier and place silt fence along the east side of location to protect the drainage area.  See pre-site report for more details.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1007507856
 +
| 2014-10-27
 +
|
 +
| I was on location to check the construction status of this drilling site.  The site has been cut and the topsoil has been stockpiled to the south and west of the location.  The silt fence I requested to be installed during the pre-site inspection has been properly placed to the east to protect the wetlands and drainage area from sedimentation.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1101700675
 +
| 2014-11-24
 +
|
 +
| I was on site to check the status of the drilling location.  Advent Drilling has moved all the drilling equipment off location.  Hugh Palmer Contracting has solidified and closed the drilling pits.  The location is graded and ready for completion operations.  Erosion controls are still in place and functioning properly.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1160771999
 +
| 2014-11-05
 +
|
 +
| I was on location to check the drilling status of Advent Rig #1.  Mike Weinsz (M&M Royalty) was on location and he informed me that they had hit a lot of water in the Lockport Dolomite.  They were currently drilling at 4,094' and pumping water from the blow pit into the reserve and working pits.  The blow pit was filling up and had several feet of freeboard.  The water was being produced from the Newburg Porosity Zone and was creating a sulphurous odor.  I monitored the air quality at the discharge line into the blow pit and did not detect any hydrogen sulfide (H2S) or methane (CH4) gases emanating from the discharge.  A decision was made at this time to load the hole and switch to fluid drilling operations in order to shut off the flow of water.  They will begin hauling water from the blow pit.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1836426708
 +
| 2014-11-18
 +
|
 +
| I met Mike Weinsz (M&M Royalty) to pick up the casing ticket from the 4.5 production job from 11-15-14.  Advent is rigging down and preparing to move.  Most of the water has been hauled from the drilling pits.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1966205996
 +
| 2014-12-18
 +
|
 +
| I was on location to witness stimulation operations on this Rose Run Sandstone well.  Mike Weinsz (M&M), Chipco, and Universal Well Services were on location to conduct fracturing operations.  The well was fractured and treated with 1752 barrels of water and 44,600 pounds of 20/40 mesh sand.  The annulus between the 8.625 surface casing and the 4.5 production casing was open during the job.  No pressure deviations were encountered during treatment and the job went as designed.  See stimulation report for more details on this job.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -277360426
 +
| 2014-11-02
 +
|
 +
| I was on location to witness the cementing of the 8.625 intermediate casing.  Advent drilled an 11 intermediate hole to a depth of 1,041'  and ran 23 joints of 8.625 intermediate casing to a depth of 1,011' plus a 15' landing joint.  Universal rigged up, tested the lines, then mixed and pumped 58.8 barrels of Type 1 cement slurry, dropped the plug, and displaced the plug with 64 barrels of water.  8 barrels of cement circulated and held at the surface.  No violations.  See casing ticket for more details on this job.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -29096414
 +
| 2015-04-15
 +
|
 +
| I was on location to check the status of preliminary restoration.  Drilling was completed on 11/15/14 and stimulation operations took place on 12/18/14.  The pits have been solidified and closed and all drilling equipment has been removed from the location.  There is a 300 barrel frac tank still on location that was used during flow back operations.  The well is currently producing with the aid of a natural gas powered pumping unit and a barrier has been built next to the motor to help diffuse the noise from the motor.  The long winter and wet spring have delayed restoration operations.  The stockpiled topsoil needs to be spread, graded, and seeded.  A bulldozer and trac-hoe are on location for restoration work.  I will check back later on progress.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -484353494
 +
| 2014-10-31
 +
|
 +
| I was on location to inspect the drilling progress of Advent Drilling Rig #1.  They spudded the 14.75 conductor hole this morning and are currently drilling at a depth of 200' with freshwater.  The pits are in good condition and have plenty of freeboard.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -498699986
 +
| 2014-11-10
 +
|
 +
| I performed a status check on the above location. At present Advent Drilling is at a depth of 6541'. Permits and conditions are posted. Pits and liners are in good condition. Locations is clean. No noted violations at this time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -562206688
 +
| 2014-11-12
 +
|
 +
| I was on location to check the drilling status of Advent Rig #1.  The rig is currently tripping drill pipe out of the hole from a depth of 6977' due to drill bit issues.  They have approximately 200' left to drill to reach total depth.  The drilling pits are in good condition and have plenty of freeboard.  The drilling location is soft and muddy.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 631875145
 +
| 2014-11-01
 +
|
 +
| I was on location at 7:00am to witness the cementing of the 11.75 surface casing.  Advent Drilling drilled a 14.75 hole to a depth of 493' and ran 11 joints of 42lb/ft. casing to a depth of 463' with a guide shoe and 3 centralizers.  Universal cemented the casing with 56 barrels of Type I cement slurry, dropped the wiper plug, and displaced the plug to 443' with 53 barrels of freshwater.  5 barrels of cement circulated and held at the surface.  No violations.  See casing ticket for more details on this job.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 798494113
 +
| 2014-11-14
 +
|
 +
| I was on location to check the status of Advent Drilling Rig #1.  They have reached a total depth of 7170' and are currently circulating to clean up the 7.875 bore hole.  I inspected the 4.5 casing on the racks and it is new, 11.6lb/ft., J-55 & WTC80, Range-3 pipe.  Cementing operations should take place tomorrow (11/15/14).  The pits are in good condition and have plenty of freeboard.  No violations.
 +
|
 +
|
 +
|
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 10:50, 14 July 2015

Well Details

Well ID: 34-133-24467
Loading map...
County: Portage
Municipality:
Operator Name: M & M ROYALTY LTD
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-10-31
Unconventional:
Configuration:
Well Status: Well Drilled
Violations: 0
Latitude: 41.04378832
Longitude: -81.31412306

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1007493394 2014-08-18 I was on location to conduct an urban area, pre-site inspection of the location. I was accompanied by Mike Weinsz and Matt Egnotovich. The location is in a farm field and is a large swale. The location will require a big cut and I asked them to stockpile the topsoil to the south to form a noise barrier and place silt fence along the east side of location to protect the drainage area. See pre-site report for more details. No violations.
1007507856 2014-10-27 I was on location to check the construction status of this drilling site. The site has been cut and the topsoil has been stockpiled to the south and west of the location. The silt fence I requested to be installed during the pre-site inspection has been properly placed to the east to protect the wetlands and drainage area from sedimentation. No violations.
-1101700675 2014-11-24 I was on site to check the status of the drilling location. Advent Drilling has moved all the drilling equipment off location. Hugh Palmer Contracting has solidified and closed the drilling pits. The location is graded and ready for completion operations. Erosion controls are still in place and functioning properly. No violations.
1160771999 2014-11-05 I was on location to check the drilling status of Advent Rig #1. Mike Weinsz (M&M Royalty) was on location and he informed me that they had hit a lot of water in the Lockport Dolomite. They were currently drilling at 4,094' and pumping water from the blow pit into the reserve and working pits. The blow pit was filling up and had several feet of freeboard. The water was being produced from the Newburg Porosity Zone and was creating a sulphurous odor. I monitored the air quality at the discharge line into the blow pit and did not detect any hydrogen sulfide (H2S) or methane (CH4) gases emanating from the discharge. A decision was made at this time to load the hole and switch to fluid drilling operations in order to shut off the flow of water. They will begin hauling water from the blow pit. No violations.
-1836426708 2014-11-18 I met Mike Weinsz (M&M Royalty) to pick up the casing ticket from the 4.5 production job from 11-15-14. Advent is rigging down and preparing to move. Most of the water has been hauled from the drilling pits. No violations.
1966205996 2014-12-18 I was on location to witness stimulation operations on this Rose Run Sandstone well. Mike Weinsz (M&M), Chipco, and Universal Well Services were on location to conduct fracturing operations. The well was fractured and treated with 1752 barrels of water and 44,600 pounds of 20/40 mesh sand. The annulus between the 8.625 surface casing and the 4.5 production casing was open during the job. No pressure deviations were encountered during treatment and the job went as designed. See stimulation report for more details on this job. No violations.
-277360426 2014-11-02 I was on location to witness the cementing of the 8.625 intermediate casing. Advent drilled an 11 intermediate hole to a depth of 1,041' and ran 23 joints of 8.625 intermediate casing to a depth of 1,011' plus a 15' landing joint. Universal rigged up, tested the lines, then mixed and pumped 58.8 barrels of Type 1 cement slurry, dropped the plug, and displaced the plug with 64 barrels of water. 8 barrels of cement circulated and held at the surface. No violations. See casing ticket for more details on this job.
-29096414 2015-04-15 I was on location to check the status of preliminary restoration. Drilling was completed on 11/15/14 and stimulation operations took place on 12/18/14. The pits have been solidified and closed and all drilling equipment has been removed from the location. There is a 300 barrel frac tank still on location that was used during flow back operations. The well is currently producing with the aid of a natural gas powered pumping unit and a barrier has been built next to the motor to help diffuse the noise from the motor. The long winter and wet spring have delayed restoration operations. The stockpiled topsoil needs to be spread, graded, and seeded. A bulldozer and trac-hoe are on location for restoration work. I will check back later on progress. No violations.
-484353494 2014-10-31 I was on location to inspect the drilling progress of Advent Drilling Rig #1. They spudded the 14.75 conductor hole this morning and are currently drilling at a depth of 200' with freshwater. The pits are in good condition and have plenty of freeboard. No violations.
-498699986 2014-11-10 I performed a status check on the above location. At present Advent Drilling is at a depth of 6541'. Permits and conditions are posted. Pits and liners are in good condition. Locations is clean. No noted violations at this time.
-562206688 2014-11-12 I was on location to check the drilling status of Advent Rig #1. The rig is currently tripping drill pipe out of the hole from a depth of 6977' due to drill bit issues. They have approximately 200' left to drill to reach total depth. The drilling pits are in good condition and have plenty of freeboard. The drilling location is soft and muddy. No violations.
631875145 2014-11-01 I was on location at 7:00am to witness the cementing of the 11.75 surface casing. Advent Drilling drilled a 14.75 hole to a depth of 493' and ran 11 joints of 42lb/ft. casing to a depth of 463' with a guide shoe and 3 centralizers. Universal cemented the casing with 56 barrels of Type I cement slurry, dropped the wiper plug, and displaced the plug to 443' with 53 barrels of freshwater. 5 barrels of cement circulated and held at the surface. No violations. See casing ticket for more details on this job.
798494113 2014-11-14 I was on location to check the status of Advent Drilling Rig #1. They have reached a total depth of 7170' and are currently circulating to clean up the 7.875 bore hole. I inspected the 4.5 casing on the racks and it is new, 11.6lb/ft., J-55 & WTC80, Range-3 pipe. Cementing operations should take place tomorrow (11/15/14). The pits are in good condition and have plenty of freeboard. No violations.

For data sources see[1]