X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-031-27241"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-031-27241
 
| Well ID: 34-031-27241
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.3021497847, -81.8509048396 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.30214978, -81.85090484 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Coshocton County, Ohio|Coshocton]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BUCKEYE BRINE LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2014-08-25
 
| Spud Date: 2014-08-25
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Active Injection
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.3021497847
+
| Latitude: 40.30214978
 
|-
 
|-
| Longitude: -81.8509048396
+
| Longitude: -81.85090484
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 1994-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 373.0
 +
|
 +
|-
 +
|-
 +
| 1996-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 392.0
 +
|
 +
|-
 +
|-
 +
| 1997-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 239.0
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1410214007
 +
| 2014-09-07
 +
|
 +
| On site to witness placement of float equipment on casing and to witness cementing of production casing on SWIW well.
 +
Note: Hole size was 10.625 drilled to a depth of 6056' and they ran 6015' of 8.625 casing and it was cemented to surface cementing details of casing ticket.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1410214978
 +
| 2014-09-08
 +
|
 +
| Inspection revealed that Wildcat Drilling had to wash in casing to setting depth and they were stuck a couple of times and once they got casing in hole we circulated two bottoms up prior to letting Universal Well Services cement pipe in place.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1413759848
 +
| 2014-10-17
 +
|
 +
| Inspection revealed that well is not in operation at this time owner is still constructing flow line to well head and seismic monitoring is being performed.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1421354103
 +
| 2015-01-15
 +
|
 +
| On site to witness owner shut down the number one well and start up the number three well and we monitored pressures while injecting fluids and it was noted that several Elite Oilfield Services vacuum trucks were waiting to unload at the facility during my inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1555770320
 +
| 2015-04-07
 +
|
 +
| Inspection revealed that injection pump was in operation today and operator stated that they are receiving approximately 150 loads of brine per day so far this month.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1783085157
 +
| 2014-11-06
 +
|
 +
| Restoration work at the site has been completed well site has been restored and vegetation has begun to grow.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -183072802
 +
| 2015-03-12
 +
|
 +
| Inspection on this day revealed that injection pump was in operation and it was noted that several vacuum trucks/tankers were waiting to unload at the facility.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -191659703
 +
| 2014-09-10
 +
|
 +
| Inspection revealed that Wildcat Wireline services were on site to bond log 8.625 casing and they had trouble with there electronics and owner had to arrange to find another logging company to log the well.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1924306550
 
| -1924306550
 
| 2014-08-11
 
| 2014-08-11
|
+
|  
 
| On site with company reps to discuss upcoming drilling project.
 
| On site with company reps to discuss upcoming drilling project.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1977663657
 +
| 2015-06-09
 +
|
 +
| Inspection revealed that injection pump to this well was in operation on the day of my inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -2104084835
 +
| 2014-09-15
 +
|
 +
| On site to witness tubing&packer run into well and once in place pressure test annulus of tubing.
 +
Packer set at 5926' and is set in 25K compression and injection string was 4.5 casing 10.5# per ft.
 +
Pressure tested annulus of tubing at 1500 psi with no decline in pressure.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2135932812
 +
| 2015-03-27
 +
|
 +
| Inspection revealed that injection pump to this well was in operation today and it was noted that several vacuum trucks were waiting to unload at the facility on this day of my inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 24762432
 +
| 2014-11-06
 +
|
 +
| On site to pressure test flow line going to wellhead they installed 800' of 8 casing and inserted 800' of 4 casing within it too be used as injection flow line and we pressure tested it at 1520 psi  for 15 minutes with no decline in pressure( TEST Passed).
 +
Note: Owner waiting on Chief's Order for permission to inject fluid at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -272604060
 
| -272604060
 
| 2014-08-18
 
| 2014-08-18
|
+
|  
 
| Inspection revealed that Bill Albert's excavating has moved equipment in on site to build drill site.
 
| Inspection revealed that Bill Albert's excavating has moved equipment in on site to build drill site.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| -9167878
+
| 509015520
| 2014-08-25
+
| 2015-03-05
|
+
|
| On site to witness running of conductor pipe and Universal Well Services cement it in place with 100 sacks of Class A cement and they had good returns and it stayed up good.
+
| Inspection revealed that injection pump was in operation today and it was noted that nine Oilfield Trucking Solutions vacuum trucks were waiting to unload during my inspection.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 594563585
 +
| 2014-09-11
 +
|  
 +
| On site to witness Appalachian Well Survey rebond log well the first log ran by Wildcat Wireline Company was incorrect and owner wanted to verify good cement bond which the new log indicated.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 689543799
 
| 689543799
 
| 2014-08-28
 
| 2014-08-28
|
+
|  
| On site to witness the tail end of the surface casing being cemented in place, Universal Well Service mixed 412 sks. Of Class A cement and they had 8 barrel of good returns and they drilled to 872' with a 14.750" bit and they ran 842' of 11.750" casing.
+
| On site to witness the tail end of the surface casing being cemented in place, Universal Well Service mixed 412 sks. Of Class A cement and they had 8 barrel of good returns and they drilled to 872' with a 14.750 bit and they ran 842' of 11.750 casing.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 723821713
 +
| 2015-02-25
 +
|
 +
| Inspection revealed that injection pump was in operation today and it was noted that several Oilfield Solutions vacuum trucks were waiting to unload there product during my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 744188300
 
| 744188300
 
| 2014-09-02
 
| 2014-09-02
|
+
|  
 
| Inspection of drill site revealed that Wild Cat Drilling was drilling at a depth of 3808' drilling in the bottom section of the Clinton formation and they plan on tripping bit once they drill through the Medina Sand section.
 
| Inspection of drill site revealed that Wild Cat Drilling was drilling at a depth of 3808' drilling in the bottom section of the Clinton formation and they plan on tripping bit once they drill through the Medina Sand section.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -810623122
 +
| 2014-09-03
 +
|
 +
| Wildcat Drilling on site and they were at a depth of 4490' today and they plan on tripping bit again at the Trenton limestone top.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -9167878
 +
| 2014-08-25
 +
|
 +
| On site to witness running of conductor pipe and Universal Well Services cement it in place with 100 sacks of Class A cement and they had good returns and it stayed up good.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 926802871
 +
| 2015-02-13
 +
|
 +
| Inspection revealed that injection pump was in operation today and it was noted that twenty vacuum trucks were waiting to unload at the facility during my inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -986734240
 +
| 2015-01-02
 +
|
 +
| Inspection revealed that well is not in use at this time it is fully capable of injection but owner drilled this well as a backup to be used only if one of the other wells on lease goes down for repair.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:33, 14 July 2015

Well Details

Well ID: 34-031-27241
Loading map...
County: Coshocton
Municipality:
Operator Name: BUCKEYE BRINE LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-08-25
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 40.30214978
Longitude: -81.85090484

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1994-0 0.0 373.0
1996-0 0.0 392.0
1997-0 0.0 239.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1410214007 2014-09-07 On site to witness placement of float equipment on casing and to witness cementing of production casing on SWIW well.

Note: Hole size was 10.625 drilled to a depth of 6056' and they ran 6015' of 8.625 casing and it was cemented to surface cementing details of casing ticket.

1410214978 2014-09-08 Inspection revealed that Wildcat Drilling had to wash in casing to setting depth and they were stuck a couple of times and once they got casing in hole we circulated two bottoms up prior to letting Universal Well Services cement pipe in place.
1413759848 2014-10-17 Inspection revealed that well is not in operation at this time owner is still constructing flow line to well head and seismic monitoring is being performed.
1421354103 2015-01-15 On site to witness owner shut down the number one well and start up the number three well and we monitored pressures while injecting fluids and it was noted that several Elite Oilfield Services vacuum trucks were waiting to unload at the facility during my inspection.
-1555770320 2015-04-07 Inspection revealed that injection pump was in operation today and operator stated that they are receiving approximately 150 loads of brine per day so far this month.
-1783085157 2014-11-06 Restoration work at the site has been completed well site has been restored and vegetation has begun to grow.
-183072802 2015-03-12 Inspection on this day revealed that injection pump was in operation and it was noted that several vacuum trucks/tankers were waiting to unload at the facility.
-191659703 2014-09-10 Inspection revealed that Wildcat Wireline services were on site to bond log 8.625 casing and they had trouble with there electronics and owner had to arrange to find another logging company to log the well.
-1924306550 2014-08-11 On site with company reps to discuss upcoming drilling project.
-1977663657 2015-06-09 Inspection revealed that injection pump to this well was in operation on the day of my inspection.
-2104084835 2014-09-15 On site to witness tubing&packer run into well and once in place pressure test annulus of tubing.

Packer set at 5926' and is set in 25K compression and injection string was 4.5 casing 10.5# per ft. Pressure tested annulus of tubing at 1500 psi with no decline in pressure.

2135932812 2015-03-27 Inspection revealed that injection pump to this well was in operation today and it was noted that several vacuum trucks were waiting to unload at the facility on this day of my inspection.
24762432 2014-11-06 On site to pressure test flow line going to wellhead they installed 800' of 8 casing and inserted 800' of 4 casing within it too be used as injection flow line and we pressure tested it at 1520 psi for 15 minutes with no decline in pressure( TEST Passed).

Note: Owner waiting on Chief's Order for permission to inject fluid at this time.

-272604060 2014-08-18 Inspection revealed that Bill Albert's excavating has moved equipment in on site to build drill site.
509015520 2015-03-05 Inspection revealed that injection pump was in operation today and it was noted that nine Oilfield Trucking Solutions vacuum trucks were waiting to unload during my inspection.
594563585 2014-09-11 On site to witness Appalachian Well Survey rebond log well the first log ran by Wildcat Wireline Company was incorrect and owner wanted to verify good cement bond which the new log indicated.
689543799 2014-08-28 On site to witness the tail end of the surface casing being cemented in place, Universal Well Service mixed 412 sks. Of Class A cement and they had 8 barrel of good returns and they drilled to 872' with a 14.750 bit and they ran 842' of 11.750 casing.
723821713 2015-02-25 Inspection revealed that injection pump was in operation today and it was noted that several Oilfield Solutions vacuum trucks were waiting to unload there product during my inspection.
744188300 2014-09-02 Inspection of drill site revealed that Wild Cat Drilling was drilling at a depth of 3808' drilling in the bottom section of the Clinton formation and they plan on tripping bit once they drill through the Medina Sand section.
-810623122 2014-09-03 Wildcat Drilling on site and they were at a depth of 4490' today and they plan on tripping bit again at the Trenton limestone top.
-9167878 2014-08-25 On site to witness running of conductor pipe and Universal Well Services cement it in place with 100 sacks of Class A cement and they had good returns and it stayed up good.
926802871 2015-02-13 Inspection revealed that injection pump was in operation today and it was noted that twenty vacuum trucks were waiting to unload at the facility during my inspection.
-986734240 2015-01-02 Inspection revealed that well is not in use at this time it is fully capable of injection but owner drilled this well as a backup to be used only if one of the other wells on lease goes down for repair.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.