X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-067-21106"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-067-21106
 
| Well ID: 34-067-21106
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.2584248491, -81.2144381912 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.25842485, -81.21443819 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Harrison County, Ohio|Harrison]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-03-10
 
| Spud Date: 2013-03-10
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.2584248491
+
| Latitude: 40.25842485
 
|-
 
|-
| Longitude: -81.2144381912
+
| Longitude: -81.21443819
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 77752.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 11232.0
 +
|
 +
|-
 +
|-
 +
| 2013-9
 +
| style="text-align:right;" | 84672.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 20770.0
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 68838.0
 +
| style="text-align:right;" | 86.0
 +
|
 +
|
 +
| style="text-align:right;" | 7827.0
 +
| style="text-align:right;" | 86.0
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 44186.0
 +
| style="text-align:right;" | 79.0
 +
|
 +
|
 +
| style="text-align:right;" | 1790.0
 +
| style="text-align:right;" | 79.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 71890.0
 +
| style="text-align:right;" | 89.0
 +
|
 +
|
 +
| style="text-align:right;" | 5028.0
 +
| style="text-align:right;" | 89.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 21423.0
 +
| style="text-align:right;" | 91.0
 +
|
 +
|
 +
| style="text-align:right;" | 4698.0
 +
| style="text-align:right;" | 91.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 16561.0
 +
| style="text-align:right;" | 88.0
 +
|
 +
|
 +
| style="text-align:right;" | 7651.0
 +
| style="text-align:right;" | 88.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 121:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -131582478
 
| -131582478
 
| 2013-09-30
 
| 2013-09-30
|
+
|  
 
| On the day of my inspection the well was in production and the site passed preliminary restoration according to 1509.072A.
 
| On the day of my inspection the well was in production and the site passed preliminary restoration according to 1509.072A.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -360689250
 
| 2013-04-01
 
|
 
| Met with Deputy Chief Bob Worstall and Supervisor Rocky King on site. Review drilling and producing on the pad. Next review the 50 bbl drip tank set up to see if the spacing needs to be changed. It appears to be far enough away from the compressors on this location not to be  a problem.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1362798367
 
| 1362798367
 
| 2013-03-08
 
| 2013-03-08
|
+
|  
| I am on site today to witness the running and the cementing of the 18-5/8" inch diameter casing string. Patterson Drilling Rig # 480 drilled a 24" inch diameter hole to 440 ft and then set 427 ft of casing. Patterson Drilling could not get casing to bottom and it became clear I could not witness the casing cement job and stay within the time constraint.
+
| I am on site today to witness the running and the cementing of the 18-5/8 inch diameter casing string. Patterson Drilling Rig # 480 drilled a 24 inch diameter hole to 440 ft and then set 427 ft of casing. Patterson Drilling could not get casing to bottom and it became clear I could not witness the casing cement job and stay within the time constraint.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1379512208
 
| 1379512208
 
| 2013-09-18
 
| 2013-09-18
|
+
|  
 
| I am on site today to check the well pad and outside for low vegetation. I found most of the pad and just off the pad has good vegetaion. There is a large pile of soil with pit liner mixed in it on site.
 
| I am on site today to check the well pad and outside for low vegetation. I found most of the pad and just off the pad has good vegetaion. There is a large pile of soil with pit liner mixed in it on site.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -360689250
 +
| 2013-04-01
 +
|
 +
| Met with Deputy Chief Bob Worstall and Supervisor Rocky King on site. Review drilling and producing on the pad. Next review the 50 bbl drip tank set up to see if the spacing needs to be changed. It appears to be far enough away from the compressors on this location not to be  a problem.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 845222540
 
| 845222540
 
| 2013-03-12
 
| 2013-03-12
|
+
|  
| Patterson  rig # 480 ran 1695' of 13-3/8" 54.5# R-3 casing.  Stingray Cementing Services cemented the string from top to bottom with 1364 sx of Class A cement.  There were good cement returns to surface.  See the casing ticket for details.
+
| Patterson  rig # 480 ran 1695' of 13-3/8 54.5# R-3 casing.  Stingray Cementing Services cemented the string from top to bottom with 1364 sx of Class A cement.  There were good cement returns to surface.  See the casing ticket for details.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 16:04, 14 July 2015

Well Details

Well ID: 34-067-21106
Loading map...
County: Harrison
Municipality:
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-03-10
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.25842485
Longitude: -81.21443819

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 77752.0 11232.0
2013-9 84672.0 20770.0
2014-1 68838.0 86.0 7827.0 86.0
2014-3 44186.0 79.0 1790.0 79.0
2014-2 71890.0 89.0 5028.0 89.0
2014-4 21423.0 91.0 4698.0 91.0
2015-1 16561.0 88.0 7651.0 88.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-131582478 2013-09-30 On the day of my inspection the well was in production and the site passed preliminary restoration according to 1509.072A.
1362798367 2013-03-08 I am on site today to witness the running and the cementing of the 18-5/8 inch diameter casing string. Patterson Drilling Rig # 480 drilled a 24 inch diameter hole to 440 ft and then set 427 ft of casing. Patterson Drilling could not get casing to bottom and it became clear I could not witness the casing cement job and stay within the time constraint.
1379512208 2013-09-18 I am on site today to check the well pad and outside for low vegetation. I found most of the pad and just off the pad has good vegetaion. There is a large pile of soil with pit liner mixed in it on site.
-360689250 2013-04-01 Met with Deputy Chief Bob Worstall and Supervisor Rocky King on site. Review drilling and producing on the pad. Next review the 50 bbl drip tank set up to see if the spacing needs to be changed. It appears to be far enough away from the compressors on this location not to be a problem.
845222540 2013-03-12 Patterson rig # 480 ran 1695' of 13-3/8 54.5# R-3 casing. Stingray Cementing Services cemented the string from top to bottom with 1364 sx of Class A cement. There were good cement returns to surface. See the casing ticket for details.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.