If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-103-25047 | | Well ID: 34-103-25047 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.02880002, -81.87222423 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Medina County, Ohio|Medina]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[BLEACH TECH LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-02-22 | | Spud Date: 2014-02-22 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Active Injection |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.02880002 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.87222423 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1028310105 | | -1028310105 | ||
| 2014-04-03 | | 2014-04-03 | ||
− | | | + | | |
− | | Visited location on 04/03/2014 to witness logging job on the Bleachtech #13 well. The hole was loaded on 04/02/2014 with pit water (note: drilling operations had been completed the previous week, so solids in pit had settled out and water was taken from top of pit). Appalachian Well Services rigged up and logged the well. The cement bond on the 8 5/8 | + | | Visited location on 04/03/2014 to witness logging job on the Bleachtech #13 well. The hole was loaded on 04/02/2014 with pit water (note: drilling operations had been completed the previous week, so solids in pit had settled out and water was taken from top of pit). Appalachian Well Services rigged up and logged the well. The cement bond on the 8 5/8 casing looked excellent throughout the entire length of the string. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1033963541 | ||
+ | | 2014-10-23 | ||
+ | | | ||
+ | | Visited location on 10/23/2014 to check on the restoration status of the well. The well is equipped for production; well identification is clearly displayed next to the wellhead. All pits have been closed and drilling equipment removed. Preliminary Restoration passes. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 150558545 | ||
+ | | 2014-02-25 | ||
+ | | | ||
+ | | Visited location on 02/25/2014 for surface casing cement job. Rig drilled a 14 3/4 hole to 660', and ran 631' of 11 3/4, 32# surface casing with a collar on the bottom and 2 centralizers. Rigged up Petroset for cement job. Cement job went well; got 8 bbls good cement returns to surface. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -1721455863 | | -1721455863 | ||
| 2014-04-10 | | 2014-04-10 | ||
− | | | + | | |
| Visited location on 04/10/2014. Crew was working to harden pit for Bleachtech #14 and #13 wells with fly ash from Chem Tech. No problems were noted at the time. | | Visited location on 04/10/2014. Crew was working to harden pit for Bleachtech #14 and #13 wells with fly ash from Chem Tech. No problems were noted at the time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -1751501323 | | -1751501323 | ||
| 2014-02-22 | | 2014-02-22 | ||
− | | | + | | |
− | | Visited rig on 02/22/2014 for conductor casing cement job. Rig drilled 20 | + | | Visited rig on 02/22/2014 for conductor casing cement job. Rig drilled 20 hole to 178' on freshwater mud. 4 joints of 16, 65# conductor casing was run to 161'. Rigged up Petroset to cement well to surface. Cement job went well; got 14 bbls good cement returns to surface. Plan forward is to wait on cement. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -1946409363 | | -1946409363 | ||
| 2014-02-26 | | 2014-02-26 | ||
− | | | + | | |
| Visited rig to check on status of drilling operations. At the tim eof the inspection, rig was drilling ahead at 1,488'. | | Visited rig to check on status of drilling operations. At the tim eof the inspection, rig was drilling ahead at 1,488'. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 840077672 | | 840077672 | ||
| 2014-03-02 | | 2014-03-02 | ||
− | | | + | | |
− | | Visited location on 03/02/2014 for production casing cement job. Rig drilled 11 | + | | Visited location on 03/02/2014 for production casing cement job. Rig drilled 11 hole to 2,427' and ran 2,388' of 8 5/8, 32# production casing. Rigged up Petroset for cement job. Cement job went well; 380 bbls good cement returns to surface. Performed MIT test after cement job. Pressured up well to 1150 psi for 15 minutes. No noticeable pressure lost during test; test passed. Plan forward is to wait on cement, and then drill-out to TD. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-103-25047 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02880002,"lon":-81.87222423,"icon":""}]} |
County: Medina | |
Municipality: | |
Operator Name: BLEACH TECH LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-02-22 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 41.02880002 | |
Longitude: -81.87222423 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1028310105 | 2014-04-03 | Visited location on 04/03/2014 to witness logging job on the Bleachtech #13 well. The hole was loaded on 04/02/2014 with pit water (note: drilling operations had been completed the previous week, so solids in pit had settled out and water was taken from top of pit). Appalachian Well Services rigged up and logged the well. The cement bond on the 8 5/8 casing looked excellent throughout the entire length of the string. | ||||
-1033963541 | 2014-10-23 | Visited location on 10/23/2014 to check on the restoration status of the well. The well is equipped for production; well identification is clearly displayed next to the wellhead. All pits have been closed and drilling equipment removed. Preliminary Restoration passes. | ||||
150558545 | 2014-02-25 | Visited location on 02/25/2014 for surface casing cement job. Rig drilled a 14 3/4 hole to 660', and ran 631' of 11 3/4, 32# surface casing with a collar on the bottom and 2 centralizers. Rigged up Petroset for cement job. Cement job went well; got 8 bbls good cement returns to surface. | ||||
-1721455863 | 2014-04-10 | Visited location on 04/10/2014. Crew was working to harden pit for Bleachtech #14 and #13 wells with fly ash from Chem Tech. No problems were noted at the time. | ||||
-1751501323 | 2014-02-22 | Visited rig on 02/22/2014 for conductor casing cement job. Rig drilled 20 hole to 178' on freshwater mud. 4 joints of 16, 65# conductor casing was run to 161'. Rigged up Petroset to cement well to surface. Cement job went well; got 14 bbls good cement returns to surface. Plan forward is to wait on cement. | ||||
-1946409363 | 2014-02-26 | Visited rig to check on status of drilling operations. At the tim eof the inspection, rig was drilling ahead at 1,488'. | ||||
840077672 | 2014-03-02 | Visited location on 03/02/2014 for production casing cement job. Rig drilled 11 hole to 2,427' and ran 2,388' of 8 5/8, 32# production casing. Rigged up Petroset for cement job. Cement job went well; 380 bbls good cement returns to surface. Performed MIT test after cement job. Pressured up well to 1150 psi for 15 minutes. No noticeable pressure lost during test; test passed. Plan forward is to wait on cement, and then drill-out to TD. |
For data sources see[1]