Difference between revisions of "34-067-21091"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-067-21091
 
| Well ID: 34-067-21091
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.4026528276, -81.1284784185 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.40265557, -81.12847836 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Harrison County, Ohio|Harrison]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[ATLAS NOBLE LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date:  
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing:
+
| Well Status: Producing
 
|-
 
|-
| Violations: 1
+
| Violations: 0
 
|-
 
|-
| Latitude: 40.4026528276
+
| Latitude: 40.40265557
 
|-
 
|-
| Longitude: -81.1284784185
+
| Longitude: -81.12847836
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 24830.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 8974.0
 +
|
 +
|-
 +
|-
 +
| 2013-9
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 37497.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 5165.0
 +
| style="text-align:right;" | 90.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 34840.0
 +
| style="text-align:right;" | 91.0
 +
|
 +
|
 +
| style="text-align:right;" | 6979.0
 +
| style="text-align:right;" | 91.0
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 31414.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 5300.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 26076.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 4732.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 23609.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 3777.0
 +
| style="text-align:right;" | 90.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 121:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -793470147
 
| 2013-07-18
 
|
 
| I am on site today training with Mark Moreland and witnessed that there is a back hoe and front end loader skimming off the contaminated area. Pulled off 8 - 10" of rock and they are down to the compacted soil. Contaminated fluid is laying on top of the compacted soil. Met with Lisa Raffle Regulatory Compliance Specialist for Atlas Resources and Aaron Peterson Geo technician for Moody and Associates. One roll off box has been removed and with calculations one more will clean up contamination. Moody and Associates are taking samples and will forward results to our Cambridge Lab.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1349738378
 
| 1349738378
 
| 2012-10-01
 
| 2012-10-01
|
+
|  
 
| I am on site today to witness the cementing of the 24 inch conductor. Lightning Well Service and Petroset Cementing set 100 ft of conductor and c/w 80 sks. Had good returns to surface.
 
| I am on site today to witness the cementing of the 24 inch conductor. Lightning Well Service and Petroset Cementing set 100 ft of conductor and c/w 80 sks. Had good returns to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1352046276
 
| 1352046276
 
| 2012-11-03
 
| 2012-11-03
|
+
|  
 
| I am on site today to witness the running and the cementing of the 18 5/8 surface casing string. H & P rig 285  will run 350 ft of casing in a 22 inch hole drilled to 365 ft. After several hours of working casing up and down it was determined that the casing should be pulled out of the hole to condition the well. I did not witness the cementing on this inspection.
 
| I am on site today to witness the running and the cementing of the 18 5/8 surface casing string. H & P rig 285  will run 350 ft of casing in a 22 inch hole drilled to 365 ft. After several hours of working casing up and down it was determined that the casing should be pulled out of the hole to condition the well. I did not witness the cementing on this inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1352047508
 
| 1352047508
 
| 2012-11-02
 
| 2012-11-02
|
+
|  
 
| I arrived on site tonight to witness the running and cementing of the 18 5/8 surface casing string. H & P Rig #285  will set 350 ft of casing. They have drilled a 22 inch hole to 365 ft . After several hours of watching the rig work casing it was determined that the casing would not be on bottom for some time. They are to contact me when the casing is on bottom.
 
| I arrived on site tonight to witness the running and cementing of the 18 5/8 surface casing string. H & P Rig #285  will set 350 ft of casing. They have drilled a 22 inch hole to 365 ft . After several hours of watching the rig work casing it was determined that the casing would not be on bottom for some time. They are to contact me when the casing is on bottom.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1374153132
 
| 1374153132
 
| 2013-07-17
 
| 2013-07-17
|
+
|  
 
| I am on site today training with Mark Moreland and witnessed that there was a spill of 50bbls of fluid stored on location on the South East portion of the pad. Met with Atlas Resources Environmental Specialist Doug Wilson and Regional Compliance Specialist Kirk Elkin they advised us that the chloride range was 2100ppm. Equipment would be on site tomorrow to excavate spill area. We will be using quantabs and visual to assure area is cleaned up.
 
| I am on site today training with Mark Moreland and witnessed that there was a spill of 50bbls of fluid stored on location on the South East portion of the pad. Met with Atlas Resources Environmental Specialist Doug Wilson and Regional Compliance Specialist Kirk Elkin they advised us that the chloride range was 2100ppm. Equipment would be on site tomorrow to excavate spill area. We will be using quantabs and visual to assure area is cleaned up.
|
+
|  
| 9-1-07
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1375715367
 
| 1375715367
 
| 2013-08-05
 
| 2013-08-05
|
+
|  
 
| I am on site today and witnessed that the spill area was cleaned up, both roll off boxes were removed and vegetation around area was green. Tank battery construction was underway. Well head pressure was at 1600psi.
 
| I am on site today and witnessed that the spill area was cleaned up, both roll off boxes were removed and vegetation around area was green. Tank battery construction was underway. Well head pressure was at 1600psi.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1375796908
 
| 1375796908
 
| 2013-08-05
 
| 2013-08-05
|
+
|  
 
| Today I am on site to check on the clean up of the contaminated soil which filled two roll off containers. I found that the containers have been removed and that nothing has been put back in the area removed. Inspector Bennett was on site and I reviewed the clean up effort with him.
 
| Today I am on site to check on the clean up of the contaminated soil which filled two roll off containers. I found that the containers have been removed and that nothing has been put back in the area removed. Inspector Bennett was on site and I reviewed the clean up effort with him.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1391237237
 
| 1391237237
 
| 2012-11-04
 
| 2012-11-04
|
+
|  
 
| I am on site again today to witness the running and cementing of the 18 5/8 surface casing string. The H & P rig # 285 could only get 306 ft of casing to go in the 22 inch hole. They have drilled to 365 ft  and had planned to set 350 ft of casing but were not able to get all of the casing in the well. The permit  requires 300 ft for a minimum. Nabors Cement Service is on site to cement the casing.
 
| I am on site again today to witness the running and cementing of the 18 5/8 surface casing string. The H & P rig # 285 could only get 306 ft of casing to go in the 22 inch hole. They have drilled to 365 ft  and had planned to set 350 ft of casing but were not able to get all of the casing in the well. The permit  requires 300 ft for a minimum. Nabors Cement Service is on site to cement the casing.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -793470147
 +
| 2013-07-18
 +
|
 +
| I am on site today training with Mark Moreland and witnessed that there is a back hoe and front end loader skimming off the contaminated area. Pulled off 8 - 10 of rock and they are down to the compacted soil. Contaminated fluid is laying on top of the compacted soil. Met with Lisa Raffle Regulatory Compliance Specialist for Atlas Resources and Aaron Peterson Geo technician for Moody and Associates. One roll off box has been removed and with calculations one more will clean up contamination. Moody and Associates are taking samples and will forward results to our Cambridge Lab.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 18:14, 14 July 2015

Well Details

Well ID: 34-067-21091
Loading map...
County: Harrison
Municipality:
Operator Name: ATLAS NOBLE LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.40265557
Longitude: -81.12847836

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 24830.0 8974.0
2013-9 0.0 0.0
2014-1 37497.0 90.0 5165.0 90.0
2014-2 34840.0 91.0 6979.0 91.0
2014-3 31414.0 92.0 5300.0 92.0
2014-4 26076.0 92.0 4732.0 92.0
2015-1 23609.0 90.0 3777.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1349738378 2012-10-01 I am on site today to witness the cementing of the 24 inch conductor. Lightning Well Service and Petroset Cementing set 100 ft of conductor and c/w 80 sks. Had good returns to surface.
1352046276 2012-11-03 I am on site today to witness the running and the cementing of the 18 5/8 surface casing string. H & P rig 285 will run 350 ft of casing in a 22 inch hole drilled to 365 ft. After several hours of working casing up and down it was determined that the casing should be pulled out of the hole to condition the well. I did not witness the cementing on this inspection.
1352047508 2012-11-02 I arrived on site tonight to witness the running and cementing of the 18 5/8 surface casing string. H & P Rig #285 will set 350 ft of casing. They have drilled a 22 inch hole to 365 ft . After several hours of watching the rig work casing it was determined that the casing would not be on bottom for some time. They are to contact me when the casing is on bottom.
1374153132 2013-07-17 I am on site today training with Mark Moreland and witnessed that there was a spill of 50bbls of fluid stored on location on the South East portion of the pad. Met with Atlas Resources Environmental Specialist Doug Wilson and Regional Compliance Specialist Kirk Elkin they advised us that the chloride range was 2100ppm. Equipment would be on site tomorrow to excavate spill area. We will be using quantabs and visual to assure area is cleaned up.
1375715367 2013-08-05 I am on site today and witnessed that the spill area was cleaned up, both roll off boxes were removed and vegetation around area was green. Tank battery construction was underway. Well head pressure was at 1600psi.
1375796908 2013-08-05 Today I am on site to check on the clean up of the contaminated soil which filled two roll off containers. I found that the containers have been removed and that nothing has been put back in the area removed. Inspector Bennett was on site and I reviewed the clean up effort with him.
1391237237 2012-11-04 I am on site again today to witness the running and cementing of the 18 5/8 surface casing string. The H & P rig # 285 could only get 306 ft of casing to go in the 22 inch hole. They have drilled to 365 ft and had planned to set 350 ft of casing but were not able to get all of the casing in the well. The permit requires 300 ft for a minimum. Nabors Cement Service is on site to cement the casing.
-793470147 2013-07-18 I am on site today training with Mark Moreland and witnessed that there is a back hoe and front end loader skimming off the contaminated area. Pulled off 8 - 10 of rock and they are down to the compacted soil. Contaminated fluid is laying on top of the compacted soil. Met with Lisa Raffle Regulatory Compliance Specialist for Atlas Resources and Aaron Peterson Geo technician for Moody and Associates. One roll off box has been removed and with calculations one more will clean up contamination. Moody and Associates are taking samples and will forward results to our Cambridge Lab.

For data sources see[2]