If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-059-24328 | | Well ID: 34-059-24328 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.99750712, -81.33191083 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Guernsey County, Ohio|Guernsey]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[ECLIPSE RESOURCES I LP]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-01-12 | | Spud Date: 2014-01-12 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.99750712 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.33191083 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 61507.0 | ||
+ | | style="text-align:right;" | 35.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 6677.0 | ||
+ | | style="text-align:right;" | 35.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 192364.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 22759.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 76: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | 131778323 | ||
+ | | 2015-03-02 | ||
+ | | | ||
+ | | On the day of my inspection I witnessed that the well was equipped with Sweco wellheads and production trees. The production equipment included a sand trap, a GP unit and 2 400bbl purge tanks. Fluids are separated at the GP unit and then transferred to the Hayes CGF. Tubing and Casing pressure was at 2600psi with the intermediate and surface casing at 0psi. The site passed preliminary restoration according to ORC 1509.072A. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -1333989705 | | -1333989705 | ||
| 2014-03-04 | | 2014-03-04 | ||
− | | | + | | |
| On the day of my inspection, I witnessed Schlumberger break circulation with fresh water, then mix and displace 462.0 sacks of Class A cement with a weight of 15.6 and a yield of 1.20, 135 barrels of fresh water was used for displacement, I witnessed 22 barrels of cement back to surface. | | On the day of my inspection, I witnessed Schlumberger break circulation with fresh water, then mix and displace 462.0 sacks of Class A cement with a weight of 15.6 and a yield of 1.20, 135 barrels of fresh water was used for displacement, I witnessed 22 barrels of cement back to surface. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1394024782 | | 1394024782 | ||
| 2014-03-04 | | 2014-03-04 | ||
− | | | + | | |
| On the day of my inspection, I witnessed Alpha Hunter Rig #9 and crew attempt to run the last joint of 8.625' surface casing in the well bore, the casing was hung at 455' due to the red rock, Schlumberger circulated the hole with fresh water while trying to wash the pipe in, the minimum requirement to be set by the state was 300', A decision was made to cement the surface casing at 455'. | | On the day of my inspection, I witnessed Alpha Hunter Rig #9 and crew attempt to run the last joint of 8.625' surface casing in the well bore, the casing was hung at 455' due to the red rock, Schlumberger circulated the hole with fresh water while trying to wash the pipe in, the minimum requirement to be set by the state was 300', A decision was made to cement the surface casing at 455'. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-059-24328 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.99750712,"lon":-81.33191083,"icon":""}]} |
County: Guernsey | |
Municipality: | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-01-12 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.99750712 | |
Longitude: -81.33191083 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-4 | 61507.0 | 35.0 | 6677.0 | 35.0 | ||
2015-1 | 192364.0 | 90.0 | 22759.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
131778323 | 2015-03-02 | On the day of my inspection I witnessed that the well was equipped with Sweco wellheads and production trees. The production equipment included a sand trap, a GP unit and 2 400bbl purge tanks. Fluids are separated at the GP unit and then transferred to the Hayes CGF. Tubing and Casing pressure was at 2600psi with the intermediate and surface casing at 0psi. The site passed preliminary restoration according to ORC 1509.072A. | ||||
-1333989705 | 2014-03-04 | On the day of my inspection, I witnessed Schlumberger break circulation with fresh water, then mix and displace 462.0 sacks of Class A cement with a weight of 15.6 and a yield of 1.20, 135 barrels of fresh water was used for displacement, I witnessed 22 barrels of cement back to surface. | ||||
1394024782 | 2014-03-04 | On the day of my inspection, I witnessed Alpha Hunter Rig #9 and crew attempt to run the last joint of 8.625' surface casing in the well bore, the casing was hung at 455' due to the red rock, Schlumberger circulated the hole with fresh water while trying to wash the pipe in, the minimum requirement to be set by the state was 300', A decision was made to cement the surface casing at 455'. |
For data sources see[2]