If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-117-24258 | | Well ID: 34-117-24258 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.50079829, -82.82040421 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Morrow County, Ohio|Morrow]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[HOUGHTON INVESTMENTS, L.L.C.]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-06-23 | | Spud Date: 2014-06-23 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Plugged and Abandoned |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.50079829 |
|- | |- | ||
− | | Longitude: -82. | + | | Longitude: -82.82040421 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | 1072330192 | ||
+ | | 2014-06-23 | ||
+ | | | ||
+ | | Inspect Mullins Energy services brine truck delivering freshwater for the drilling of the surface hole. UIC and other identification clearly and properly marked. Status: ok. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1188248900 | ||
+ | | 2014-07-18 | ||
+ | | | ||
+ | | Received verbal notification of the operators intend to plug and abandon the Howell-Meimer Unit #1 using Coshocton Pipe service rig. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -125238646 | | -125238646 | ||
| 2014-07-10 | | 2014-07-10 | ||
− | | | + | | |
| With Eric Daugstrup. New drilled well. See Eric's report this date for details. | | With Eric Daugstrup. New drilled well. See Eric's report this date for details. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -1396172471 | | -1396172471 | ||
| 2014-07-02 | | 2014-07-02 | ||
− | | | + | | |
| G & L drilling reached total depth on the intermediate hole at 1500 foot on soap. Ran 35 joints of 17 pound new 7 inch casing with three centralizers and a guide shoe on bottom. Note: ran left handed back off collar at 886'. Formation Cementing hooked up and displaced 81 sacks of 60/40 POZ cement. Plug down 2:45 pm. | | G & L drilling reached total depth on the intermediate hole at 1500 foot on soap. Ran 35 joints of 17 pound new 7 inch casing with three centralizers and a guide shoe on bottom. Note: ran left handed back off collar at 886'. Formation Cementing hooked up and displaced 81 sacks of 60/40 POZ cement. Plug down 2:45 pm. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 1402331141 |
− | | 2014- | + | | 2014-06-09 |
− | | | + | | |
− | | | + | | Drill new well permit received for the Howell-Meimer Unit #1 (#4258): Issued 6/3/2014 Expires 6/2/2016. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 1402924999 |
− | | 2014-06- | + | | 2014-06-16 |
− | | | + | | |
− | | | + | | The entranced to the Howell-Meimer Unit #1 has been built by the operator and a dozer is on location. Road culvert installed and stone graded into current bean field off State Route 61. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 1403024589 |
− | | 2014- | + | | 2014-06-17 |
− | | | + | | |
− | | | + | | G & L Drilling has started moving drilling equipment in with Mullins Energy Services building location. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403117148 | | 1403117148 | ||
| 2014-06-18 | | 2014-06-18 | ||
− | | | + | | |
| Mullins Energy Services has finished cutting location and stockpiled the topsoil on the south side of the location. G & L drilling has delivered drill collars and drilling mud. | | Mullins Energy Services has finished cutting location and stockpiled the topsoil on the south side of the location. G & L drilling has delivered drill collars and drilling mud. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403182949 | | 1403182949 | ||
| 2014-06-19 | | 2014-06-19 | ||
− | | | + | | |
| G & L Drilling has delivered additional tubs of equipment and a water tank to the location. Drilling rig scheduled for 6/20/2014. | | G & L Drilling has delivered additional tubs of equipment and a water tank to the location. Drilling rig scheduled for 6/20/2014. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403269351 | | 1403269351 | ||
| 2014-06-20 | | 2014-06-20 | ||
− | | | + | | |
| G & L Drilling has moved its RD-20 drilling rig onto location. | | G & L Drilling has moved its RD-20 drilling rig onto location. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403530822 | | 1403530822 | ||
| 2014-06-23 | | 2014-06-23 | ||
− | | | + | | |
| G & L Drilling has begun digging the mud pit and finished rigged up. | | G & L Drilling has begun digging the mud pit and finished rigged up. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403615223 | | 1403615223 | ||
| 2014-06-24 | | 2014-06-24 | ||
− | | | + | | |
− | | G & L Drilling #3 spud the Howell-Meimer Unit #1 with new Varel 12.25 | + | | G & L Drilling #3 spud the Howell-Meimer Unit #1 with new Varel 12.25 bit at 5:00 am on fresh water mud. 9:30 am drilling ahead at 61'. Fluid pit and cellar completely lined and watertight. Valid drilling permit and conditions properly displayed. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403708300 | | 1403708300 | ||
| 2014-06-25 | | 2014-06-25 | ||
− | | | + | | |
| G & L Drilling shut down due to mud pump failure, currently at 189 feet. Waiting on repairs. | | G & L Drilling shut down due to mud pump failure, currently at 189 feet. Waiting on repairs. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403796285 | | 1403796285 | ||
| 2014-06-26 | | 2014-06-26 | ||
− | | | + | | |
| Shut down waiting on repairs. | | Shut down waiting on repairs. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403881322 | | 1403881322 | ||
| 2014-06-27 | | 2014-06-27 | ||
− | | | + | | |
| G & L ran 11 joints of new 9.625 inch, 29 pound AT-50 with three centralizers (evenly spaced) and a guide shoe on bottom. 8:00 am Formation Cementing hooked-up and displaced 28.5 barrels of lost circulation material ahead of 190 sacks of class A cement (100% excess) plug down 8:40 am with 6 barrels of returns to surface which held. Formation pressure up casing to 500 pounds with no loss at 5 minutes. Surface casing emplacement and cementing co-witnessed by company representative Mr. Lee Atha. | | G & L ran 11 joints of new 9.625 inch, 29 pound AT-50 with three centralizers (evenly spaced) and a guide shoe on bottom. 8:00 am Formation Cementing hooked-up and displaced 28.5 barrels of lost circulation material ahead of 190 sacks of class A cement (100% excess) plug down 8:40 am with 6 barrels of returns to surface which held. Formation pressure up casing to 500 pounds with no loss at 5 minutes. Surface casing emplacement and cementing co-witnessed by company representative Mr. Lee Atha. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1404136602 | | 1404136602 | ||
| 2014-06-30 | | 2014-06-30 | ||
− | | | + | | |
| G & L Drilling currently shut down. | | G & L Drilling currently shut down. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1404315023 | | 1404315023 | ||
| 2014-07-01 | | 2014-07-01 | ||
− | | | + | | |
− | | 3:15 pm G & L drilling out from surface with 8.875 | + | | 3:15 pm G & L drilling out from surface with 8.875 bit on soap currently at 870 feet. Blow out preventer installed and tested, air pit dug and fully lined. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1404394189 | | 1404394189 | ||
| 2014-07-02 | | 2014-07-02 | ||
− | | | + | | |
− | | G&L Drilling rig 3. Witness cement job of 7 | + | | G&L Drilling rig 3. Witness cement job of 7 casing with Eric Daugstrup. See Eric's reports on details. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1404822980 | | 1404822980 | ||
| 2014-07-07 | | 2014-07-07 | ||
− | | | + | | |
| G & L Drilling Rig #3 drilling out from intermediate string (7 inch) on air at 1890' (3:00 pm). Blow out preventer (BOP) installed, tested and passed. | | G & L Drilling Rig #3 drilling out from intermediate string (7 inch) on air at 1890' (3:00 pm). Blow out preventer (BOP) installed, tested and passed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1404920142 | | 1404920142 | ||
| 2014-07-08 | | 2014-07-08 | ||
− | | | + | | |
| G & L Drilling #3 reached total depth at 3420' on air in the Trempealeau. Appalachian wireline logged well. Status: the operator has released G & L Drilling. Plans to plug and/or produce using a service rig. | | G & L Drilling #3 reached total depth at 3420' on air in the Trempealeau. Appalachian wireline logged well. Status: the operator has released G & L Drilling. Plans to plug and/or produce using a service rig. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1405102588 | | 1405102588 | ||
| 2014-07-11 | | 2014-07-11 | ||
− | | | + | | |
| Location Information for the Howell-Meimer Unit #1 (#4258). ENTRANCE: Lat. 40.49969 Long. -82.81922 / WELL HEAD: Lat. 40.50075 Long. -82.82022 / CENTER-OF-STORAGE: None | | Location Information for the Howell-Meimer Unit #1 (#4258). ENTRANCE: Lat. 40.49969 Long. -82.81922 / WELL HEAD: Lat. 40.50075 Long. -82.82022 / CENTER-OF-STORAGE: None | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1419062512 | | 1419062512 | ||
| 2014-08-04 | | 2014-08-04 | ||
− | | | + | | |
| Coshocton Pipe service rig has moved onto the location to begin plugging operation under the drilling permit. | | Coshocton Pipe service rig has moved onto the location to begin plugging operation under the drilling permit. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1631965940 | | 1631965940 | ||
| 2014-08-05 | | 2014-08-05 | ||
− | | | + | | |
− | | Formation Cementing on location to set bottom two plugs through 2.875 inch tubing inside 6.25 inch openhole. Break circulation and pump bottom plug #1 Trempealeau (3380'-3080'), pull tubing and pump plug #2 Trenton (2784'-2634'). Plugs witnessed by Northwest Regional Supervisor Mr. Will Ziegler. Coshocton Pipe lay down tubing and attempt to back off 7 | + | | Formation Cementing on location to set bottom two plugs through 2.875 inch tubing inside 6.25 inch openhole. Break circulation and pump bottom plug #1 Trempealeau (3380'-3080'), pull tubing and pump plug #2 Trenton (2784'-2634'). Plugs witnessed by Northwest Regional Supervisor Mr. Will Ziegler. Coshocton Pipe lay down tubing and attempt to back off 7 casing at 886'. Unable to back off, shut down for the day. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 26172494 | | 26172494 | ||
| 2014-08-07 | | 2014-08-07 | ||
− | | | + | | |
| On-site to witness Mr. Kenny Smith (welder) cut the casing off 38 inches below ground and weld the identification tag (ODNR #4258) to the top of surface casing. | | On-site to witness Mr. Kenny Smith (welder) cut the casing off 38 inches below ground and weld the identification tag (ODNR #4258) to the top of surface casing. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -441841245 | ||
+ | | 2014-06-27 | ||
+ | | | ||
+ | | G & L Drilling reached total depth on the 12.25 inch surface hole at 374 feet 4:10 am. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -488910043 | ||
+ | | 2014-07-22 | ||
+ | | | ||
+ | | Mullins Energy Services has closed the air pit. The lined fluid pit remains for use during plugging operations. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 635669112 | | 635669112 | ||
| 2014-07-15 | | 2014-07-15 | ||
− | | | + | | |
| G & L Drilling rig #3 has rigged down and is parked at the entrance. All drilling related equipment and debris has been removed from location and the site has been rough graded. The mud and air pits are open. Status: will continue to monitor. | | G & L Drilling rig #3 has rigged down and is parked at the entrance. All drilling related equipment and debris has been removed from location and the site has been rough graded. The mud and air pits are open. Status: will continue to monitor. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -822759820 | ||
+ | | 2014-08-25 | ||
+ | | | ||
+ | | The operator has replaced the top soil and finished grading the entire location. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -842183451 | ||
+ | | 2014-08-06 | ||
+ | | | ||
+ | | Appalachian Well Surveys on location. Unable to unscrew 7 swedge or recover the 7 intermediate casing. Decision made to perforate 7 intermediate casing and squeeze. Mr. Kenny Smith cut off swedge and Appalachian ran in hole and perforated the 7 casing at 700' with 4 shots. 2:30pm Formation Cementing hooked up and broke circulation and displaced (bullhead) 92 sacks class A to squeeze cement plug at oil show at 650'(Big Lime). 3:00pm Coshocton Pipe run in hole with tubing for top of surface casing plug. Formation Cementing hooked up and displaced 62 sacks Class A cement from 200 foot to surface which held. Plugging operation co-witnessed by Houghton Investment representative Mr. Bob Atha. **The Howell-Meimer Unit #1 (#4258) is officially plugged and abandoned. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -886831146 | ||
+ | | 2014-07-03 | ||
+ | | | ||
+ | | G & L drilling rig #3 shut down for the holiday. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-117-24258 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.50079829,"lon":-82.82040421,"icon":""}]} |
County: Morrow | |
Municipality: | |
Operator Name: HOUGHTON INVESTMENTS, L.L.C. | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-06-23 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Plugged and Abandoned | |
Violations: 0 | |
Latitude: 40.50079829 | |
Longitude: -82.82040421 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1072330192 | 2014-06-23 | Inspect Mullins Energy services brine truck delivering freshwater for the drilling of the surface hole. UIC and other identification clearly and properly marked. Status: ok. | ||||
1188248900 | 2014-07-18 | Received verbal notification of the operators intend to plug and abandon the Howell-Meimer Unit #1 using Coshocton Pipe service rig. | ||||
-125238646 | 2014-07-10 | With Eric Daugstrup. New drilled well. See Eric's report this date for details. | ||||
-1396172471 | 2014-07-02 | G & L drilling reached total depth on the intermediate hole at 1500 foot on soap. Ran 35 joints of 17 pound new 7 inch casing with three centralizers and a guide shoe on bottom. Note: ran left handed back off collar at 886'. Formation Cementing hooked up and displaced 81 sacks of 60/40 POZ cement. Plug down 2:45 pm. | ||||
1402331141 | 2014-06-09 | Drill new well permit received for the Howell-Meimer Unit #1 (#4258): Issued 6/3/2014 Expires 6/2/2016. | ||||
1402924999 | 2014-06-16 | The entranced to the Howell-Meimer Unit #1 has been built by the operator and a dozer is on location. Road culvert installed and stone graded into current bean field off State Route 61. | ||||
1403024589 | 2014-06-17 | G & L Drilling has started moving drilling equipment in with Mullins Energy Services building location. | ||||
1403117148 | 2014-06-18 | Mullins Energy Services has finished cutting location and stockpiled the topsoil on the south side of the location. G & L drilling has delivered drill collars and drilling mud. | ||||
1403182949 | 2014-06-19 | G & L Drilling has delivered additional tubs of equipment and a water tank to the location. Drilling rig scheduled for 6/20/2014. | ||||
1403269351 | 2014-06-20 | G & L Drilling has moved its RD-20 drilling rig onto location. | ||||
1403530822 | 2014-06-23 | G & L Drilling has begun digging the mud pit and finished rigged up. | ||||
1403615223 | 2014-06-24 | G & L Drilling #3 spud the Howell-Meimer Unit #1 with new Varel 12.25 bit at 5:00 am on fresh water mud. 9:30 am drilling ahead at 61'. Fluid pit and cellar completely lined and watertight. Valid drilling permit and conditions properly displayed. | ||||
1403708300 | 2014-06-25 | G & L Drilling shut down due to mud pump failure, currently at 189 feet. Waiting on repairs. | ||||
1403796285 | 2014-06-26 | Shut down waiting on repairs. | ||||
1403881322 | 2014-06-27 | G & L ran 11 joints of new 9.625 inch, 29 pound AT-50 with three centralizers (evenly spaced) and a guide shoe on bottom. 8:00 am Formation Cementing hooked-up and displaced 28.5 barrels of lost circulation material ahead of 190 sacks of class A cement (100% excess) plug down 8:40 am with 6 barrels of returns to surface which held. Formation pressure up casing to 500 pounds with no loss at 5 minutes. Surface casing emplacement and cementing co-witnessed by company representative Mr. Lee Atha. | ||||
1404136602 | 2014-06-30 | G & L Drilling currently shut down. | ||||
1404315023 | 2014-07-01 | 3:15 pm G & L drilling out from surface with 8.875 bit on soap currently at 870 feet. Blow out preventer installed and tested, air pit dug and fully lined. | ||||
1404394189 | 2014-07-02 | G&L Drilling rig 3. Witness cement job of 7 casing with Eric Daugstrup. See Eric's reports on details. | ||||
1404822980 | 2014-07-07 | G & L Drilling Rig #3 drilling out from intermediate string (7 inch) on air at 1890' (3:00 pm). Blow out preventer (BOP) installed, tested and passed. | ||||
1404920142 | 2014-07-08 | G & L Drilling #3 reached total depth at 3420' on air in the Trempealeau. Appalachian wireline logged well. Status: the operator has released G & L Drilling. Plans to plug and/or produce using a service rig. | ||||
1405102588 | 2014-07-11 | Location Information for the Howell-Meimer Unit #1 (#4258). ENTRANCE: Lat. 40.49969 Long. -82.81922 / WELL HEAD: Lat. 40.50075 Long. -82.82022 / CENTER-OF-STORAGE: None | ||||
1419062512 | 2014-08-04 | Coshocton Pipe service rig has moved onto the location to begin plugging operation under the drilling permit. | ||||
1631965940 | 2014-08-05 | Formation Cementing on location to set bottom two plugs through 2.875 inch tubing inside 6.25 inch openhole. Break circulation and pump bottom plug #1 Trempealeau (3380'-3080'), pull tubing and pump plug #2 Trenton (2784'-2634'). Plugs witnessed by Northwest Regional Supervisor Mr. Will Ziegler. Coshocton Pipe lay down tubing and attempt to back off 7 casing at 886'. Unable to back off, shut down for the day. | ||||
26172494 | 2014-08-07 | On-site to witness Mr. Kenny Smith (welder) cut the casing off 38 inches below ground and weld the identification tag (ODNR #4258) to the top of surface casing. | ||||
-441841245 | 2014-06-27 | G & L Drilling reached total depth on the 12.25 inch surface hole at 374 feet 4:10 am. | ||||
-488910043 | 2014-07-22 | Mullins Energy Services has closed the air pit. The lined fluid pit remains for use during plugging operations. | ||||
635669112 | 2014-07-15 | G & L Drilling rig #3 has rigged down and is parked at the entrance. All drilling related equipment and debris has been removed from location and the site has been rough graded. The mud and air pits are open. Status: will continue to monitor. | ||||
-822759820 | 2014-08-25 | The operator has replaced the top soil and finished grading the entire location. | ||||
-842183451 | 2014-08-06 | Appalachian Well Surveys on location. Unable to unscrew 7 swedge or recover the 7 intermediate casing. Decision made to perforate 7 intermediate casing and squeeze. Mr. Kenny Smith cut off swedge and Appalachian ran in hole and perforated the 7 casing at 700' with 4 shots. 2:30pm Formation Cementing hooked up and broke circulation and displaced (bullhead) 92 sacks class A to squeeze cement plug at oil show at 650'(Big Lime). 3:00pm Coshocton Pipe run in hole with tubing for top of surface casing plug. Formation Cementing hooked up and displaced 62 sacks Class A cement from 200 foot to surface which held. Plugging operation co-witnessed by Houghton Investment representative Mr. Bob Atha. **The Howell-Meimer Unit #1 (#4258) is officially plugged and abandoned. | ||||
-886831146 | 2014-07-03 | G & L drilling rig #3 shut down for the holiday. |
For data sources see[1]