X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-133-24445"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-133-24445
 
| Well ID: 34-133-24445
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.276386886, -81.0129605653 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.2763801, -81.01307352 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Portage County, Ohio|Portage]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[MOUNTAINEER KEYSTONE LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date: 2013-01-10
+
| Spud Date:  
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Well Drilled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.276386886
+
| Latitude: 41.2763801
 
|-
 
|-
| Longitude: -81.0129605653
+
| Longitude: -81.01307352
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| 1985811433
 
| 1985811433
 
| 2012-12-13
 
| 2012-12-13
|
+
|  
 
| I inspected this location to check the status of site construction and to collect new GPS readings of the well location.  Mountaineer Keystone is in the process of re-permitting the wells on this pad and have re-staked the well locations 30' to the south of the previous locations and have reversed the numbering of the wells.  The entrance and location have been stoned and the topsoil has been placed in a berm around the location and seeded.  Compost filter socks have been staked outside the berms to prevent erosion around drainage areas.  Site construction appears to be complete.  No violations.
 
| I inspected this location to check the status of site construction and to collect new GPS readings of the well location.  Mountaineer Keystone is in the process of re-permitting the wells on this pad and have re-staked the well locations 30' to the south of the previous locations and have reversed the numbering of the wells.  The entrance and location have been stoned and the topsoil has been placed in a berm around the location and seeded.  Compost filter socks have been staked outside the berms to prevent erosion around drainage areas.  Site construction appears to be complete.  No violations.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 73233522
 
| 73233522
 
| 2013-01-08
 
| 2013-01-08
|
+
|  
| I was on location with north region supervisor Tom Hill to inspect the setting of the 20" conductor pipe for this horizontal well.  Ziegenfuss Drilling was driving the casing through the unconsolidated sediments and into the bedrock with an air hammer attached to the bottom of the casing.  The joints were 20' in length and being welded together as required.  Current depth is 60' and there is no annulus so the conductor pipe will not require cementing.  Stallion Construction was spotting housing trailers on location.  No violations.
+
| I was on location with north region supervisor Tom Hill to inspect the setting of the 20 conductor pipe for this horizontal well.  Ziegenfuss Drilling was driving the casing through the unconsolidated sediments and into the bedrock with an air hammer attached to the bottom of the casing.  The joints were 20' in length and being welded together as required.  Current depth is 60' and there is no annulus so the conductor pipe will not require cementing.  Stallion Construction was spotting housing trailers on location.  No violations.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 20:54, 14 July 2015

Well Details

Well ID: 34-133-24445
Loading map...
County: Portage
Municipality:
Operator Name: MOUNTAINEER KEYSTONE LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional: No
Configuration: Vertical
Well Status: Well Drilled
Violations: 0
Latitude: 41.2763801
Longitude: -81.01307352

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1985811433 2012-12-13 I inspected this location to check the status of site construction and to collect new GPS readings of the well location. Mountaineer Keystone is in the process of re-permitting the wells on this pad and have re-staked the well locations 30' to the south of the previous locations and have reversed the numbering of the wells. The entrance and location have been stoned and the topsoil has been placed in a berm around the location and seeded. Compost filter socks have been staked outside the berms to prevent erosion around drainage areas. Site construction appears to be complete. No violations.
73233522 2013-01-08 I was on location with north region supervisor Tom Hill to inspect the setting of the 20 conductor pipe for this horizontal well. Ziegenfuss Drilling was driving the casing through the unconsolidated sediments and into the bedrock with an air hammer attached to the bottom of the casing. The joints were 20' in length and being welded together as required. Current depth is 60' and there is no annulus so the conductor pipe will not require cementing. Stallion Construction was spotting housing trailers on location. No violations.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.