X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-121-24418"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-121-24418
 
| Well ID: 34-121-24418
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.8377751442, -81.3930559638 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.83777514, -81.39305596 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Noble County, Ohio|Noble]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CNX GAS COMPANY LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-05-18
 
| Spud Date: 2013-05-18
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.8377751442
+
| Latitude: 39.83777514
 
|-
 
|-
| Longitude: -81.3930559638
+
| Longitude: -81.39305596
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 9451.0
 +
| style="text-align:right;" | 4.0
 +
|
 +
|
 +
| style="text-align:right;" | 1375.0
 +
| style="text-align:right;" | 4.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 97612.0
 +
| style="text-align:right;" | 30.0
 +
|
 +
|
 +
| style="text-align:right;" | 6240.0
 +
| style="text-align:right;" | 30.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 196932.0
 +
| style="text-align:right;" | 60.0
 +
|
 +
|
 +
| style="text-align:right;" | 7569.0
 +
| style="text-align:right;" | 60.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -1272997038
 
| 2013-07-22
 
|
 
| My inspection today finds the rig crew is running 7150' of 9.625" casing.
 
|
 
|
 
|
 
|-
 
|-
 
| -1665470305
 
| 2013-07-12
 
|
 
| My inspection today finds the operator is drilling the 12.25" section of the well at a depth of 2433'
 
|
 
|
 
|
 
|-
 
|-
 
| -417719886
 
| 2013-05-30
 
|
 
| My inspection today finds Enviro-spud has drilled to a depth of 249'.  The rig is currently broke down.
 
|
 
|
 
|
 
|-
 
|-
 
| -912656021
 
| 2013-07-23
 
|
 
| I am onsite to witness the cementing of the first stage of the 9.625" casing.  Calfrac circulated 978 sks of 15.5# cement into place.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1102375915
 
| 1102375915
 
| 2013-07-01
 
| 2013-07-01
|
+
|  
| My inspection today finds the drilling rig (Savanna 640) is making up their bottom hole assembly and preparing to drill the 17.5" section of the well.
+
| My inspection today finds the drilling rig (Savanna 640) is making up their bottom hole assembly and preparing to drill the 17.5 section of the well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1239415253
 
| 1239415253
 
| 2013-07-08
 
| 2013-07-08
|
+
|  
| The drilling rig is currently hooking up equipment to pressure test the 13.375" casing string.
+
| The drilling rig is currently hooking up equipment to pressure test the 13.375 casing string.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1272997038
 +
| 2013-07-22
 +
|
 +
| My inspection today finds the rig crew is running 7150' of 9.625 casing.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1370167318
 
| 1370167318
 
| 2013-06-01
 
| 2013-06-01
|
+
|  
| My inspection today finds the drilling contractor Eviro-spud is ran 309' of 20" casing.  Calfrac cemented the casing in place with class A cement.  20 bbl of cement returns to surface.
+
| My inspection today finds the drilling contractor Eviro-spud is ran 309' of 20 casing.  Calfrac cemented the casing in place with class A cement.  20 bbl of cement returns to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1374776608
 
| 1374776608
 
| 2013-07-17
 
| 2013-07-17
|
+
|  
 
| My inspection today finds the drilling rig has shut down due to the top drive being broken.  Current depth is 5088'.
 
| My inspection today finds the drilling rig has shut down due to the top drive being broken.  Current depth is 5088'.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1375297606
 
| 1375297606
 
| 2013-07-25
 
| 2013-07-25
|
+
|  
 
| I received a call from CNX stating that they had a diesel spill on location.  Upon my arrival the spill was 95% cleaned.  The estimated total of the spill was 56 gallons with 50 gallons being held on the primary containment.  All material off of containment that was impacted was hauled off to a disposal facility.
 
| I received a call from CNX stating that they had a diesel spill on location.  Upon my arrival the spill was 95% cleaned.  The estimated total of the spill was 56 gallons with 50 gallons being held on the primary containment.  All material off of containment that was impacted was hauled off to a disposal facility.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1417801255
 
| 1417801255
 
| 2013-07-23
 
| 2013-07-23
|
+
|  
| I am onsite to witness the second stage cementing of the 9.625" casing The stage tool is set at 4262'.  Calfrac circulated 882 sks of 13.8# cement into place.  I witnessed 30 bbl of cement returns to surface.
+
| I am onsite to witness the second stage cementing of the 9.625 casing The stage tool is set at 4262'.  Calfrac circulated 882 sks of 13.8# cement into place.  I witnessed 30 bbl of cement returns to surface.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1596835850
 +
| 2014-11-06
 +
|
 +
| My inspection today finds the site meets the preliminary restoration requirements.  The tank battery is comprised of eight 500 barrel tanks set in a metal dike with a plastic liner.  Four 500 barrel temporary tanks are set on site in a plastic liner.  A liquids pump system is set up at the back of the production site along with a large compressor.  Vegetation has been established around the site.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1665470305
 +
| 2013-07-12
 +
|
 +
| My inspection today finds the operator is drilling the 12.25 section of the well at a depth of 2433'
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 277319173
 
| 277319173
 
| 2013-06-08
 
| 2013-06-08
|
+
|  
 
| Redstone drilling ran casing to a depth of 313'.  Calfrac circulated 629 sks of class a cement.  There were no cement returns to surface.  Weatherford will bond log the well to find cement top.
 
| Redstone drilling ran casing to a depth of 313'.  Calfrac circulated 629 sks of class a cement.  There were no cement returns to surface.  Weatherford will bond log the well to find cement top.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -417719886
 +
| 2013-05-30
 +
|
 +
| My inspection today finds Enviro-spud has drilled to a depth of 249'.  The rig is currently broke down.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -912656021
 +
| 2013-07-23
 +
|
 +
| I am onsite to witness the cementing of the first stage of the 9.625 casing.  Calfrac circulated 978 sks of 15.5# cement into place.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -997704215
 +
| 2014-11-06
 +
|
 +
| My inspection today finds the site meets the preliminary restoration requirements.  The tank battery is comprised of eight 500 barrel tanks set in a metal dike with a plastic liner.  Four 500 barrel temporary tanks are set on site in a plastic liner.  A liquids pump system is set up at the back of the production site along with a large compressor.  Vegetation has been established around the site.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 22:42, 14 July 2015

Well Details

Well ID: 34-121-24418
Loading map...
County: Noble
Municipality:
Operator Name: CNX GAS COMPANY LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-05-18
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.83777514
Longitude: -81.39305596

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-3 9451.0 4.0 1375.0 4.0
2014-4 97612.0 30.0 6240.0 30.0
2015-1 196932.0 60.0 7569.0 60.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1102375915 2013-07-01 My inspection today finds the drilling rig (Savanna 640) is making up their bottom hole assembly and preparing to drill the 17.5 section of the well.
1239415253 2013-07-08 The drilling rig is currently hooking up equipment to pressure test the 13.375 casing string.
-1272997038 2013-07-22 My inspection today finds the rig crew is running 7150' of 9.625 casing.
1370167318 2013-06-01 My inspection today finds the drilling contractor Eviro-spud is ran 309' of 20 casing. Calfrac cemented the casing in place with class A cement. 20 bbl of cement returns to surface.
1374776608 2013-07-17 My inspection today finds the drilling rig has shut down due to the top drive being broken. Current depth is 5088'.
1375297606 2013-07-25 I received a call from CNX stating that they had a diesel spill on location. Upon my arrival the spill was 95% cleaned. The estimated total of the spill was 56 gallons with 50 gallons being held on the primary containment. All material off of containment that was impacted was hauled off to a disposal facility.
1417801255 2013-07-23 I am onsite to witness the second stage cementing of the 9.625 casing The stage tool is set at 4262'. Calfrac circulated 882 sks of 13.8# cement into place. I witnessed 30 bbl of cement returns to surface.
-1596835850 2014-11-06 My inspection today finds the site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set in a metal dike with a plastic liner. Four 500 barrel temporary tanks are set on site in a plastic liner. A liquids pump system is set up at the back of the production site along with a large compressor. Vegetation has been established around the site.
-1665470305 2013-07-12 My inspection today finds the operator is drilling the 12.25 section of the well at a depth of 2433'
277319173 2013-06-08 Redstone drilling ran casing to a depth of 313'. Calfrac circulated 629 sks of class a cement. There were no cement returns to surface. Weatherford will bond log the well to find cement top.
-417719886 2013-05-30 My inspection today finds Enviro-spud has drilled to a depth of 249'. The rig is currently broke down.
-912656021 2013-07-23 I am onsite to witness the cementing of the first stage of the 9.625 casing. Calfrac circulated 978 sks of 15.5# cement into place.
-997704215 2014-11-06 My inspection today finds the site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set in a metal dike with a plastic liner. Four 500 barrel temporary tanks are set on site in a plastic liner. A liquids pump system is set up at the back of the production site along with a large compressor. Vegetation has been established around the site.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.