X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23040"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23040
 
| Well ID: 34-153-23040
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.9688900691, -81.4917024985 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.96890377, -81.49211194 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Summit County, Ohio|Summit]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GONZOIL INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2008-07-01
 
| Spud Date: 2008-07-01
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.9688900691
+
| Latitude: 40.96890377
 
|-
 
|-
| Longitude: -81.4917024985
+
| Longitude: -81.49211194
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 24547.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 2611.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 23234.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1625.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 20468.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1245.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 15789.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1059.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 11927.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1001.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 11041.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 1066.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 112:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -302609035
 
| 2009-06-08
 
|
 
| Preliminary restoration is approved.
 
|
 
|
 
|
 
|-
 
|-
 
| -394418898
 
| 2008-07-25
 
|
 
| The drilling pits have been solidified and covered over. Bishop Well Service was rigging up and the frac job is scheduled for Monday July 28. No violations at this time.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1215995116
 
| 1215995116
 
| 2008-07-01
 
| 2008-07-01
|
+
|  
 
| Wildcat is on location and will spud later today. The shale pit is dug and lined. The blow pit is being dug.
 
| Wildcat is on location and will spud later today. The shale pit is dug and lined. The blow pit is being dug.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1216654260
 
| 1216654260
 
| 2008-07-07
 
| 2008-07-07
|
+
|  
 
| Wildcat is drilling ahead and should reach TD tomorrow. The drilling pits are fence, lined and in good condition. No violations at this time.
 
| Wildcat is drilling ahead and should reach TD tomorrow. The drilling pits are fence, lined and in good condition. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1223038482
 
| 1223038482
 
| 2008-09-29
 
| 2008-09-29
|
+
|  
 
| The well is scheduled for turn on tomorrow. The fence is around the tank battery and will be placed around the wellhead as soon as the stone pad is delivered. No violations at this time.
 
| The well is scheduled for turn on tomorrow. The fence is around the tank battery and will be placed around the wellhead as soon as the stone pad is delivered. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 131554010
 
| 131554010
 
| 2008-08-26
 
| 2008-08-26
|
+
|  
 
| The tank battery has been built, the site graded, seeded and mulched and the meter run installed. The well can be turned on as soon as the fencing has been installed. No violations at this time.
 
| The tank battery has been built, the site graded, seeded and mulched and the meter run installed. The well can be turned on as soon as the fencing has been installed. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 2071016537
 
| 2071016537
 
| 2008-07-16
 
| 2008-07-16
|
+
|  
 
| Wildcat is starting to move off location. The pits are fenced, lined and in good condition.
 
| Wildcat is starting to move off location. The pits are fenced, lined and in good condition.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -302609035
 +
| 2009-06-08
 +
|
 +
| Preliminary restoration is approved.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -394418898
 +
| 2008-07-25
 +
|
 +
| The drilling pits have been solidified and covered over. Bishop Well Service was rigging up and the frac job is scheduled for Monday July 28. No violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 671884277
 
| 671884277
 
| 2008-07-17
 
| 2008-07-17
|
+
|  
 
| Wildcat has moved off.
 
| Wildcat has moved off.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 22:09, 14 July 2015

Well Details

Well ID: 34-153-23040
Loading map...
County: Summit
Municipality:
Operator Name: GONZOIL INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2008-07-01
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.96890377
Longitude: -81.49211194

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2009-0 24547.0 2611.0
2010-0 23234.0 1625.0
2011-0 20468.0 1245.0
2012-0 15789.0 1059.0
2013-0 11927.0 1001.0
2014-0 11041.0 365.0 1066.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1215995116 2008-07-01 Wildcat is on location and will spud later today. The shale pit is dug and lined. The blow pit is being dug.
1216654260 2008-07-07 Wildcat is drilling ahead and should reach TD tomorrow. The drilling pits are fence, lined and in good condition. No violations at this time.
1223038482 2008-09-29 The well is scheduled for turn on tomorrow. The fence is around the tank battery and will be placed around the wellhead as soon as the stone pad is delivered. No violations at this time.
131554010 2008-08-26 The tank battery has been built, the site graded, seeded and mulched and the meter run installed. The well can be turned on as soon as the fencing has been installed. No violations at this time.
2071016537 2008-07-16 Wildcat is starting to move off location. The pits are fenced, lined and in good condition.
-302609035 2009-06-08 Preliminary restoration is approved.
-394418898 2008-07-25 The drilling pits have been solidified and covered over. Bishop Well Service was rigging up and the frac job is scheduled for Monday July 28. No violations at this time.
671884277 2008-07-17 Wildcat has moved off.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.