X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-029-21799"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-029-21799
 
| Well ID: 34-029-21799
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.8914787843, -80.7957603262 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.89147878, -80.79576033 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Columbiana County, Ohio|Columbiana]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-06-15
 
| Spud Date: 2013-06-15
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Well Drilled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.8914787843
+
| Latitude: 40.89147878
 
|-
 
|-
| Longitude: -80.7957603262
+
| Longitude: -80.79576033
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -111819665
 
| -111819665
 
| 2012-11-16
 
| 2012-11-16
|
+
|  
 
| I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
 
| I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1372683018
 +
| 2013-06-18
 +
|
 +
| I went to the site to witness the cementing of the intermediate casing.  The drilling contractor, Nomac 43, drilled a 12.25 diameter hole to 1510
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1495425853
 
| -1495425853
 
| 2013-06-24
 
| 2013-06-24
|
+
|  
 
+
| I was at the site checking the drilling progress.  Nomac 43 was drilling at 7113
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1724587061
 +
| 2013-06-07
 +
|
 +
| I went to the site to witness the cementing of the mine string casing.  The drilling contractor, Express Energy Services, had installed 60
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1728459954
 
| -1728459954
 
| 2013-06-29
 
| 2013-06-29
|
+
|  
 
+
| I was at the site to witness the cementing of the production casing.  The drilling contractor, Nomac 43, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1495.96 to 6850
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1372683018
 
| 2013-06-18
 
|
 
 
 
|
 
|
 
|
 
|-
 
|-
 
| 1724587061
 
| 2013-06-07
 
|
 
 
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 2014370236
 
| 2014370236
 
| 2013-06-15
 
| 2013-06-15
|
+
|  
 
+
| I went to the site to witness the cementing of the surface casing.  The drilling contractor, Nomac 43, spudded the well on 06/15/2013.  The 17.50 diameter surface hole was drilled to 500
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 323961220
 
| 323961220
 
| 2013-06-05
 
| 2013-06-05
|
+
|  
 
+
| I witnessed the cementing of the conductor casing.  Express Energy Services drilled a 36 diameter hole to 61
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 649678905
 
| 649678905
 
| 2013-06-06
 
| 2013-06-06
|
+
|  
| I was on location to check the status of the mine string being drilled on this location with an auger rig. A 30" conductor was set to 60' and they expected the mine void to be hit around 115' below the surface. The auger rig will drill the mine string and set 20" welded casing into the mine void. I had to leave the location for a surface cement job before I could witness the job.
+
| I was on location to check the status of the mine string being drilled on this location with an auger rig. A 30 conductor was set to 60' and they expected the mine void to be hit around 115' below the surface. The auger rig will drill the mine string and set 20 welded casing into the mine void. I had to leave the location for a surface cement job before I could witness the job.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 22:43, 14 July 2015

Well Details

Well ID: 34-029-21799
Loading map...
County: Columbiana
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-06-15
Unconventional: No
Configuration: Vertical
Well Status: Well Drilled
Violations: 0
Latitude: 40.89147878
Longitude: -80.79576033

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-111819665 2012-11-16 I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
1372683018 2013-06-18 I went to the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 43, drilled a 12.25 diameter hole to 1510
-1495425853 2013-06-24 I was at the site checking the drilling progress. Nomac 43 was drilling at 7113
1724587061 2013-06-07 I went to the site to witness the cementing of the mine string casing. The drilling contractor, Express Energy Services, had installed 60
-1728459954 2013-06-29 I was at the site to witness the cementing of the production casing. The drilling contractor, Nomac 43, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1495.96 to 6850
2014370236 2013-06-15 I went to the site to witness the cementing of the surface casing. The drilling contractor, Nomac 43, spudded the well on 06/15/2013. The 17.50 diameter surface hole was drilled to 500
323961220 2013-06-05 I witnessed the cementing of the conductor casing. Express Energy Services drilled a 36 diameter hole to 61
649678905 2013-06-06 I was on location to check the status of the mine string being drilled on this location with an auger rig. A 30 conductor was set to 60' and they expected the mine void to be hit around 115' below the surface. The auger rig will drill the mine string and set 20 welded casing into the mine void. I had to leave the location for a surface cement job before I could witness the job.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.