X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-067-21072"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-067-21072
 
| Well ID: 34-067-21072
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.1854321865, -81.1675711666 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.18543219, -81.16757117 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Harrison County, Ohio|Harrison]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date: 2012-07-24
+
| Spud Date: 2012-07-25
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.1854321865
+
| Latitude: 40.18543219
 
|-
 
|-
| Longitude: -81.1675711666
+
| Longitude: -81.16757117
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 6406.0
 +
|
 +
|-
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 150314.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 3211.0
 +
|
 +
|-
 +
|-
 +
| 2013-6
 +
| style="text-align:right;" | 270491.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 20463.0
 +
|
 +
|-
 +
|-
 +
| 2013-9
 +
| style="text-align:right;" | 235538.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 10652.0
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 83396.0
 +
| style="text-align:right;" | 75.0
 +
|
 +
|
 +
| style="text-align:right;" | 1383.0
 +
| style="text-align:right;" | 75.0
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 61188.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 1085.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 70850.0
 +
| style="text-align:right;" | 88.0
 +
|
 +
|
 +
| style="text-align:right;" | 1287.0
 +
| style="text-align:right;" | 88.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 57647.0
 +
| style="text-align:right;" | 91.0
 +
|
 +
|
 +
| style="text-align:right;" | 961.0
 +
| style="text-align:right;" | 91.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 71344.0
 +
| style="text-align:right;" | 89.0
 +
|
 +
|
 +
| style="text-align:right;" | 1582.0
 +
| style="text-align:right;" | 89.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 139:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1074713760
 
| -1074713760
 
| 2012-07-27
 
| 2012-07-27
|
+
|  
 
| I am on site today to witness the running and cementing of the 13 3/8 casing string. Halliburton broke down and had a 4 hour repair. Crew change and trouble circulating created time run overs.  Had 65 bbls of good returns. See Cement Ticket for more cement information.
 
| I am on site today to witness the running and cementing of the 13 3/8 casing string. Halliburton broke down and had a 4 hour repair. Crew change and trouble circulating created time run overs.  Had 65 bbls of good returns. See Cement Ticket for more cement information.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1225740344
 +
| 2012-08-03
 +
|
 +
| UDI RIG # 60 drilling ahead at 6500 ft
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 152643755
 +
| 2012-08-07
 +
|
 +
| I am on site today to witness the running and cementing of the 9 5/8 casing. This job was a 2 stage cement job and there was a 4 hour delay between stage one and two. See cement ticket for more cement information.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1533035009
 +
| 2015-03-03
 +
|
 +
| My inspection revealed that the well is in operation. The well has a tree and is being produced through a line heater and separators with a flare stack. The production tanks are inside a lined dike that appears to be liquid tight. There are solar panels on site so that the well can be operated using telemetry.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1743858520
 
| -1743858520
 
| 2013-12-16
 
| 2013-12-16
|
+
|  
 
| On the day of my inspection the site passed preliminary restoration according to 1509.072A.
 
| On the day of my inspection the site passed preliminary restoration according to 1509.072A.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1839408517
 +
| 2012-07-24
 +
|
 +
| I am meeting today with Tim Wilson and Charlie Morgan about casing information for this site. Gulfport wants to set 2000 ft of 13 3/8 casing. Our rules require that they not set thru the Berea without having set a casing string to protect the water wells. The permit was issued before the new rules go into effect. The operator has advised that they will not set thru the Berea with this casing string.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -274050679
 
| -274050679
 
| 2013-12-16
 
| 2013-12-16
|
+
|  
 
| On the day of my inspection the site passed preliminary restoration according to 1509.072A.
 
| On the day of my inspection the site passed preliminary restoration according to 1509.072A.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -47574508
 
| -47574508
 
| 2012-07-26
 
| 2012-07-26
|
+
|  
 
| Gulfport has UDI # 60 on site to drill this well. They are drilling at 1025 ft on 17.5 inch hole.
 
| Gulfport has UDI # 60 on site to drill this well. They are drilling at 1025 ft on 17.5 inch hole.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 526243837
 +
| 2012-08-01
 +
|
 +
| UDI rig # 60 is at 4200 ft drilling ahead on air. All safety equipment is in place.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -62150737
 
| -62150737
 
| 2012-08-06
 
| 2012-08-06
|
+
|  
 
| UDI rig # 60 drilling at 7200 ft and will trip out to set 9 5/8 casing.
 
| UDI rig # 60 drilling at 7200 ft and will trip out to set 9 5/8 casing.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -702311254
 
| -702311254
 
| 2012-08-14
 
| 2012-08-14
|
+
|  
 
| UDI rig # 60 is drilling at 7680 ft which will be close to the kick off point for the Horizontal portion of the well. They are on oil base drilling mud.
 
| UDI rig # 60 is drilling at 7680 ft which will be close to the kick off point for the Horizontal portion of the well. They are on oil base drilling mud.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1225740344
 
| 2012-08-03
 
|
 
| UDI RIG # 60 drilling ahead at 6500 ft
 
|
 
|
 
|
 
|-
 
|-
 
| 152643755
 
| 2012-08-07
 
|
 
| I am on site today to witness the running and cementing of the 9 5/8 casing. This job was a 2 stage cement job and there was a 4 hour delay between stage one and two. See cement ticket for more cement information.
 
|
 
|
 
|
 
|-
 
|-
 
| 1839408517
 
| 2012-07-24
 
|
 
| I am meeting today with Tim Wilson and Charlie Morgan about casing information for this site. Gulfport wants to set 2000 ft of 13 3/8 casing. Our rules require that they not set thru the Berea without having set a casing string to protect the water wells. The permit was issued before the new rules go into effect. The operator has advised that they will not set thru the Berea with this casing string.
 
|
 
|
 
|
 
|-
 
|-
 
| 526243837
 
| 2012-08-01
 
|
 
| UDI rig # 60 is at 4200 ft drilling ahead on air. All safety equipment is in place.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 902644655
 
| 902644655
 
| 2012-07-11
 
| 2012-07-11
|
+
|  
 
| DNR inspector Mark Moreland and I were on site to check the status of this site.  Our inspection revealed that UDI Drilling has some pipe racks and drill pipe already on site and that HAD Drilling has set the conductor casing and the mouse hole. No violations noted at this time. We departed the site and went to permit number 1078 (Gulfport Energy-Clay #1-16).
 
| DNR inspector Mark Moreland and I were on site to check the status of this site.  Our inspection revealed that UDI Drilling has some pipe racks and drill pipe already on site and that HAD Drilling has set the conductor casing and the mouse hole. No violations noted at this time. We departed the site and went to permit number 1078 (Gulfport Energy-Clay #1-16).
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 22:52, 14 July 2015

Well Details

Well ID: 34-067-21072
Loading map...
County: Harrison
Municipality:
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-07-25
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.18543219
Longitude: -81.16757117

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 0.0 6406.0
2013-12 150314.0 3211.0
2013-6 270491.0 20463.0
2013-9 235538.0 10652.0
2014-1 83396.0 75.0 1383.0 75.0
2014-3 61188.0 92.0 1085.0 92.0
2014-2 70850.0 88.0 1287.0 88.0
2014-4 57647.0 91.0 961.0 91.0
2015-1 71344.0 89.0 1582.0 89.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1074713760 2012-07-27 I am on site today to witness the running and cementing of the 13 3/8 casing string. Halliburton broke down and had a 4 hour repair. Crew change and trouble circulating created time run overs. Had 65 bbls of good returns. See Cement Ticket for more cement information.
1225740344 2012-08-03 UDI RIG # 60 drilling ahead at 6500 ft
152643755 2012-08-07 I am on site today to witness the running and cementing of the 9 5/8 casing. This job was a 2 stage cement job and there was a 4 hour delay between stage one and two. See cement ticket for more cement information.
-1533035009 2015-03-03 My inspection revealed that the well is in operation. The well has a tree and is being produced through a line heater and separators with a flare stack. The production tanks are inside a lined dike that appears to be liquid tight. There are solar panels on site so that the well can be operated using telemetry.
-1743858520 2013-12-16 On the day of my inspection the site passed preliminary restoration according to 1509.072A.
1839408517 2012-07-24 I am meeting today with Tim Wilson and Charlie Morgan about casing information for this site. Gulfport wants to set 2000 ft of 13 3/8 casing. Our rules require that they not set thru the Berea without having set a casing string to protect the water wells. The permit was issued before the new rules go into effect. The operator has advised that they will not set thru the Berea with this casing string.
-274050679 2013-12-16 On the day of my inspection the site passed preliminary restoration according to 1509.072A.
-47574508 2012-07-26 Gulfport has UDI # 60 on site to drill this well. They are drilling at 1025 ft on 17.5 inch hole.
526243837 2012-08-01 UDI rig # 60 is at 4200 ft drilling ahead on air. All safety equipment is in place.
-62150737 2012-08-06 UDI rig # 60 drilling at 7200 ft and will trip out to set 9 5/8 casing.
-702311254 2012-08-14 UDI rig # 60 is drilling at 7680 ft which will be close to the kick off point for the Horizontal portion of the well. They are on oil base drilling mud.
902644655 2012-07-11 DNR inspector Mark Moreland and I were on site to check the status of this site. Our inspection revealed that UDI Drilling has some pipe racks and drill pipe already on site and that HAD Drilling has set the conductor casing and the mouse hole. No violations noted at this time. We departed the site and went to permit number 1078 (Gulfport Energy-Clay #1-16).

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.