If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-167-29740 | | Well ID: 34-167-29740 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.54181907, -81.63247868 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Washington County, Ohio|Washington]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[LANG LARRY D DBA LANG O & G]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-03-31 | | Spud Date: 2014-03-31 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Drilling |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.54181907 |
|- | |- | ||
| Longitude: -81.63247868 | | Longitude: -81.63247868 | ||
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | 1396381631 | ||
+ | | 2014-04-01 | ||
+ | | | ||
+ | | Accompanied Inspector Andy Thomas to witness the cementing of 300' of 7 surface casing. There was good circulation observed as well as good cement returns at the surface. The well released an air pocket during cementing and caused the cement to drop in the hole. Formation Cementing toppped off the hole with cement from the top of the casing. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -257889389 | | -257889389 | ||
| 2014-04-02 | | 2014-04-02 | ||
− | | | + | | |
| Witnessed the cementing of the production string. Good circulation was achieved throughtout the job. When the plug was landed they pressured it up to 1000 psi. It held for 5 minutes. | | Witnessed the cementing of the production string. Good circulation was achieved throughtout the job. When the plug was landed they pressured it up to 1000 psi. It held for 5 minutes. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -32698787 | | -32698787 | ||
| 2014-04-22 | | 2014-04-22 | ||
− | | | + | | |
| Obtained accurate GPS coordinated for well. Pit was closed and restoration had started to take place. Accompanied on inspection by inspector LJ Parkins. | | Obtained accurate GPS coordinated for well. Pit was closed and restoration had started to take place. Accompanied on inspection by inspector LJ Parkins. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -410042700 | | -410042700 | ||
| 2014-03-31 | | 2014-03-31 | ||
− | | | + | | |
| Witnessed the cementing of the conductor casing. Good circulations and good returns were observed at the surface. Cement stayed up after pumping ceased. | | Witnessed the cementing of the conductor casing. Good circulations and good returns were observed at the surface. Cement stayed up after pumping ceased. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -770164223 | | -770164223 | ||
| 2014-04-01 | | 2014-04-01 | ||
− | | | + | | |
| Witnessed the cementing of the surface casing string. Good circulation was achieved and good returns were observed. After the plug landed casing string was pressured up to 500 psi. and it held for 5 min. The well burped after the plug landed and cement level fell out of sight. The back side of the surface casing was then topped off from the surface. Cement was brought to the surface and it stayed up. No chlorides were detected in the mix water. Accompanied by Inspector LJ Parkins. | | Witnessed the cementing of the surface casing string. Good circulation was achieved and good returns were observed. After the plug landed casing string was pressured up to 500 psi. and it held for 5 min. The well burped after the plug landed and cement level fell out of sight. The back side of the surface casing was then topped off from the surface. Cement was brought to the surface and it stayed up. No chlorides were detected in the mix water. Accompanied by Inspector LJ Parkins. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-167-29740 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.54181907,"lon":-81.63247868,"icon":""}]} |
County: Washington | |
Municipality: | |
Operator Name: LANG LARRY D DBA LANG O & G | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-03-31 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Drilling | |
Violations: 0 | |
Latitude: 39.54181907 | |
Longitude: -81.63247868 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1396381631 | 2014-04-01 | Accompanied Inspector Andy Thomas to witness the cementing of 300' of 7 surface casing. There was good circulation observed as well as good cement returns at the surface. The well released an air pocket during cementing and caused the cement to drop in the hole. Formation Cementing toppped off the hole with cement from the top of the casing. | ||||
-257889389 | 2014-04-02 | Witnessed the cementing of the production string. Good circulation was achieved throughtout the job. When the plug was landed they pressured it up to 1000 psi. It held for 5 minutes. | ||||
-32698787 | 2014-04-22 | Obtained accurate GPS coordinated for well. Pit was closed and restoration had started to take place. Accompanied on inspection by inspector LJ Parkins. | ||||
-410042700 | 2014-03-31 | Witnessed the cementing of the conductor casing. Good circulations and good returns were observed at the surface. Cement stayed up after pumping ceased. | ||||
-770164223 | 2014-04-01 | Witnessed the cementing of the surface casing string. Good circulation was achieved and good returns were observed. After the plug landed casing string was pressured up to 500 psi. and it held for 5 min. The well burped after the plug landed and cement level fell out of sight. The back side of the surface casing was then topped off from the surface. Cement was brought to the surface and it stayed up. No chlorides were detected in the mix water. Accompanied by Inspector LJ Parkins. |
For data sources see[1]