X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-151-25844"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-151-25844
 
| Well ID: 34-151-25844
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.75850566, -81.1370976558 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.75850566, -81.13709766 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Stark County, Ohio|Stark]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[C & T ENERGY OF EAST CANTON]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-10-15
 
| Spud Date: 2013-10-15
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Well Drilled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
Line 31: Line 31:
 
| Latitude: 40.75850566
 
| Latitude: 40.75850566
 
|-
 
|-
| Longitude: -81.1370976558
+
| Longitude: -81.13709766
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 3557.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 2936.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| 1382450812
 
| 1382450812
 
| 2013-10-17
 
| 2013-10-17
|
+
|  
| I was onsite to witness the cementing of the 11.75" surface casing that was set to 627'. A total of 350sks of 15.6ppg cement was pumped and 15 barrels of cement were returned to surface.
+
| I was onsite to witness the cementing of the 11.75 surface casing that was set to 627'. A total of 350sks of 15.6ppg cement was pumped and 15 barrels of cement were returned to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1382620561
 
| 1382620561
 
| 2013-10-23
 
| 2013-10-23
|
+
|  
 
| I was on location to check the status of the well. Currently the well has hit TD and has had production casing cemented. A crew was onsite to run a bond log and several other logs. Advent drilling at this time is unsure of there next well, depending on when permits are released.
 
| I was on location to check the status of the well. Currently the well has hit TD and has had production casing cemented. A crew was onsite to run a bond log and several other logs. Advent drilling at this time is unsure of there next well, depending on when permits are released.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 00:28, 15 July 2015

Well Details

Well ID: 34-151-25844
Loading map...
County: Stark
Municipality:
Operator Name: C & T ENERGY OF EAST CANTON
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-10-15
Unconventional: No
Configuration: Vertical
Well Status: Well Drilled
Violations: 0
Latitude: 40.75850566
Longitude: -81.13709766

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 0.0 0.0
2014-0 3557.0 365.0 2936.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1382450812 2013-10-17 I was onsite to witness the cementing of the 11.75 surface casing that was set to 627'. A total of 350sks of 15.6ppg cement was pumped and 15 barrels of cement were returned to surface.
1382620561 2013-10-23 I was on location to check the status of the well. Currently the well has hit TD and has had production casing cemented. A crew was onsite to run a bond log and several other logs. Advent drilling at this time is unsure of there next well, depending on when permits are released.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.