If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-167-29680 | | Well ID: 34-167-29680 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.50590527, -81.13702601 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Washington County, Ohio|Washington]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[MARTIN LARREY C]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2009-03-23 | | Spud Date: 2009-03-23 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Drilling |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.50590527 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.13702601 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -148002045 | | -148002045 | ||
| 2011-03-17 | | 2011-03-17 | ||
− | | | + | | |
| Larrey Martin still has not fracted this well - needs to get reclamation done even if not finished with well - will let him know this - should be fracted in next few months. | | Larrey Martin still has not fracted this well - needs to get reclamation done even if not finished with well - will let him know this - should be fracted in next few months. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -210089574 | | -210089574 | ||
| 2010-08-10 | | 2010-08-10 | ||
− | | | + | | |
| Inspection this day found drill rig still over hole, well is idle, pit filled in, no ID's. Will call Larrey and ask him to correct problems. No completion report yet. Well finished drilling @ end of Dec. 2009. 8/12-Talked to Larrey and he is waiting on fract show be in next couple months - well has been perfed and he is willing to send in completion report now if we need it. Says he is leaving rig there as it will do the service rig work after well is fracted. | | Inspection this day found drill rig still over hole, well is idle, pit filled in, no ID's. Will call Larrey and ask him to correct problems. No completion report yet. Well finished drilling @ end of Dec. 2009. 8/12-Talked to Larrey and he is waiting on fract show be in next couple months - well has been perfed and he is willing to send in completion report now if we need it. Says he is leaving rig there as it will do the service rig work after well is fracted. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 2107207142 | ||
+ | | 2009-06-15 | ||
+ | | | ||
+ | | Inspection this day found cable tool rig still on location over hole, no one at rig. Casing has a swedge with valve on it - well shut in. Don't know if they are done drilling, or just waiting to measure pressure and possible sell down before they go deeper. Pit full of cuttings but no fluids. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -699629108 | | -699629108 | ||
| 2009-07-17 | | 2009-07-17 | ||
− | | | + | | |
| Back drilling on well, sold gas off of 1st pay zone for awhile, now back drilling. Pit good, lined. | | Back drilling on well, sold gas off of 1st pay zone for awhile, now back drilling. Pit good, lined. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-167-29680 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.50590527,"lon":-81.13702601,"icon":""}]} |
County: Washington | |
Municipality: | |
Operator Name: MARTIN LARREY C | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-03-23 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Drilling | |
Violations: 0 | |
Latitude: 39.50590527 | |
Longitude: -81.13702601 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-148002045 | 2011-03-17 | Larrey Martin still has not fracted this well - needs to get reclamation done even if not finished with well - will let him know this - should be fracted in next few months. | ||||
-210089574 | 2010-08-10 | Inspection this day found drill rig still over hole, well is idle, pit filled in, no ID's. Will call Larrey and ask him to correct problems. No completion report yet. Well finished drilling @ end of Dec. 2009. 8/12-Talked to Larrey and he is waiting on fract show be in next couple months - well has been perfed and he is willing to send in completion report now if we need it. Says he is leaving rig there as it will do the service rig work after well is fracted. | ||||
2107207142 | 2009-06-15 | Inspection this day found cable tool rig still on location over hole, no one at rig. Casing has a swedge with valve on it - well shut in. Don't know if they are done drilling, or just waiting to measure pressure and possible sell down before they go deeper. Pit full of cuttings but no fluids. | ||||
-699629108 | 2009-07-17 | Back drilling on well, sold gas off of 1st pay zone for awhile, now back drilling. Pit good, lined. |
For data sources see[1]