{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-085-21213 | | Well ID: 34-085-21213 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.67421388, -81.4243152 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Lake County, Ohio|Lake]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[SMAIL JAMES R INC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2007-06-20 | | Spud Date: 2007-06-20 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.67421388 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.4243152 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2008-0 | ||
+ | | style="text-align:right;" | 2580.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 118.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2009-0 | ||
+ | | style="text-align:right;" | 1993.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 102.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-0 | ||
+ | | style="text-align:right;" | 903.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-0 | ||
+ | | style="text-align:right;" | 661.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 104.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 518.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 50.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 409.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 357.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 48.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 121: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1152450380 |
− | | | + | | 2015-02-25 |
− | | | + | | |
− | | | + | | I inspected this well as part of routine inspection activity. The well and battery are located on the north portion of the grounds of the East Lake Middle School and Lakeshore Blvd. The wellhead mechanical plunger lift is located in a small chain-link enclosure which is locked. The fitting and connections at the wellhead are secure and free from signs of leakage or problems. The tank battery which is comprised of 2 100-barrel steel tanks (1 production, 1 brine) and mechanical separator. Interior spacing is compliant. Load-outs are secure. The gate is locked and secure. Fittings and connections are free from signs of leakage or problems. Areas surrounding the well and battery are snow-covered. I did not observe any signs of impact from the well or problems with runoff. |
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1182274352 | | 1182274352 | ||
| 2007-06-19 | | 2007-06-19 | ||
− | | | + | | |
| Operator is constructing pits. During excavation operator hit a green drain tile, was attempting to locate a replacement at the time of inspection. Operator also hit the remains of a foundation of a building while digging the pits. Location of the pits is in fill material. Operator needs to get a permit on site before any more site construction is completed. All permit conditions need to be followed. | | Operator is constructing pits. During excavation operator hit a green drain tile, was attempting to locate a replacement at the time of inspection. Operator also hit the remains of a foundation of a building while digging the pits. Location of the pits is in fill material. Operator needs to get a permit on site before any more site construction is completed. All permit conditions need to be followed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1182526871 | | 1182526871 | ||
| 2007-06-21 | | 2007-06-21 | ||
− | | | + | | |
| On site for surface cement. Operator set CND last night. Operator informed me that the pit linear had a leak, the fluid was flowing threw the fill material that the pits were constructed on and into a creek. Fluid was fresh water with Gel that was used to treat the fill material. Operator was pumping down pit into tanks, to locate the leak. Operator is going to draw down the pit, reline the pit. Surface cement went well, good returns. | | On site for surface cement. Operator set CND last night. Operator informed me that the pit linear had a leak, the fluid was flowing threw the fill material that the pits were constructed on and into a creek. Fluid was fresh water with Gel that was used to treat the fill material. Operator was pumping down pit into tanks, to locate the leak. Operator is going to draw down the pit, reline the pit. Surface cement went well, good returns. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1312377647 | | 1312377647 | ||
| 2011-08-02 | | 2011-08-02 | ||
− | | | + | | |
| Lease road stable. Spacing, dike in compliance. Vent hatches installed and closed. Feed lines are bullplugged. Lightning arrestor and charcoal filter installed. No violations at this time. | | Lease road stable. Spacing, dike in compliance. Vent hatches installed and closed. Feed lines are bullplugged. Lightning arrestor and charcoal filter installed. No violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1351862471 | | 1351862471 | ||
| 2012-10-04 | | 2012-10-04 | ||
− | | | + | | |
| The unit consists of a 2-tank battery with mechanical separator enclosed in a 8-foot chainlink fence. The spacing is in accordance with the rule, and the valving and mechanicals are in good repair. I did not observe any signs of leaking product or gas vapors. The wellhead is fitted with a mechanical lift device and is located in a separate gated 6-foot chainlink enclosure. The gates on the enclosures are locked. The tank battery dike is adequate. No violations noted. | | The unit consists of a 2-tank battery with mechanical separator enclosed in a 8-foot chainlink fence. The spacing is in accordance with the rule, and the valving and mechanicals are in good repair. I did not observe any signs of leaking product or gas vapors. The wellhead is fitted with a mechanical lift device and is located in a separate gated 6-foot chainlink enclosure. The gates on the enclosures are locked. The tank battery dike is adequate. No violations noted. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1561996433 | ||
+ | | 2009-07-22 | ||
+ | | | ||
+ | | in complance. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1854531860 | ||
+ | | 2009-11-12 | ||
+ | | | ||
+ | | There were no violations at the time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 310684507 | | 310684507 | ||
| 2012-03-12 | | 2012-03-12 | ||
− | | | + | | |
| This well is equipped with a plunger lift system. The tank battery is equipped with two 100 barrel production tanks, one 1500 gallon poly brine tank, a mechanical separator and the meter run. Equipment spacing is correct. The tank battery is fenced and the dike is in good repair. Identification signs are posted on the tank battery and the well. The man doors are locked. The lease road is stable and constructed out of durable material. | | This well is equipped with a plunger lift system. The tank battery is equipped with two 100 barrel production tanks, one 1500 gallon poly brine tank, a mechanical separator and the meter run. Equipment spacing is correct. The tank battery is fenced and the dike is in good repair. Identification signs are posted on the tank battery and the well. The man doors are locked. The lease road is stable and constructed out of durable material. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -777986797 | ||
+ | | 2007-06-21 | ||
+ | | | ||
+ | | Operator was repairing pit liner at the time of inspection. Leak was located, operator was pumping pit down, so that they would be able to reline the pit. Operator was waiting on cement to set. Inspected drill bit, bit was new and in good repair. Operator called at 4:45pm BOP test was at 5:45 unable to attend BOP test. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -79863487 | ||
+ | | 2009-09-16 | ||
+ | | | ||
+ | | Preliminary restoration was completed. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-085-21213 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.67421388,"lon":-81.4243152,"icon":""}]} |
County: Lake | |
Municipality: | |
Operator Name: SMAIL JAMES R INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2007-06-20 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.67421388 | |
Longitude: -81.4243152 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2008-0 | 2580.0 | 118.0 | ||||
2009-0 | 1993.0 | 102.0 | ||||
2010-0 | 903.0 | 0.0 | ||||
2011-0 | 661.0 | 104.0 | ||||
2012-0 | 518.0 | 50.0 | ||||
2013-0 | 409.0 | 0.0 | ||||
2014-0 | 357.0 | 365.0 | 48.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1152450380 | 2015-02-25 | I inspected this well as part of routine inspection activity. The well and battery are located on the north portion of the grounds of the East Lake Middle School and Lakeshore Blvd. The wellhead mechanical plunger lift is located in a small chain-link enclosure which is locked. The fitting and connections at the wellhead are secure and free from signs of leakage or problems. The tank battery which is comprised of 2 100-barrel steel tanks (1 production, 1 brine) and mechanical separator. Interior spacing is compliant. Load-outs are secure. The gate is locked and secure. Fittings and connections are free from signs of leakage or problems. Areas surrounding the well and battery are snow-covered. I did not observe any signs of impact from the well or problems with runoff. | ||||
1182274352 | 2007-06-19 | Operator is constructing pits. During excavation operator hit a green drain tile, was attempting to locate a replacement at the time of inspection. Operator also hit the remains of a foundation of a building while digging the pits. Location of the pits is in fill material. Operator needs to get a permit on site before any more site construction is completed. All permit conditions need to be followed. | ||||
1182526871 | 2007-06-21 | On site for surface cement. Operator set CND last night. Operator informed me that the pit linear had a leak, the fluid was flowing threw the fill material that the pits were constructed on and into a creek. Fluid was fresh water with Gel that was used to treat the fill material. Operator was pumping down pit into tanks, to locate the leak. Operator is going to draw down the pit, reline the pit. Surface cement went well, good returns. | ||||
1312377647 | 2011-08-02 | Lease road stable. Spacing, dike in compliance. Vent hatches installed and closed. Feed lines are bullplugged. Lightning arrestor and charcoal filter installed. No violations at this time. | ||||
1351862471 | 2012-10-04 | The unit consists of a 2-tank battery with mechanical separator enclosed in a 8-foot chainlink fence. The spacing is in accordance with the rule, and the valving and mechanicals are in good repair. I did not observe any signs of leaking product or gas vapors. The wellhead is fitted with a mechanical lift device and is located in a separate gated 6-foot chainlink enclosure. The gates on the enclosures are locked. The tank battery dike is adequate. No violations noted. | ||||
-1561996433 | 2009-07-22 | in complance. | ||||
-1854531860 | 2009-11-12 | There were no violations at the time. | ||||
310684507 | 2012-03-12 | This well is equipped with a plunger lift system. The tank battery is equipped with two 100 barrel production tanks, one 1500 gallon poly brine tank, a mechanical separator and the meter run. Equipment spacing is correct. The tank battery is fenced and the dike is in good repair. Identification signs are posted on the tank battery and the well. The man doors are locked. The lease road is stable and constructed out of durable material. | ||||
-777986797 | 2007-06-21 | Operator was repairing pit liner at the time of inspection. Leak was located, operator was pumping pit down, so that they would be able to reline the pit. Operator was waiting on cement to set. Inspected drill bit, bit was new and in good repair. Operator called at 4:45pm BOP test was at 5:45 unable to attend BOP test. | ||||
-79863487 | 2009-09-16 | Preliminary restoration was completed. |