If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-045-21323 | | Well ID: 34-045-21323 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.93088068, -82.70106962 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Fairfield County, Ohio|Fairfield]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[PIPES PURSIE E]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2011-07-29 | | Spud Date: 2011-07-29 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Plugged and Abandoned |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.93088068 |
|- | |- | ||
− | | Longitude: -82. | + | | Longitude: -82.70106962 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 312.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 795.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 87.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 408.0 | ||
+ | | style="text-align:right;" | 259.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 82.0 | ||
+ | | style="text-align:right;" | 259.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 85: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -103889557 | | -103889557 | ||
| 2011-07-31 | | 2011-07-31 | ||
− | | | + | | |
| I witnessed the cementing of the surface casing. The cement was verified with Phenolphthalein solution, 1%. Good returns were observed and cement stayed at the surface. Both the surface and conductor hole were drilled on fluid. Note: Circulation lost prior to surface job at approx 250'. Returned to the location later this evening and witnessed the BOP test. The BOP passsed the required test. | | I witnessed the cementing of the surface casing. The cement was verified with Phenolphthalein solution, 1%. Good returns were observed and cement stayed at the surface. Both the surface and conductor hole were drilled on fluid. Note: Circulation lost prior to surface job at approx 250'. Returned to the location later this evening and witnessed the BOP test. The BOP passsed the required test. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | Compliance Notice |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|- | |- | ||
| 1091468302 | | 1091468302 | ||
| 2014-06-03 | | 2014-06-03 | ||
− | | | + | | |
| Status check inspection. This well was drilled in 2011 in a urban area. The fencing around the tank battery and pumping unit has been started but not finished. There are no locks and there no access road. I have contacted P.E.P. drilling supervisor Mark Smith by telephone. I left him a message at 1400 hours. | | Status check inspection. This well was drilled in 2011 in a urban area. The fencing around the tank battery and pumping unit has been started but not finished. There are no locks and there no access road. I have contacted P.E.P. drilling supervisor Mark Smith by telephone. I left him a message at 1400 hours. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | -1331416218 |
− | | | + | | 2015-02-03 |
− | | | + | | |
− | | | + | | Compliance notice follow-up. The well is plugged, this satisfies the compliance notice. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | -1354289099 |
− | | | + | | 2011-07-29 |
− | | | + | | |
− | | | + | | I witnessed the cementing of the 11.75 casing (conductor pipe). |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1798974998 | | 1798974998 | ||
| 2011-07-06 | | 2011-07-06 | ||
− | | | + | | |
| A pre-site inspection of this location was conducted with Mr. Bill Marks and Mineral Resource Inspector, Josh Garland. | | A pre-site inspection of this location was conducted with Mr. Bill Marks and Mineral Resource Inspector, Josh Garland. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 2013488144 | | 2013488144 | ||
| 2011-08-16 | | 2011-08-16 | ||
− | | | + | | |
| I witnessed the solidification of drilling pits. | | I witnessed the solidification of drilling pits. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 2019190322 | ||
+ | | 2014-09-17 | ||
+ | | | ||
+ | | Knox Energy on site, they are having problems pulling the 4.5'' casing. The casing is hanging up with 65,000 pounds of effort. Petroset Cementing on site, they circulated fluid to allow Knox Energy to pull the 4.5'' casing. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -205704633 | ||
+ | | 2014-08-04 | ||
+ | | | ||
+ | | I called Mark Smith with PEP drilling. I informed Mark of the need to plug this well. They have a valid plug permit. Mark said they are moving a rig in two weeks to plug this well. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2077728198 | ||
+ | | 2014-09-16 | ||
+ | | | ||
+ | | Cemenco on site, 40 sacks of class A cement set for bottom hole plug. The plug circulated. Appalachian Well Service on site, they shot the 4.5'' casing of at 2733'. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 48169502 | | 48169502 | ||
| 2012-12-05 | | 2012-12-05 | ||
− | | | + | | |
| I performed a inspection on this urban well, fence is partially constructed, site needs finished, I have contacted PEP Drilling. | | I performed a inspection on this urban well, fence is partially constructed, site needs finished, I have contacted PEP Drilling. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -645588335 | ||
+ | | 2011-08-06 | ||
+ | | | ||
+ | | I witnessed the cementing of 4.5 casing (longstring). | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-045-21323 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.93088068,"lon":-82.70106962,"icon":""}]} |
County: Fairfield | |
Municipality: | |
Operator Name: PIPES PURSIE E | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-07-29 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Plugged and Abandoned | |
Violations: 0 | |
Latitude: 39.93088068 | |
Longitude: -82.70106962 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 312.0 | 0.0 | ||||
2013-0 | 795.0 | 87.0 | ||||
2014-0 | 408.0 | 259.0 | 82.0 | 259.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-103889557 | 2011-07-31 | I witnessed the cementing of the surface casing. The cement was verified with Phenolphthalein solution, 1%. Good returns were observed and cement stayed at the surface. Both the surface and conductor hole were drilled on fluid. Note: Circulation lost prior to surface job at approx 250'. Returned to the location later this evening and witnessed the BOP test. The BOP passsed the required test. | Compliance Notice | |||
1091468302 | 2014-06-03 | Status check inspection. This well was drilled in 2011 in a urban area. The fencing around the tank battery and pumping unit has been started but not finished. There are no locks and there no access road. I have contacted P.E.P. drilling supervisor Mark Smith by telephone. I left him a message at 1400 hours. | ||||
-1331416218 | 2015-02-03 | Compliance notice follow-up. The well is plugged, this satisfies the compliance notice. | ||||
-1354289099 | 2011-07-29 | I witnessed the cementing of the 11.75 casing (conductor pipe). | ||||
1798974998 | 2011-07-06 | A pre-site inspection of this location was conducted with Mr. Bill Marks and Mineral Resource Inspector, Josh Garland. | ||||
2013488144 | 2011-08-16 | I witnessed the solidification of drilling pits. | ||||
2019190322 | 2014-09-17 | Knox Energy on site, they are having problems pulling the 4.5 casing. The casing is hanging up with 65,000 pounds of effort. Petroset Cementing on site, they circulated fluid to allow Knox Energy to pull the 4.5 casing. | ||||
-205704633 | 2014-08-04 | I called Mark Smith with PEP drilling. I informed Mark of the need to plug this well. They have a valid plug permit. Mark said they are moving a rig in two weeks to plug this well. | ||||
2077728198 | 2014-09-16 | Cemenco on site, 40 sacks of class A cement set for bottom hole plug. The plug circulated. Appalachian Well Service on site, they shot the 4.5 casing of at 2733'. | ||||
48169502 | 2012-12-05 | I performed a inspection on this urban well, fence is partially constructed, site needs finished, I have contacted PEP Drilling. | ||||
-645588335 | 2011-08-06 | I witnessed the cementing of 4.5 casing (longstring). |
For data sources see[2]