X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-167-29725"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-167-29725
 
| Well ID: 34-167-29725
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.5324102117, -81.6768847352 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.53241021, -81.67688474 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Washington County, Ohio|Washington]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[PDC ENERGY INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-05-30
 
| Spud Date: 2013-05-30
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.5324102117
+
| Latitude: 39.53241021
 
|-
 
|-
| Longitude: -81.6768847352
+
| Longitude: -81.67688474
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 24222.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 3061.0
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 24465.0
 +
| style="text-align:right;" | 42.0
 +
|
 +
|
 +
| style="text-align:right;" | 1935.0
 +
| style="text-align:right;" | 42.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 22454.0
 +
| style="text-align:right;" | 91.0
 +
|
 +
|
 +
| style="text-align:right;" | 1413.0
 +
| style="text-align:right;" | 91.0
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 14851.0
 +
| style="text-align:right;" | 85.0
 +
|
 +
|
 +
| style="text-align:right;" | 873.0
 +
| style="text-align:right;" | 85.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 16005.0
 +
| style="text-align:right;" | 85.0
 +
|
 +
|
 +
| style="text-align:right;" | 938.0
 +
| style="text-align:right;" | 85.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 14388.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 779.0
 +
| style="text-align:right;" | 90.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 112:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1043830877
 +
| 2013-05-29
 +
|
 +
| Witnessed the spudding of the conductor hole.  Express was performing the work. Met with Mr. Don Kreager on site.  The hole is 36 in. in diameter.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1161852430
 
| -1161852430
 
| 2013-08-26
 
| 2013-08-26
|
+
|  
 
| Stopped by to check out how the stimulation operation was going  with the accompaniment of Mr. Rick Cisler and Mr. Kenny Brown.  Spoke with company man from PDC.  He stated that they had screened off twice and had to fish a perf gun out of the hole.
 
| Stopped by to check out how the stimulation operation was going  with the accompaniment of Mr. Rick Cisler and Mr. Kenny Brown.  Spoke with company man from PDC.  He stated that they had screened off twice and had to fish a perf gun out of the hole.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1188711777
 
| -1188711777
 
| 2013-06-11
 
| 2013-06-11
|
+
|  
 
| Witnessed the 13.375 in casing being cemented.  The depth of the hole is 1982 ft.  1945 ft of pipe was ran in the hole.  Good circulation and good returns were observed.
 
| Witnessed the 13.375 in casing being cemented.  The depth of the hole is 1982 ft.  1945 ft of pipe was ran in the hole.  Good circulation and good returns were observed.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -2698272
 
| 2013-08-20
 
|
 
| Frac crew had their iron disconnected from the well head.  They had sanded off and were waiting on a coiled tubing unit to clean it out so that they could resume stimulation operations.
 
|
 
|
 
|
 
|-
 
|-
 
| -492960486
 
| 2013-09-09
 
|
 
| Company is getting ready to drill plugs out with coiled tubing.  Spoke with company men from Spartan and PDC.
 
|
 
|
 
|
 
|-
 
|-
 
| 1043830877
 
| 2013-05-29
 
|
 
| Witnessed the spudding of the conductor hole.  Express was performing the work. Met with Mr. Don Kreager on site.  The hole is 36 in. in diameter.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1371053677
 
| 1371053677
 
| 2013-06-08
 
| 2013-06-08
|
+
|  
 
| Witnessed the cementing of the surface casing.  Casing crew was having difficulties threading pipe together.  Mix water was tested and no chlorides were detected using high and low range Quantabs.  They are using water from the municipal water system.  Good circulation and good returns were observed.
 
| Witnessed the cementing of the surface casing.  Casing crew was having difficulties threading pipe together.  Mix water was tested and no chlorides were detected using high and low range Quantabs.  They are using water from the municipal water system.  Good circulation and good returns were observed.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1371553027
 
| 1371553027
 
| 2013-06-17
 
| 2013-06-17
|
+
|  
 
| Total depth at the time of inspection was 5534 ft.  Rig crew was tripping out of the Queenston.  They had a tight spot, and a small loss of circulation.  They were mixing a pill to remedy this.
 
| Total depth at the time of inspection was 5534 ft.  Rig crew was tripping out of the Queenston.  They had a tight spot, and a small loss of circulation.  They were mixing a pill to remedy this.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1372332264
 
| 1372332264
 
| 2013-06-26
 
| 2013-06-26
|
+
|  
 
| Status check on drilling rig.  Total depth at the time of inspection was 10,116 ft.  The azimuth of the horizontal hole was 307.48 degrees with an inclination of 91.26 degrees.  There is a third party gas show.  Spoke with company man Larry Howell.
 
| Status check on drilling rig.  Total depth at the time of inspection was 10,116 ft.  The azimuth of the horizontal hole was 307.48 degrees with an inclination of 91.26 degrees.  There is a third party gas show.  Spoke with company man Larry Howell.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1372763319
 
| 1372763319
 
| 2013-06-27
 
| 2013-06-27
|
+
|  
 
| Total measured depth at the time of inspection was 12204 ft.  The inclination of the lateral was 90.23 degrees and the Azimuth was 326.38 degrees. The well had 3rd party gas shows.  Spoke with company man Larry Howell.
 
| Total measured depth at the time of inspection was 12204 ft.  The inclination of the lateral was 90.23 degrees and the Azimuth was 326.38 degrees. The well had 3rd party gas shows.  Spoke with company man Larry Howell.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1377777545
 
| 1377777545
 
| 2013-08-28
 
| 2013-08-28
|
+
|  
 
| Witnessed stimulation operations on this well.  Company was fracing stage 20 out of 33.  The break down pressure was 8560.  The company man for PDC stated that the formation has been treating at low pressures and rates.
 
| Witnessed stimulation operations on this well.  Company was fracing stage 20 out of 33.  The break down pressure was 8560.  The company man for PDC stated that the formation has been treating at low pressures and rates.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1378737050
 
| 1378737050
 
| 2013-09-09
 
| 2013-09-09
|
+
|  
 
| Coiled tubing unit is on site.  Company is preparing to drill out plugs that were used for well stimulation.  Spoke with representative from both Spartan, and PDC. Production tanks have been set for this well at the GPS point listed.  There are 4 210 barrel tanks an above ground steel impoundment with a liner.
 
| Coiled tubing unit is on site.  Company is preparing to drill out plugs that were used for well stimulation.  Spoke with representative from both Spartan, and PDC. Production tanks have been set for this well at the GPS point listed.  There are 4 210 barrel tanks an above ground steel impoundment with a liner.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1399732939
 
| 1399732939
 
| 2014-04-07
 
| 2014-04-07
|
+
|  
 
| Well has been completed with a pumping unit, electric motor, tubing and rods.  Well was pumping at the time of inspection.  No pollution or contamination was observed.  Vegetation has been established on the site.  No erosion was observed as a result of the pad construction.  Preliminary restoration passed.
 
| Well has been completed with a pumping unit, electric motor, tubing and rods.  Well was pumping at the time of inspection.  No pollution or contamination was observed.  Vegetation has been established on the site.  No erosion was observed as a result of the pad construction.  Preliminary restoration passed.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1552048302
 +
| 2013-09-30
 +
|
 +
| Witnessed the snubbing of tubing in this well.  Spoke with contractors on site.  They didn't give me an exact number as to how much tubing was being ran.  There was 400-500 psi of pressure on the well.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1631728575
 
| 1631728575
 
| 2013-08-13
 
| 2013-08-13
|
+
|  
 
| Witnessed stimulation operations for this well.  I witnessed the perforations being shot for the 3rd stage.  Spoke with PDC company man on site.
 
| Witnessed stimulation operations for this well.  I witnessed the perforations being shot for the 3rd stage.  Spoke with PDC company man on site.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1775208680
 
| 1775208680
 
| 2013-07-11
 
| 2013-07-11
|
+
|  
 
| New GPS point obtained for well.  Above ground frac water containment is being constructed.  All drilling equipment has been removed from site.  There is no tank pad at this time.
 
| New GPS point obtained for well.  Above ground frac water containment is being constructed.  All drilling equipment has been removed from site.  There is no tank pad at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1915856317
 
| 1915856317
 
| 2013-06-30
 
| 2013-06-30
|
+
|  
 
| Witnessed the cementing of the 5.5 inch casing.  13052 feet of casing was ran.  Top of cement should be 1000 feet inside the 9.625 inch casing.  All drilling mud was circulated out of the well bore.  Circulation was achieved throughout the job.
 
| Witnessed the cementing of the 5.5 inch casing.  13052 feet of casing was ran.  Top of cement should be 1000 feet inside the 9.625 inch casing.  All drilling mud was circulated out of the well bore.  Circulation was achieved throughout the job.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 234507288
 
| 234507288
 
| 2013-05-30
 
| 2013-05-30
|
+
|  
 
| Witnessed the cementing of the conductor.  102 ft. of 36 in. hole was drilled.  100 ft. of 30 in. conductor was ran and cemented to surface.  Circulation and cement returns were observed.
 
| Witnessed the cementing of the conductor.  102 ft. of 36 in. hole was drilled.  100 ft. of 30 in. conductor was ran and cemented to surface.  Circulation and cement returns were observed.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2698272
 +
| 2013-08-20
 +
|
 +
| Frac crew had their iron disconnected from the well head.  They had sanded off and were waiting on a coiled tubing unit to clean it out so that they could resume stimulation operations.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 422340470
 
| 422340470
 
| 2013-08-12
 
| 2013-08-12
|
+
|  
 
| Company is preparing for stimulation operations on this well.  I witnessed the perforation gun being pumped down for the first stage.  It sat down 600 ft. from the target.  There was a susupected high spot in the wireline.  Wireline company will change out flow tubes.
 
| Company is preparing for stimulation operations on this well.  I witnessed the perforation gun being pumped down for the first stage.  It sat down 600 ft. from the target.  There was a susupected high spot in the wireline.  Wireline company will change out flow tubes.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -492960486
 +
| 2013-09-09
 +
|
 +
| Company is getting ready to drill plugs out with coiled tubing.  Spoke with company men from Spartan and PDC.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 673779158
 
| 673779158
 
| 2013-06-11
 
| 2013-06-11
|
+
|  
 
| Total depth of well was 1982 ft.  Rig crew was pulling drill pipe out of the hole in preparation for running 13.375 in. pipe (the first intermitten string).
 
| Total depth of well was 1982 ft.  Rig crew was pulling drill pipe out of the hole in preparation for running 13.375 in. pipe (the first intermitten string).
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 06:38, 15 July 2015

Well Details

Well ID: 34-167-29725
Loading map...
County: Washington
Municipality:
Operator Name: PDC ENERGY INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-05-30
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.53241021
Longitude: -81.67688474

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 24222.0 3061.0
2014-1 24465.0 42.0 1935.0 42.0
2014-2 22454.0 91.0 1413.0 91.0
2014-3 14851.0 85.0 873.0 85.0
2014-4 16005.0 85.0 938.0 85.0
2015-1 14388.0 90.0 779.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1043830877 2013-05-29 Witnessed the spudding of the conductor hole. Express was performing the work. Met with Mr. Don Kreager on site. The hole is 36 in. in diameter.
-1161852430 2013-08-26 Stopped by to check out how the stimulation operation was going with the accompaniment of Mr. Rick Cisler and Mr. Kenny Brown. Spoke with company man from PDC. He stated that they had screened off twice and had to fish a perf gun out of the hole.
-1188711777 2013-06-11 Witnessed the 13.375 in casing being cemented. The depth of the hole is 1982 ft. 1945 ft of pipe was ran in the hole. Good circulation and good returns were observed.
1371053677 2013-06-08 Witnessed the cementing of the surface casing. Casing crew was having difficulties threading pipe together. Mix water was tested and no chlorides were detected using high and low range Quantabs. They are using water from the municipal water system. Good circulation and good returns were observed.
1371553027 2013-06-17 Total depth at the time of inspection was 5534 ft. Rig crew was tripping out of the Queenston. They had a tight spot, and a small loss of circulation. They were mixing a pill to remedy this.
1372332264 2013-06-26 Status check on drilling rig. Total depth at the time of inspection was 10,116 ft. The azimuth of the horizontal hole was 307.48 degrees with an inclination of 91.26 degrees. There is a third party gas show. Spoke with company man Larry Howell.
1372763319 2013-06-27 Total measured depth at the time of inspection was 12204 ft. The inclination of the lateral was 90.23 degrees and the Azimuth was 326.38 degrees. The well had 3rd party gas shows. Spoke with company man Larry Howell.
1377777545 2013-08-28 Witnessed stimulation operations on this well. Company was fracing stage 20 out of 33. The break down pressure was 8560. The company man for PDC stated that the formation has been treating at low pressures and rates.
1378737050 2013-09-09 Coiled tubing unit is on site. Company is preparing to drill out plugs that were used for well stimulation. Spoke with representative from both Spartan, and PDC. Production tanks have been set for this well at the GPS point listed. There are 4 210 barrel tanks an above ground steel impoundment with a liner.
1399732939 2014-04-07 Well has been completed with a pumping unit, electric motor, tubing and rods. Well was pumping at the time of inspection. No pollution or contamination was observed. Vegetation has been established on the site. No erosion was observed as a result of the pad construction. Preliminary restoration passed.
-1552048302 2013-09-30 Witnessed the snubbing of tubing in this well. Spoke with contractors on site. They didn't give me an exact number as to how much tubing was being ran. There was 400-500 psi of pressure on the well.
1631728575 2013-08-13 Witnessed stimulation operations for this well. I witnessed the perforations being shot for the 3rd stage. Spoke with PDC company man on site.
1775208680 2013-07-11 New GPS point obtained for well. Above ground frac water containment is being constructed. All drilling equipment has been removed from site. There is no tank pad at this time.
1915856317 2013-06-30 Witnessed the cementing of the 5.5 inch casing. 13052 feet of casing was ran. Top of cement should be 1000 feet inside the 9.625 inch casing. All drilling mud was circulated out of the well bore. Circulation was achieved throughout the job.
234507288 2013-05-30 Witnessed the cementing of the conductor. 102 ft. of 36 in. hole was drilled. 100 ft. of 30 in. conductor was ran and cemented to surface. Circulation and cement returns were observed.
-2698272 2013-08-20 Frac crew had their iron disconnected from the well head. They had sanded off and were waiting on a coiled tubing unit to clean it out so that they could resume stimulation operations.
422340470 2013-08-12 Company is preparing for stimulation operations on this well. I witnessed the perforation gun being pumped down for the first stage. It sat down 600 ft. from the target. There was a susupected high spot in the wireline. Wireline company will change out flow tubes.
-492960486 2013-09-09 Company is getting ready to drill plugs out with coiled tubing. Spoke with company men from Spartan and PDC.
673779158 2013-06-11 Total depth of well was 1982 ft. Rig crew was pulling drill pipe out of the hole in preparation for running 13.375 in. pipe (the first intermitten string).

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.