X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23085"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23085
 
| Well ID: 34-153-23085
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.1054473362, -81.5883439029 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.10543465, -81.58851726 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Summit County, Ohio|Summit]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GONZOIL INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2009-07-21
 
| Spud Date: 2009-07-21
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.1054473362
+
| Latitude: 41.10543465
 
|-
 
|-
| Longitude: -81.5883439029
+
| Longitude: -81.58851726
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 24994.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 706.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 23157.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 426.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 19560.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 320.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 16486.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 319.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 12195.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 210.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 103:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1177193682
 
| -1177193682
 
| 2009-07-30
 
| 2009-07-30
|
+
|  
 
| Dailey Exavating and ChemTech were on site to solidify the drilling pits.
 
| Dailey Exavating and ChemTech were on site to solidify the drilling pits.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -723516391
 
| 2009-07-22
 
|
 
| Wildcat is drilling ahead. The drilling pits are fenced, lined and in good condition. No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| -801815174
 
| 2010-04-20
 
|
 
| Preliminary restoration is approved.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1248890429
 
| 1248890429
 
| 2009-07-21
 
| 2009-07-21
|
+
|  
 
| Wildcat will be drilling later this morning and should be ready to set surface casing later tonight. The shale pit liner has been cut by demolition debris in the pit and will be replaced before drilling begins.
 
| Wildcat will be drilling later this morning and should be ready to set surface casing later tonight. The shale pit liner has been cut by demolition debris in the pit and will be replaced before drilling begins.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1249394434
 
| 1249394434
 
| 2009-07-28
 
| 2009-07-28
|
+
|  
 
| The drilling pits are fenced, lined and in good condition. They are also being pumped down prior to solidification which is scheduled for 7/30.
 
| The drilling pits are fenced, lined and in good condition. They are also being pumped down prior to solidification which is scheduled for 7/30.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1259080617
 
| 1259080617
 
| 2009-11-17
 
| 2009-11-17
|
+
|  
 
| The well is in production and the affected areas have been seeded andmulched and are growing. Preliminary restoration should be approved by early spring at the latest.
 
| The well is in production and the affected areas have been seeded andmulched and are growing. Preliminary restoration should be approved by early spring at the latest.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 142856789
 
| 142856789
 
| 2009-07-15
 
| 2009-07-15
|
+
|  
 
| The location is built and waiting for Wildcat Drilling. The rig is scheduled to move on 7/20.
 
| The location is built and waiting for Wildcat Drilling. The rig is scheduled to move on 7/20.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -723516391
 +
| 2009-07-22
 +
|
 +
| Wildcat is drilling ahead. The drilling pits are fenced, lined and in good condition. No violations at this time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -801815174
 +
| 2010-04-20
 +
|
 +
| Preliminary restoration is approved.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 908930517
 
| 908930517
 
| 2009-08-13
 
| 2009-08-13
|
+
|  
 
| The well has been fraced and the site has been rough graded. Tank battery equipment is being delivered.
 
| The well has been fraced and the site has been rough graded. Tank battery equipment is being delivered.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 06:40, 15 July 2015

Well Details

Well ID: 34-153-23085
Loading map...
County: Summit
Municipality:
Operator Name: GONZOIL INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2009-07-21
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.10543465
Longitude: -81.58851726

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 24994.0 706.0
2011-0 23157.0 426.0
2012-0 19560.0 320.0
2013-0 16486.0 319.0
2014-0 12195.0 365.0 210.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1177193682 2009-07-30 Dailey Exavating and ChemTech were on site to solidify the drilling pits.
1248890429 2009-07-21 Wildcat will be drilling later this morning and should be ready to set surface casing later tonight. The shale pit liner has been cut by demolition debris in the pit and will be replaced before drilling begins.
1249394434 2009-07-28 The drilling pits are fenced, lined and in good condition. They are also being pumped down prior to solidification which is scheduled for 7/30.
1259080617 2009-11-17 The well is in production and the affected areas have been seeded andmulched and are growing. Preliminary restoration should be approved by early spring at the latest.
142856789 2009-07-15 The location is built and waiting for Wildcat Drilling. The rig is scheduled to move on 7/20.
-723516391 2009-07-22 Wildcat is drilling ahead. The drilling pits are fenced, lined and in good condition. No violations at this time.
-801815174 2010-04-20 Preliminary restoration is approved.
908930517 2009-08-13 The well has been fraced and the site has been rough graded. Tank battery equipment is being delivered.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.