If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-153-23085 | | Well ID: 34-153-23085 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.10543465, -81.58851726 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Summit County, Ohio|Summit]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[GONZOIL INC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2009-07-21 | | Spud Date: 2009-07-21 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.10543465 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.58851726 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2010-0 | ||
+ | | style="text-align:right;" | 24994.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 706.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-0 | ||
+ | | style="text-align:right;" | 23157.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 426.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 19560.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 320.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 16486.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 319.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 12195.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 210.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 103: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1177193682 | | -1177193682 | ||
| 2009-07-30 | | 2009-07-30 | ||
− | | | + | | |
| Dailey Exavating and ChemTech were on site to solidify the drilling pits. | | Dailey Exavating and ChemTech were on site to solidify the drilling pits. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1248890429 | | 1248890429 | ||
| 2009-07-21 | | 2009-07-21 | ||
− | | | + | | |
| Wildcat will be drilling later this morning and should be ready to set surface casing later tonight. The shale pit liner has been cut by demolition debris in the pit and will be replaced before drilling begins. | | Wildcat will be drilling later this morning and should be ready to set surface casing later tonight. The shale pit liner has been cut by demolition debris in the pit and will be replaced before drilling begins. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1249394434 | | 1249394434 | ||
| 2009-07-28 | | 2009-07-28 | ||
− | | | + | | |
| The drilling pits are fenced, lined and in good condition. They are also being pumped down prior to solidification which is scheduled for 7/30. | | The drilling pits are fenced, lined and in good condition. They are also being pumped down prior to solidification which is scheduled for 7/30. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1259080617 | | 1259080617 | ||
| 2009-11-17 | | 2009-11-17 | ||
− | | | + | | |
| The well is in production and the affected areas have been seeded andmulched and are growing. Preliminary restoration should be approved by early spring at the latest. | | The well is in production and the affected areas have been seeded andmulched and are growing. Preliminary restoration should be approved by early spring at the latest. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 142856789 | | 142856789 | ||
| 2009-07-15 | | 2009-07-15 | ||
− | | | + | | |
| The location is built and waiting for Wildcat Drilling. The rig is scheduled to move on 7/20. | | The location is built and waiting for Wildcat Drilling. The rig is scheduled to move on 7/20. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -723516391 | ||
+ | | 2009-07-22 | ||
+ | | | ||
+ | | Wildcat is drilling ahead. The drilling pits are fenced, lined and in good condition. No violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -801815174 | ||
+ | | 2010-04-20 | ||
+ | | | ||
+ | | Preliminary restoration is approved. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 908930517 | | 908930517 | ||
| 2009-08-13 | | 2009-08-13 | ||
− | | | + | | |
| The well has been fraced and the site has been rough graded. Tank battery equipment is being delivered. | | The well has been fraced and the site has been rough graded. Tank battery equipment is being delivered. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-153-23085 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.10543465,"lon":-81.58851726,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: GONZOIL INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-07-21 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.10543465 | |
Longitude: -81.58851726 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 24994.0 | 706.0 | ||||
2011-0 | 23157.0 | 426.0 | ||||
2012-0 | 19560.0 | 320.0 | ||||
2013-0 | 16486.0 | 319.0 | ||||
2014-0 | 12195.0 | 365.0 | 210.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1177193682 | 2009-07-30 | Dailey Exavating and ChemTech were on site to solidify the drilling pits. | ||||
1248890429 | 2009-07-21 | Wildcat will be drilling later this morning and should be ready to set surface casing later tonight. The shale pit liner has been cut by demolition debris in the pit and will be replaced before drilling begins. | ||||
1249394434 | 2009-07-28 | The drilling pits are fenced, lined and in good condition. They are also being pumped down prior to solidification which is scheduled for 7/30. | ||||
1259080617 | 2009-11-17 | The well is in production and the affected areas have been seeded andmulched and are growing. Preliminary restoration should be approved by early spring at the latest. | ||||
142856789 | 2009-07-15 | The location is built and waiting for Wildcat Drilling. The rig is scheduled to move on 7/20. | ||||
-723516391 | 2009-07-22 | Wildcat is drilling ahead. The drilling pits are fenced, lined and in good condition. No violations at this time. | ||||
-801815174 | 2010-04-20 | Preliminary restoration is approved. | ||||
908930517 | 2009-08-13 | The well has been fraced and the site has been rough graded. Tank battery equipment is being delivered. |
For data sources see[2]