X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-019-21850"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-019-21850
 
| Well ID: 34-019-21850
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.6713017258, -80.940593905 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.67130173, -80.94059391 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Carroll County, Ohio|Carroll]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[NORTHWOOD ENERGY CORP]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 1997-03-13
 
| Spud Date: 1997-03-13
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Plugged and Abandoned
 
|-
 
|-
| Violations: 2
+
| Violations: 0
 
|-
 
|-
| Latitude: 40.6713017258
+
| Latitude: 40.67130173
 
|-
 
|-
| Longitude: -80.940593905
+
| Longitude: -80.94059391
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 1997-0
 +
| style="text-align:right;" | 6482.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2000-0
 +
| style="text-align:right;" | 4973.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2001-0
 +
| style="text-align:right;" | 4763.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2002-0
 +
| style="text-align:right;" | 158.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2003-0
 +
| style="text-align:right;" | 350.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2004-0
 +
| style="text-align:right;" | 44.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2005-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 139:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1112615752
 +
| 2005-04-01
 +
|
 +
| On site to witness the bottom hole plug ; Roserun / Beekmantown formation . Plug from 9108' to 8731 ' with 30 sks. Class A cement , Petroset Cementing . Should be ready to finish plugging the well at the end of next week or the beginning of the following week .
 +
|
 +
|
 +
| Phone Call
 +
|-
 +
|-
 +
| 1112615752
 +
| 2005-04-01
 +
|
 +
| On site to witness the bottom hole plug ; Roserun / Beekmantown formation . Plug from 9108' to 8731 ' with 30 sks. Class A cement , Petroset Cementing . Should be ready to finish plugging the well at the end of next week or the beginning of the following week .
 +
|
 +
|
 +
| Compliance Notice
 +
|-
 +
|-
 +
| 1115288488
 +
| 2005-05-04
 +
|
 +
| They are still tryingto pull the 8 5/8 casing . The have about 3000' of 8 5/8 casing out of the well so far . They are fishing for the other 1200' with a casing spear and tubing . Earl Barnes advised that it would probably be sometime next week before they would be finished fishing out the casing and running tubing back into the well to finish plugging the well.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1117437473
 
| -1117437473
 
| 2005-04-28
 
| 2005-04-28
|
+
|  
| Inspection revealed that they are pulling the 8 5/8" casing . They should have the approximately 3000' of casing out of the hole by the end of this week or early next week . I'll check the site again next week to check on the status of the plug job . They need to go back in after they get the first 3000' of casing and fish out another 1200' of casing that is stuck in the wellbore.
+
| Inspection revealed that they are pulling the 8 5/8 casing . They should have the approximately 3000' of casing out of the hole by the end of this week or early next week . I'll check the site again next week to check on the status of the plug job . They need to go back in after they get the first 3000' of casing and fish out another 1200' of casing that is stuck in the wellbore.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1288630841
 +
| 2010-09-14
 +
|
 +
| On site with Earl Bryan (landowner). He advised that the well has been idle for quite some time. The inspection revealed that the well head consists of a gate valve on top of the tubing. There is a gas meter at the well head but it is not hooked up. There is no flowline hooked to the wellhead at this time. Inspection of the tank battery revealed a one hundred barrel oil storage tank and no identification sign posted at either the well head or tank battery. I advised Mr. Bryan that the Division has to give the operator the option of either plugging or producing the well. I also advised him about the procedure the Division has to follow to obtain compliance. I contacted Northwood Energy and left a message (verbal compliance notice) that they needed to plug or produce the well by October 20th, 2010. RBDMS revealed that the last reported production was in 2005.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1313890817
 
| -1313890817
 
| 2005-03-28
 
| 2005-03-28
|
+
|  
 
+
| On site to witness the bottom hole plug .  Nobody on location at this time . I noticed that they didn
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1403872781
 
| -1403872781
 
| 2005-05-16
 
| 2005-05-16
|
+
|  
| Inspection revealed that the service rig is fishing for parted tubing . On last Friday while trying to fish for the 8 5/8" casing the tubing parted approximately 18 joints down . The service rig went in with fishing tools earlier today , but couldn't get ahold of the tubing . They tripped out the tools and ran back in with other fishing tools in an attempt to get ahold of the tubing . They have decided to try to get ahold of the tubing and try to release the 8 5/8" casing spear and bring it out of the hole . After getting the spear out , they are going back into the hole with tubing to finish plugging the well . The operator has decided to leave the rest of the 8 5/8" casing in the well .
+
| Inspection revealed that the service rig is fishing for parted tubing . On last Friday while trying to fish for the 8 5/8 casing the tubing parted approximately 18 joints down . The service rig went in with fishing tools earlier today , but couldn't get ahold of the tubing . They tripped out the tools and ran back in with other fishing tools in an attempt to get ahold of the tubing . They have decided to try to get ahold of the tubing and try to release the 8 5/8 casing spear and bring it out of the hole . After getting the spear out , they are going back into the hole with tubing to finish plugging the well . The operator has decided to leave the rest of the 8 5/8 casing in the well .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1425471104
 
| -1425471104
 
| 2005-04-19
 
| 2005-04-19
|
+
|  
| Inspection revealed that the service rig is still trying to pull the 8 5/8" casing . They are having trouble pulling the 8 5/8" casing .  No violations at this time .
+
| Inspection revealed that the service rig is still trying to pull the 8 5/8 casing . They are having trouble pulling the 8 5/8 casing .  No violations at this time .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1598362060
 
| -1598362060
 
| 2005-04-27
 
| 2005-04-27
|
+
|  
| Inspection revealed that the service rig is still pulling the 8 5/8" casing . Nobody from the rig crew or operator on location this morning ; rig shut down .
+
| Inspection revealed that the service rig is still pulling the 8 5/8 casing . Nobody from the rig crew or operator on location this morning ; rig shut down .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1623209466
 
| -1623209466
 
| 2010-11-01
 
| 2010-11-01
|
+
|  
| Inspection revealed that the well is idle. The well head consists of a gate valve on top of the tubbing. There is no flowline attached to the well head at this time. There is a meter at the well head that is not hooked up either. The tank battery consists of a one hundred barrel oil storage tank. There is no identification posted at either the well head or the tank battery at this time. I spoke with Bill ( Northwood Energy 614-457-1024) and advised him that the well is idle and that I was going to send Northwood Energy a Compliance Notice today to either plug or produce the well. He advised that he spoke with Chip Smith (ChipCo) last week and that he is moving his service rig onto the Toalston well and then he is moving onto the Bryan well after that. He advised, that Chip Smith advised him that they had to finish working on the rig and then he would move onto these wells. They are going to conduct a mini-frac on this well and see if that will stimulate the well. He advised that if this mini-frac is not successful, then they will probably plug the well at that time. I am giving a remedial action date of December 6th,2010 for the Compliance Notice.
+
| Inspection revealed that the well is idle. The well head consists of a gate valve on top of the tubbing. There is no flowline attached to the well head at this time. There is a meter at the well head that is not hooked up either. The tank battery consists of a one hundred barrel oil storage tank. There is no identification posted at either the well head or the tank battery at this time. I spoke with Bill ( Northwood Energy 614-457-1024) and advised him that the well is idle and that I was going to send Northwood Energy a Compliance Notice today to either plug or produce the well. He advised that he spoke with Chip Smith (ChipCo) last week and that he is moving his service rig onto the Toalston well and then he is moving onto the Bryan well after that. He advised, that Chip Smith advised him that they had to finish working on the rig and then he would move onto these wells. They are going to conduct a mini-frac on this well and see if that will stimulate the well. He advised that if this mini-frac is not successful, then they will probably plug the well at that time. I am giving a remedial action date of December 6th,2010 for the Compliance Notice.
|
+
|  
| NONE
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1991929595
 
| -1991929595
 
| 2005-05-18
 
| 2005-05-18
|
+
|  
| Inspection revealed that the tubing is still in the well . It appears that they are still fishing for the 8 5/8" casing . There is nobody on location at this time (7:00am) . I will return to the location later today to see if the rig crew is on site and to see what progress the rig has made in fishing out the casing . On site later this afternoon (12:30pm) and no rig crew on site at this time . Nobody has been on site today . I will call Earl Barnes ( Northwood Energy) and check on the progress of the fishing job .
+
| Inspection revealed that the tubing is still in the well . It appears that they are still fishing for the 8 5/8 casing . There is nobody on location at this time (7:00am) . I will return to the location later today to see if the rig crew is on site and to see what progress the rig has made in fishing out the casing . On site later this afternoon (12:30pm) and no rig crew on site at this time . Nobody has been on site today . I will call Earl Barnes ( Northwood Energy) and check on the progress of the fishing job .
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1112615752
 
| 2005-04-01
 
|
 
|  On site to witness the bottom hole plug ; Roserun / Beekmantown formation . Plug from 9108' to 8731 ' with 30 sks. Class A cement , Petroset Cementing . Should be ready to finish plugging the well at the end of next week or the beginning of the following week .
 
|
 
|
 
|
 
|-
 
|-
 
| 1115288488
 
| 2005-05-04
 
|
 
|  They are still tryingto pull the 8 5/8" casing . The have about 3000' of 8 5/8" casing out of the well so far . They are fishing for the other 1200' with a casing spear and tubing . Earl Barnes advised that it would probably be sometime next week before they would be finished fishing out the casing and running tubing back into the well to finish plugging the well.
 
|
 
|
 
|
 
|-
 
|-
 
| 1288630841
 
| 2010-09-14
 
|
 
| On site with Earl Bryan (landowner). He advised that the well has been idle for quite some time. The inspection revealed that the well head consists of a gate valve on top of the tubing. There is a gas meter at the well head but it is not hooked up. There is no flowline hooked to the wellhead at this time. Inspection of the tank battery revealed a one hundred barrel oil storage tank and no identification sign posted at either the well head or tank battery. I advised Mr. Bryan that the Division has to give the operator the option of either plugging or producing the well. I also advised him about the procedure the Division has to follow to obtain compliance. I contacted Northwood Energy and left a message (verbal compliance notice) that they needed to plug or produce the well by October 20th, 2010. RBDMS revealed that the last reported production was in 2005.
 
|
 
| NONE
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 709071448
 
| 709071448
 
| 2005-04-21
 
| 2005-04-21
|
+
|  
| Inspection revealed that they are still trying to pull the 8 5/8" casing ; nobody on location at this time . No violations at this time .
+
| Inspection revealed that they are still trying to pull the 8 5/8 casing ; nobody on location at this time . No violations at this time .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 08:11, 15 July 2015

Well Details

Well ID: 34-019-21850
Loading map...
County: Carroll
Municipality:
Operator Name: NORTHWOOD ENERGY CORP
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1997-03-13
Unconventional: No
Configuration: Vertical
Well Status: Plugged and Abandoned
Violations: 0
Latitude: 40.67130173
Longitude: -80.94059391

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1997-0 6482.0 0.0
2000-0 4973.0 0.0
2001-0 4763.0 0.0
2002-0 158.0 0.0
2003-0 350.0 0.0
2004-0 44.0 0.0
2005-0 0.0 0.0
2010-0 0.0 0.0
2011-0 0.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1112615752 2005-04-01 On site to witness the bottom hole plug ; Roserun / Beekmantown formation . Plug from 9108' to 8731 ' with 30 sks. Class A cement , Petroset Cementing . Should be ready to finish plugging the well at the end of next week or the beginning of the following week . Phone Call
1112615752 2005-04-01 On site to witness the bottom hole plug ; Roserun / Beekmantown formation . Plug from 9108' to 8731 ' with 30 sks. Class A cement , Petroset Cementing . Should be ready to finish plugging the well at the end of next week or the beginning of the following week . Compliance Notice
1115288488 2005-05-04 They are still tryingto pull the 8 5/8 casing . The have about 3000' of 8 5/8 casing out of the well so far . They are fishing for the other 1200' with a casing spear and tubing . Earl Barnes advised that it would probably be sometime next week before they would be finished fishing out the casing and running tubing back into the well to finish plugging the well.
-1117437473 2005-04-28 Inspection revealed that they are pulling the 8 5/8 casing . They should have the approximately 3000' of casing out of the hole by the end of this week or early next week . I'll check the site again next week to check on the status of the plug job . They need to go back in after they get the first 3000' of casing and fish out another 1200' of casing that is stuck in the wellbore.
1288630841 2010-09-14 On site with Earl Bryan (landowner). He advised that the well has been idle for quite some time. The inspection revealed that the well head consists of a gate valve on top of the tubing. There is a gas meter at the well head but it is not hooked up. There is no flowline hooked to the wellhead at this time. Inspection of the tank battery revealed a one hundred barrel oil storage tank and no identification sign posted at either the well head or tank battery. I advised Mr. Bryan that the Division has to give the operator the option of either plugging or producing the well. I also advised him about the procedure the Division has to follow to obtain compliance. I contacted Northwood Energy and left a message (verbal compliance notice) that they needed to plug or produce the well by October 20th, 2010. RBDMS revealed that the last reported production was in 2005.
-1313890817 2005-03-28 On site to witness the bottom hole plug . Nobody on location at this time . I noticed that they didn
-1403872781 2005-05-16 Inspection revealed that the service rig is fishing for parted tubing . On last Friday while trying to fish for the 8 5/8 casing the tubing parted approximately 18 joints down . The service rig went in with fishing tools earlier today , but couldn't get ahold of the tubing . They tripped out the tools and ran back in with other fishing tools in an attempt to get ahold of the tubing . They have decided to try to get ahold of the tubing and try to release the 8 5/8 casing spear and bring it out of the hole . After getting the spear out , they are going back into the hole with tubing to finish plugging the well . The operator has decided to leave the rest of the 8 5/8 casing in the well .
-1425471104 2005-04-19 Inspection revealed that the service rig is still trying to pull the 8 5/8 casing . They are having trouble pulling the 8 5/8 casing . No violations at this time .
-1598362060 2005-04-27 Inspection revealed that the service rig is still pulling the 8 5/8 casing . Nobody from the rig crew or operator on location this morning ; rig shut down .
-1623209466 2010-11-01 Inspection revealed that the well is idle. The well head consists of a gate valve on top of the tubbing. There is no flowline attached to the well head at this time. There is a meter at the well head that is not hooked up either. The tank battery consists of a one hundred barrel oil storage tank. There is no identification posted at either the well head or the tank battery at this time. I spoke with Bill ( Northwood Energy 614-457-1024) and advised him that the well is idle and that I was going to send Northwood Energy a Compliance Notice today to either plug or produce the well. He advised that he spoke with Chip Smith (ChipCo) last week and that he is moving his service rig onto the Toalston well and then he is moving onto the Bryan well after that. He advised, that Chip Smith advised him that they had to finish working on the rig and then he would move onto these wells. They are going to conduct a mini-frac on this well and see if that will stimulate the well. He advised that if this mini-frac is not successful, then they will probably plug the well at that time. I am giving a remedial action date of December 6th,2010 for the Compliance Notice.
-1991929595 2005-05-18 Inspection revealed that the tubing is still in the well . It appears that they are still fishing for the 8 5/8 casing . There is nobody on location at this time (7:00am) . I will return to the location later today to see if the rig crew is on site and to see what progress the rig has made in fishing out the casing . On site later this afternoon (12:30pm) and no rig crew on site at this time . Nobody has been on site today . I will call Earl Barnes ( Northwood Energy) and check on the progress of the fishing job .
709071448 2005-04-21 Inspection revealed that they are still trying to pull the 8 5/8 casing ; nobody on location at this time . No violations at this time .

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.