X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-139-20760"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-139-20760
 
| Well ID: 34-139-20760
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.5625574612, -82.4610889752 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.56261017, -82.46109663 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Richland County, Ohio|Richland]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GEOPETRO LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2011-08-21
 
| Spud Date: 2011-08-21
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.5625574612
+
| Latitude: 40.56261017
 
|-
 
|-
| Longitude: -82.4610889752
+
| Longitude: -82.46109663
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 1455.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 2130.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 482.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1041114904
 
| -1041114904
 
| 2011-08-25
 
| 2011-08-25
|
+
|  
 
| Inspect drill rig. Drilling. Current depth 2655 feet.
 
| Inspect drill rig. Drilling. Current depth 2655 feet.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1175711591
 +
| 2011-08-22
 +
|
 +
| Set and cement surface casing.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1259839064
 
| -1259839064
 
| 2011-08-15
 
| 2011-08-15
|
+
|  
 
| Inspect location. Pits are being excavated. Rig will be on site within days.
 
| Inspect location. Pits are being excavated. Rig will be on site within days.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1347463013
 +
| 2011-08-29
 +
|
 +
| Inspect drill rig. Completed depth 4411 feet.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -2108060464
 
| -2108060464
 
| 2012-11-01
 
| 2012-11-01
|
+
|  
 
| Inspect well. well is capable of production. Pump jack set on well. One 100 bbl and one 80 bbl tank set in new dike construction.
 
| Inspect well. well is capable of production. Pump jack set on well. One 100 bbl and one 80 bbl tank set in new dike construction.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -2144624687
 
| -2144624687
 
| 2014-06-11
 
| 2014-06-11
|
+
|  
 
| ID posted, location maintained.  The well is in production.  The well has a pump jack on it.  2 tanks and a separator in the tank battery.
 
| ID posted, location maintained.  The well is in production.  The well has a pump jack on it.  2 tanks and a separator in the tank battery.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -243193507
 
| -243193507
 
| 2012-04-12
 
| 2012-04-12
|
+
|  
 
| inspect well. site restoration is complete. Well is shut in. no production equipment.
 
| inspect well. site restoration is complete. Well is shut in. no production equipment.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 274454208
 +
| 2011-08-30
 +
|
 +
| Contacted by operator. Installation of 4.5 inch casing.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -474113030
 
| -474113030
 
| 2012-08-21
 
| 2012-08-21
|
+
|  
 
| Inspect well and location. BiJoe development plugged back well. Bill Mitten set bottom plug. Rip casing at 3824 ft. pull 2 joints, 87.6 ft. set rip plug. Doug Core was on site.
 
| Inspect well and location. BiJoe development plugged back well. Bill Mitten set bottom plug. Rip casing at 3824 ft. pull 2 joints, 87.6 ft. set rip plug. Doug Core was on site.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -482251416
 
| -482251416
 
| 2012-08-28
 
| 2012-08-28
|
+
|  
 
| Inspect well and location. Geopetro hired Bill Mitten to run 4.5 inch long string and cement in place on well that was plugged back. Install 79 joints of Range 2 and 3 4.5 inch used pipe tested with drift of 4.5. Total of 2465 feet, install centralizers at 1st, 5th, and 8th joints.  Cement with 100 sacks of Class A cement by Cementco. Tested water on site PH 8.0 and Temperature of 70 F.
 
| Inspect well and location. Geopetro hired Bill Mitten to run 4.5 inch long string and cement in place on well that was plugged back. Install 79 joints of Range 2 and 3 4.5 inch used pipe tested with drift of 4.5. Total of 2465 feet, install centralizers at 1st, 5th, and 8th joints.  Cement with 100 sacks of Class A cement by Cementco. Tested water on site PH 8.0 and Temperature of 70 F.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1175711591
 
| 2011-08-22
 
|
 
| Set and cement surface casing.
 
|
 
|
 
|
 
|-
 
|-
 
| 1347463013
 
| 2011-08-29
 
|
 
| Inspect drill rig. Completed depth 4411 feet.
 
|
 
|
 
|
 
|-
 
|-
 
| 274454208
 
| 2011-08-30
 
|
 
| Contacted by operator. Installation of 4.5 inch casing.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 771373265
 
| 771373265
 
| 2011-08-22
 
| 2011-08-22
|
+
|  
 
| Inspect drill site. Current depth of 585 feet.
 
| Inspect drill site. Current depth of 585 feet.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 08:39, 15 July 2015

Well Details

Well ID: 34-139-20760
Loading map...
County: Richland
Municipality:
Operator Name: GEOPETRO LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-08-21
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.56261017
Longitude: -82.46109663

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 1455.0 0.0
2013-0 2130.0 0.0
2014-0 482.0 365.0 0.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1041114904 2011-08-25 Inspect drill rig. Drilling. Current depth 2655 feet.
1175711591 2011-08-22 Set and cement surface casing.
-1259839064 2011-08-15 Inspect location. Pits are being excavated. Rig will be on site within days.
1347463013 2011-08-29 Inspect drill rig. Completed depth 4411 feet.
-2108060464 2012-11-01 Inspect well. well is capable of production. Pump jack set on well. One 100 bbl and one 80 bbl tank set in new dike construction.
-2144624687 2014-06-11 ID posted, location maintained. The well is in production. The well has a pump jack on it. 2 tanks and a separator in the tank battery.
-243193507 2012-04-12 inspect well. site restoration is complete. Well is shut in. no production equipment.
274454208 2011-08-30 Contacted by operator. Installation of 4.5 inch casing.
-474113030 2012-08-21 Inspect well and location. BiJoe development plugged back well. Bill Mitten set bottom plug. Rip casing at 3824 ft. pull 2 joints, 87.6 ft. set rip plug. Doug Core was on site.
-482251416 2012-08-28 Inspect well and location. Geopetro hired Bill Mitten to run 4.5 inch long string and cement in place on well that was plugged back. Install 79 joints of Range 2 and 3 4.5 inch used pipe tested with drift of 4.5. Total of 2465 feet, install centralizers at 1st, 5th, and 8th joints. Cement with 100 sacks of Class A cement by Cementco. Tested water on site PH 8.0 and Temperature of 70 F.
771373265 2011-08-22 Inspect drill site. Current depth of 585 feet.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.