X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-059-24190"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-059-24190
 
| Well ID: 34-059-24190
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.8720476441, -81.6838887428 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.87204764, -81.68388874 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Guernsey County, Ohio|Guernsey]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[ANADARKO E & P ONSHORE LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date: 2011-09-26
+
| Spud Date: 2011-11-02
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing:
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.8720476441
+
| Latitude: 39.87204764
 
|-
 
|-
| Longitude: -81.6838887428
+
| Longitude: -81.68388874
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 41153.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 13564.0
 +
|
 +
|-
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 6440.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 283.0
 +
|
 +
|-
 +
|-
 +
| 2013-3
 +
| style="text-align:right;" | 6282.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1538.0
 +
|
 +
|-
 +
|-
 +
| 2013-6
 +
| style="text-align:right;" | 12124.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1042.0
 +
|
 +
|-
 +
|-
 +
| 2013-9
 +
| style="text-align:right;" | 15190.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 763.0
 +
|
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 22709.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 567.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 17291.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 406.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 20376.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 709.0
 +
| style="text-align:right;" | 90.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 130:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1025609309
 
| -1025609309
 
| 2011-10-17
 
| 2011-10-17
|
+
|  
 
| Spud meeting at well site with rig crew and service personnel.
 
| Spud meeting at well site with rig crew and service personnel.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1317069975
 +
| 2011-09-26
 +
|
 +
| Zigenfuess Drilling on site to set conductor and intermediate pipe to 500' should be cementing 16 casing later on in week.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1317411697
 +
| 2011-09-30
 +
|
 +
| Setting 24 casing@360' will possibly set 16 late tomorrow afternoon.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1319491047
 +
| 2011-10-21
 +
|
 +
| On site to witness testing of BOP by Greene's Energy Group.  Annular was tested at @ 3500 PSI and blind ram was tested at @ 5000 PSI.  Pipe ram and choke system were also tested @ 5000 PSI.  All equipment for BOP passed test.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1603889048
 
| -1603889048
 
| 2011-11-21
 
| 2011-11-21
|
+
|  
|
+
|  
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1667347511
 
| -1667347511
 
| 2011-11-21
 
| 2011-11-21
|
+
|  
 
| Total depth was reached at 10,962'.  Will condition wellbore and then log well and possibly run casing later on in the week.
 
| Total depth was reached at 10,962'.  Will condition wellbore and then log well and possibly run casing later on in the week.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1920651845
 
| -1920651845
 
| 2012-02-22
 
| 2012-02-22
|
+
|  
 
| Stopped by drill site for update they were flowing well back into 500 bbl tanks and hauling water to UIC facility for proper disposal.
 
| Stopped by drill site for update they were flowing well back into 500 bbl tanks and hauling water to UIC facility for proper disposal.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -2059153676
 
| -2059153676
 
| 2011-10-12
 
| 2011-10-12
|
+
|  
 
+
| Invited to attend pre-spud meeting held by company
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 33154408
 +
| 2011-09-28
 +
|
 +
| Drilling 24 conductor hole they were@180' they propose to set 200'+- hopefully by tomorrow.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -596583758
 
| -596583758
 
| 2012-02-29
 
| 2012-02-29
|
+
|  
 
| Stopped by site for update they were still flowing well back to 500 bbl storage tanks and also were flaring gas through flare stack.
 
| Stopped by site for update they were still flowing well back to 500 bbl storage tanks and also were flaring gas through flare stack.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -748635310
 
| -748635310
 
| 2014-06-05
 
| 2014-06-05
|
+
|  
 
| On the day of my inspection the site passed preliminary restoration according to 1509.072A.
 
| On the day of my inspection the site passed preliminary restoration according to 1509.072A.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -892561045
 
| -892561045
 
| 2014-06-05
 
| 2014-06-05
|
+
|  
 
| On the day of my inspection the site passed preliminary restoration according to 1509.072A.
 
| On the day of my inspection the site passed preliminary restoration according to 1509.072A.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -95110996
 
| -95110996
 
| 2011-11-22
 
| 2011-11-22
|
+
|  
| Casing crew rigging up to run production casing.  Owner is going to run split string of casing - 4.5" casing through lateral and 5.5" casing in vertical section.  Top of cement will be brought up into the intermediate casing string.
+
| Casing crew rigging up to run production casing.  Owner is going to run split string of casing - 4.5 casing through lateral and 5.5 casing in vertical section.  Top of cement will be brought up into the intermediate casing string.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1317069975
 
| 2011-09-26
 
|
 
| Zigenfuess Drilling on site to set conductor and intermediate pipe to 500' should be cementing 16" casing later on in week.
 
|
 
|
 
|
 
|-
 
|-
 
| 1317411697
 
| 2011-09-30
 
|
 
| Setting 24" casing@360' will possibly set 16" late tomorrow afternoon.
 
|
 
|
 
|
 
|-
 
|-
 
| 1319491047
 
| 2011-10-21
 
|
 
| On site to witness testing of BOP by Greene's Energy Group.  Annular was tested at @ 3500 PSI and blind ram was tested at @ 5000 PSI.  Pipe ram and choke system were also tested @ 5000 PSI.  All equipment for BOP passed test.
 
|
 
|
 
|
 
|-
 
|-
 
| 33154408
 
| 2011-09-28
 
|
 
| Drilling 24" conductor hole they were@180' they propose to set 200'+- hopefully by tomorrow.
 
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 07:41, 15 July 2015

Well Details

Well ID: 34-059-24190
Loading map...
County: Guernsey
Municipality:
Operator Name: ANADARKO E & P ONSHORE LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-11-02
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.87204764
Longitude: -81.68388874

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 41153.0 13564.0
2013-12 6440.0 283.0
2013-3 6282.0 1538.0
2013-6 12124.0 1042.0
2013-9 15190.0 763.0
2014-3 22709.0 92.0 567.0 92.0
2014-4 17291.0 92.0 406.0 92.0
2015-1 20376.0 90.0 709.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1025609309 2011-10-17 Spud meeting at well site with rig crew and service personnel.
1317069975 2011-09-26 Zigenfuess Drilling on site to set conductor and intermediate pipe to 500' should be cementing 16 casing later on in week.
1317411697 2011-09-30 Setting 24 casing@360' will possibly set 16 late tomorrow afternoon.
1319491047 2011-10-21 On site to witness testing of BOP by Greene's Energy Group. Annular was tested at @ 3500 PSI and blind ram was tested at @ 5000 PSI. Pipe ram and choke system were also tested @ 5000 PSI. All equipment for BOP passed test.
-1603889048 2011-11-21
-1667347511 2011-11-21 Total depth was reached at 10,962'. Will condition wellbore and then log well and possibly run casing later on in the week.
-1920651845 2012-02-22 Stopped by drill site for update they were flowing well back into 500 bbl tanks and hauling water to UIC facility for proper disposal.
-2059153676 2011-10-12 Invited to attend pre-spud meeting held by company
33154408 2011-09-28 Drilling 24 conductor hole they were@180' they propose to set 200'+- hopefully by tomorrow.
-596583758 2012-02-29 Stopped by site for update they were still flowing well back to 500 bbl storage tanks and also were flaring gas through flare stack.
-748635310 2014-06-05 On the day of my inspection the site passed preliminary restoration according to 1509.072A.
-892561045 2014-06-05 On the day of my inspection the site passed preliminary restoration according to 1509.072A.
-95110996 2011-11-22 Casing crew rigging up to run production casing. Owner is going to run split string of casing - 4.5 casing through lateral and 5.5 casing in vertical section. Top of cement will be brought up into the intermediate casing string.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.