If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-153-23129 | | Well ID: 34-153-23129 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.92233561, -81.56327362 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Summit County, Ohio|Summit]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[DOMINION EAST OHIO]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2011-10-12 | | Spud Date: 2011-10-12 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Storage Well |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.92233561 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.56327362 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1018391835 | | -1018391835 | ||
| 2012-04-11 | | 2012-04-11 | ||
− | | | + | | |
| Daley Excavating was on site to work on preliminary restoration grading and seeding. The tank battery has been set and the well is connected to the Dominion system. Per the landowners request, the pit area is being lowered and the excavated material is being disposed at the Butcher & Son C&D Landfill. No violations at this time. | | Daley Excavating was on site to work on preliminary restoration grading and seeding. The tank battery has been set and the well is connected to the Dominion system. Per the landowners request, the pit area is being lowered and the excavated material is being disposed at the Butcher & Son C&D Landfill. No violations at this time. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1320090496 | | 1320090496 | ||
| 2011-10-20 | | 2011-10-20 | ||
− | | | + | | |
| After setting surface casing on 10/15, Kilbarger Drilling Rig 17 was out 7 degrees at 1769 feet. Universal was called out and plugged back to the bottom of surface casing with 150 sacks of Class A with 3% calcium chloride. The plug was spotted with open ended drill pipe. After waiting 24 hours, Kilbarger went back in the hole with a drill bit. At a depth of 1421 feet, they were drilling in cement. Universal was called again and plugged back a second time with 125 sack of Class A with 3% calcium chloride which placed the plug inside surface casing. Again after waiting 24 hours, Kilbarger went in with a bit and again was drilling in cement. At this time, Dominion called in directional steering tools to get the hole back to vertical. | | After setting surface casing on 10/15, Kilbarger Drilling Rig 17 was out 7 degrees at 1769 feet. Universal was called out and plugged back to the bottom of surface casing with 150 sacks of Class A with 3% calcium chloride. The plug was spotted with open ended drill pipe. After waiting 24 hours, Kilbarger went back in the hole with a drill bit. At a depth of 1421 feet, they were drilling in cement. Universal was called again and plugged back a second time with 125 sack of Class A with 3% calcium chloride which placed the plug inside surface casing. Again after waiting 24 hours, Kilbarger went in with a bit and again was drilling in cement. At this time, Dominion called in directional steering tools to get the hole back to vertical. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1320091875 | | 1320091875 | ||
| 2011-10-24 | | 2011-10-24 | ||
− | | | + | | |
| Kilbarger is drilling ahead at 1800' on this storage well. The pits are fenced, lined and in good condition. | | Kilbarger is drilling ahead at 1800' on this storage well. The pits are fenced, lined and in good condition. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1321365925 | | 1321365925 | ||
| 2011-11-07 | | 2011-11-07 | ||
− | | | + | | |
| Dailey Excavating and Chem Tech were on site to solidify and close the drilling pits. The landowner, Bob Joecken, called with concerns as to the cover thickness. This inspection found the east end of the drilling pits were temporarily higher than the surrounding grade. After the solidification process is complete, Dominion will remove any material necessary to achieve the appropriate grade with sufficient cover. No violation. | | Dailey Excavating and Chem Tech were on site to solidify and close the drilling pits. The landowner, Bob Joecken, called with concerns as to the cover thickness. This inspection found the east end of the drilling pits were temporarily higher than the surrounding grade. After the solidification process is complete, Dominion will remove any material necessary to achieve the appropriate grade with sufficient cover. No violation. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1619587869 | ||
+ | | 2013-03-01 | ||
+ | | | ||
+ | | I inspected Dominion East Ohio Gas storage well # 3938 today. The well is located in Section 35, Franklin Township, Summit County, Ohio. The well is equipped with a master gate, a side gate with a 4.00 Daniel's run plumbed into the main pipeline. There is a flow gate with a 3.00 line plumbed into a 100 BBL storage tank. All lids and hatches are closed and secured. There are two (2) pickup lines mounted on the storage tank and they are secured with valves and bullhead plugs in place. The well is identified with a clear, legibly marked well identification sign mounted on the storage tank. No violations found. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1637056169 | | 1637056169 | ||
| 2011-10-12 | | 2011-10-12 | ||
− | | | + | | |
| Kilbarger Drilling Rig 17 will spud this storage well later today. The drilling pits are fence, lined and in good condition. The required signage is posted at the lease entrance. | | Kilbarger Drilling Rig 17 will spud this storage well later today. The drilling pits are fence, lined and in good condition. The required signage is posted at the lease entrance. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 1868198946 | ||
+ | | 2014-10-20 | ||
+ | | | ||
+ | | I inspected Dominion East Ohio Gas storage well #3938. The well is equipped with a master gate valve and a side gate valve that were inspected by a third party company on 9/2014. There was a sales line with a separator. There is a flow gate valve plumbed with a 3.00 line into a 100 BBL storage tank. All lids and hatches on the storage tank are closed and secure. There are two (2) pickup lines on the storage tank and they are secured with valves and bull plugs in place. The tank battery is diked. The well is properly identified with a clear, legibly marked well identification sign mounted on the storage tank. The lease road is stoned and drivable. No violations found. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -571908297 | ||
+ | | 2012-01-18 | ||
+ | | | ||
+ | | Universal is on site to frac the well. They used 60,294 gallons of water; 61,800# 20/40 sand; and 390,000 standard cubic feet of nitrogen. The formation broke at 1,644 psi with an average treating pressure of 2,420 psi at an average rate of 26.2 bpm. Initial shut in pressure was 1,537 psi and five minute shut in pressure was 1,432 psi. Rigged up and started flowback after the job. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 821315154 | | 821315154 | ||
| 2011-11-03 | | 2011-11-03 | ||
− | | | + | | |
| Kilbarger Drilling Rig 17 has moved off location. The pits are lined and fenced but they are full. Pit solidification is scheduled for next week. | | Kilbarger Drilling Rig 17 has moved off location. The pits are lined and fenced but they are full. Pit solidification is scheduled for next week. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 940825890 | | 940825890 | ||
| 2011-10-28 | | 2011-10-28 | ||
− | | | + | | |
| Kilbarger is drilling ahead at 3850'. They should reach total depth (TD) by tomorrow. The pit is fenced, lined and in good condition. It will need to be pumped down to hold the water displaced during cementing. | | Kilbarger is drilling ahead at 3850'. They should reach total depth (TD) by tomorrow. The pit is fenced, lined and in good condition. It will need to be pumped down to hold the water displaced during cementing. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -989128700 | ||
+ | | 2011-07-18 | ||
+ | | | ||
+ | | Dominion has started building the lease road to this storage well location. The entrance is built and trees need to be removed before continuing. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-153-23129 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.92233561,"lon":-81.56327362,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: DOMINION EAST OHIO | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-10-12 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Storage Well | |
Violations: 0 | |
Latitude: 40.92233561 | |
Longitude: -81.56327362 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1018391835 | 2012-04-11 | Daley Excavating was on site to work on preliminary restoration grading and seeding. The tank battery has been set and the well is connected to the Dominion system. Per the landowners request, the pit area is being lowered and the excavated material is being disposed at the Butcher & Son C&D Landfill. No violations at this time. | ||||
1320090496 | 2011-10-20 | After setting surface casing on 10/15, Kilbarger Drilling Rig 17 was out 7 degrees at 1769 feet. Universal was called out and plugged back to the bottom of surface casing with 150 sacks of Class A with 3% calcium chloride. The plug was spotted with open ended drill pipe. After waiting 24 hours, Kilbarger went back in the hole with a drill bit. At a depth of 1421 feet, they were drilling in cement. Universal was called again and plugged back a second time with 125 sack of Class A with 3% calcium chloride which placed the plug inside surface casing. Again after waiting 24 hours, Kilbarger went in with a bit and again was drilling in cement. At this time, Dominion called in directional steering tools to get the hole back to vertical. | ||||
1320091875 | 2011-10-24 | Kilbarger is drilling ahead at 1800' on this storage well. The pits are fenced, lined and in good condition. | ||||
1321365925 | 2011-11-07 | Dailey Excavating and Chem Tech were on site to solidify and close the drilling pits. The landowner, Bob Joecken, called with concerns as to the cover thickness. This inspection found the east end of the drilling pits were temporarily higher than the surrounding grade. After the solidification process is complete, Dominion will remove any material necessary to achieve the appropriate grade with sufficient cover. No violation. | ||||
-1619587869 | 2013-03-01 | I inspected Dominion East Ohio Gas storage well # 3938 today. The well is located in Section 35, Franklin Township, Summit County, Ohio. The well is equipped with a master gate, a side gate with a 4.00 Daniel's run plumbed into the main pipeline. There is a flow gate with a 3.00 line plumbed into a 100 BBL storage tank. All lids and hatches are closed and secured. There are two (2) pickup lines mounted on the storage tank and they are secured with valves and bullhead plugs in place. The well is identified with a clear, legibly marked well identification sign mounted on the storage tank. No violations found. | ||||
1637056169 | 2011-10-12 | Kilbarger Drilling Rig 17 will spud this storage well later today. The drilling pits are fence, lined and in good condition. The required signage is posted at the lease entrance. | ||||
1868198946 | 2014-10-20 | I inspected Dominion East Ohio Gas storage well #3938. The well is equipped with a master gate valve and a side gate valve that were inspected by a third party company on 9/2014. There was a sales line with a separator. There is a flow gate valve plumbed with a 3.00 line into a 100 BBL storage tank. All lids and hatches on the storage tank are closed and secure. There are two (2) pickup lines on the storage tank and they are secured with valves and bull plugs in place. The tank battery is diked. The well is properly identified with a clear, legibly marked well identification sign mounted on the storage tank. The lease road is stoned and drivable. No violations found. | ||||
-571908297 | 2012-01-18 | Universal is on site to frac the well. They used 60,294 gallons of water; 61,800# 20/40 sand; and 390,000 standard cubic feet of nitrogen. The formation broke at 1,644 psi with an average treating pressure of 2,420 psi at an average rate of 26.2 bpm. Initial shut in pressure was 1,537 psi and five minute shut in pressure was 1,432 psi. Rigged up and started flowback after the job. | ||||
821315154 | 2011-11-03 | Kilbarger Drilling Rig 17 has moved off location. The pits are lined and fenced but they are full. Pit solidification is scheduled for next week. | ||||
940825890 | 2011-10-28 | Kilbarger is drilling ahead at 3850'. They should reach total depth (TD) by tomorrow. The pit is fenced, lined and in good condition. It will need to be pumped down to hold the water displaced during cementing. | ||||
-989128700 | 2011-07-18 | Dominion has started building the lease road to this storage well location. The entrance is built and trees need to be removed before continuing. |