X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-151-25873"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-151-25873
 
| Well ID: 34-151-25873
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.8078109509, -81.1801801462 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.80781095, -81.18018015 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Stark County, Ohio|Stark]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BECK ENERGY CORP]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date: 2014-11-07
 
|-
 
|-
| Unconventional:
+
| Unconventional:  
 
|-
 
|-
| Horizontal:
+
| Configuration:  
 
|-
 
|-
| Producing:
+
| Well Status: Drilling
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.8078109509
+
| Latitude: 40.80781095
 
|-
 
|-
| Longitude: -81.1801801462
+
| Longitude: -81.18018015
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1415380869
 +
| 2014-11-05
 +
|
 +
| I was on location to check the status of Poulson Drilling rigging up on location. Currently the air compressors and a load of drill pipe are on location. Some loads will be moved today but the majority of the move will occur on 11/6/14.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1505111168
 +
| 2015-05-05
 +
|
 +
| I was on location to check the status of stimulating this well. Producer's Service Corp was currently rigging up on location. The frac is currently behind schedule due to the longer period required to frac the RTB 1 well. The crews will rig up today and complete the job before sunset.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1781164130
 +
| 2014-11-06
 +
|
 +
| I was on location to check the status of Poulson Drilling rigging up on location. Currently the rig and all equipment have been brought onto location and are being spotted on the location. The working pit is currently being dug and is composed of a clay soil and is not making any water and is stable. They expect to spud the well in the morning on 11/7/2014.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -189831237
 +
| 2015-05-28
 +
|
 +
| I was on location to check the status of restoration for this well. A contractor was on location performing dirt work and reclaiming the drilling location. A pumpjack has been set on the well today. I explained to the operator that a mechanical pressure relief valve and pressure gauge must be installed on the 8.625 diameter surface casing and production casing annulus to monitor pressures. Flowlines for the well have been installed and are waiting to be covered by topsoil. I will follow up when reclamation is complete to pass preliminary restoration.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1908172091
 +
| 2014-11-07
 +
|
 +
| I was on location to witness the cementing of the 16 diameter conductor casing for this well. 36' of drift was encountered and it was decided to drill a 20 diameter hole to 64 and install 54' of 16 diameter 65 lb/ft pipe. Universal rigged up and pumped 100sks of type 1 cement with 3% CaCl and .25 lb/sk flake. They displaced the cement with 8.8bbls of fresh water and there were complete returns during the job and 8bbls of cement slurry returned to surface. Poulson Drilling will wait on cement for 8 hours before breaking off and drilling ahead.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 399886370
 +
| 2014-11-21
 +
|
 +
| I was on location to witness the closing of the pits for this well. A total of two loads of dust per pit have been brought onto location and are being mixed by a Palmer and Son's backhoe. Stallion vacuum trucks are also currently hauling off water from the of tops of the pits. The pits will be closed fully today.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -92426129
 +
| 2014-11-12
 +
|
 +
| I was on location to check the status of Poulson Drilling this well. They are currently drilling on air a 7.875 diameter hole at 1850'. They will continue drilling ahead to their approximate total depth of 5350'. There are no violations at this time.
 +
|
 +
|
 +
|
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 08:52, 15 July 2015

Well Details

Well ID: 34-151-25873
Loading map...
County: Stark
Municipality:
Operator Name: BECK ENERGY CORP
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-11-07
Unconventional:
Configuration:
Well Status: Drilling
Violations: 0
Latitude: 40.80781095
Longitude: -81.18018015

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1415380869 2014-11-05 I was on location to check the status of Poulson Drilling rigging up on location. Currently the air compressors and a load of drill pipe are on location. Some loads will be moved today but the majority of the move will occur on 11/6/14.
1505111168 2015-05-05 I was on location to check the status of stimulating this well. Producer's Service Corp was currently rigging up on location. The frac is currently behind schedule due to the longer period required to frac the RTB 1 well. The crews will rig up today and complete the job before sunset.
1781164130 2014-11-06 I was on location to check the status of Poulson Drilling rigging up on location. Currently the rig and all equipment have been brought onto location and are being spotted on the location. The working pit is currently being dug and is composed of a clay soil and is not making any water and is stable. They expect to spud the well in the morning on 11/7/2014.
-189831237 2015-05-28 I was on location to check the status of restoration for this well. A contractor was on location performing dirt work and reclaiming the drilling location. A pumpjack has been set on the well today. I explained to the operator that a mechanical pressure relief valve and pressure gauge must be installed on the 8.625 diameter surface casing and production casing annulus to monitor pressures. Flowlines for the well have been installed and are waiting to be covered by topsoil. I will follow up when reclamation is complete to pass preliminary restoration.
1908172091 2014-11-07 I was on location to witness the cementing of the 16 diameter conductor casing for this well. 36' of drift was encountered and it was decided to drill a 20 diameter hole to 64 and install 54' of 16 diameter 65 lb/ft pipe. Universal rigged up and pumped 100sks of type 1 cement with 3% CaCl and .25 lb/sk flake. They displaced the cement with 8.8bbls of fresh water and there were complete returns during the job and 8bbls of cement slurry returned to surface. Poulson Drilling will wait on cement for 8 hours before breaking off and drilling ahead.
399886370 2014-11-21 I was on location to witness the closing of the pits for this well. A total of two loads of dust per pit have been brought onto location and are being mixed by a Palmer and Son's backhoe. Stallion vacuum trucks are also currently hauling off water from the of tops of the pits. The pits will be closed fully today.
-92426129 2014-11-12 I was on location to check the status of Poulson Drilling this well. They are currently drilling on air a 7.875 diameter hole at 1850'. They will continue drilling ahead to their approximate total depth of 5350'. There are no violations at this time.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.