Difference between revisions of "34-119-26770"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-119-26770
 
| Well ID: 34-119-26770
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.8895989348, -81.9256486004 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.88957094, -81.92589284 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Muskingum County, Ohio|Muskingum]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BIG SKY ENERGY INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 1984-02-14
 
| Spud Date: 1984-02-14
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Final Restoration
 
|-
 
|-
| Violations: 6
+
| Violations: 0
 
|-
 
|-
| Latitude: 39.8895989348
+
| Latitude: 39.88957094
 
|-
 
|-
| Longitude: -81.9256486004
+
| Longitude: -81.92589284
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 1984-0
 +
| style="text-align:right;" | 332.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 372.0
 +
|
 +
|-
 +
|-
 +
| 1985-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1994-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1995-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2001-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 103:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
| -1274491085
+
| 1049917797
| 2014-05-05
 
|
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services were not on location. Made call and they are still preparing wellhead and tubing for upcoming completion of plug job.
 
|
 
|
 
|
 
|-
 
|-
 
| -1527649477
 
 
| 2014-04-16
 
| 2014-04-16
|
+
|  
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services ran their tools down through the 7 inch seat at 1153 feet and then ran a precast plug and set it at 1153 feet. WCS washed in 1 ton of clay from 1153 feet to 1091 feet and began to rip the 8.625 inch casing.
+
| I met Doug Bennet on site. The rig had just set 7''cast plug across 7''seat. They then started washing in 1 ton of clay across cast plug. They started to cut the weld from the 8,625''casing. They tried to pull casing. It did not budge. They shut down for the day.
|
+
|  
|
+
|  
|
+
| Compliance Notice
|-
 
|-
 
| -1921085567
 
| 2014-05-14
 
|
 
| The well has been plugged by Big Sky Energy. Upon taking equipment out of the location the land owner Dan Mercer called the County Highway Department which initiated the complaint of 4709. Big Sky was pulling a tractor and trailer loaded with pipe and tubing with a dozer and pushing with a dozer up the grade and on the road. The chip and seal was tore up leaving the section of road soft. The Highway department called me and they would fix the road and send the bill to the company.
 
|
 
|
 
|
 
|-
 
|-
 
| -723471238
 
| 2014-04-21
 
|
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services pulled 4 joints of 8.625 inch casing and then their slips broke. WCS tried unsuccessfully to repair and then shut down.
 
|
 
|
 
|
 
|-
 
|-
 
| -744940282
 
| 2014-01-31
 
|
 
| Bob Barr called and stated that he will have to post a new plug permit and he will plug this well if he can get equipment in to location.
 
|
 
|
 
|
 
|-
 
|-
 
| -79706526
 
| 2014-04-15
 
|
 
| On the day of my inspection I was on site and WCS did not show up and I made several attempts to contact. Received callback later that there was a family emergency and they would be on site tomorrow.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1049917797
 
| 1049917797
 
| 2014-04-16
 
| 2014-04-16
|
+
|  
 
| I met Doug Bennet on site. The rig had just set 7''cast plug across 7''seat. They then started washing in 1 ton of clay across cast plug. They started to cut the weld from the 8,625''casing. They tried to pull casing. It did not budge. They shut down for the day.
 
| I met Doug Bennet on site. The rig had just set 7''cast plug across 7''seat. They then started washing in 1 ton of clay across cast plug. They started to cut the weld from the 8,625''casing. They tried to pull casing. It did not budge. They shut down for the day.
|
+
|  
|
+
|  
|
+
| Field Visit or Inspection
 
|-
 
|-
 
|-
 
|-
 
| 1245144442
 
| 1245144442
 
| 2009-06-15
 
| 2009-06-15
|
+
|  
 
| Well is open to atmosphere.  Tanks have been removed.  PJ removed.  Some junk and debris around well.  LO said tubing and rods and unit and tanks weere removed 7 or 8 years ago.  Called Big Sky and they will get back  to us on time frame to P & A.  Well is part of consent agreement signed over a year ago.
 
| Well is open to atmosphere.  Tanks have been removed.  PJ removed.  Some junk and debris around well.  LO said tubing and rods and unit and tanks weere removed 7 or 8 years ago.  Called Big Sky and they will get back  to us on time frame to P & A.  Well is part of consent agreement signed over a year ago.
|
+
|  
| NONE
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1262609043
 
| 1262609043
 
| 2009-12-31
 
| 2009-12-31
|
+
|  
 
| Nothing done.  Well has not been plugged nor is it producing as per the consent agreement and the  plugging permit has expired.
 
| Nothing done.  Well has not been plugged nor is it producing as per the consent agreement and the  plugging permit has expired.
|
+
|  
| NONE
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1309266388
+
| -1274491085
| 2011-06-27
+
| 2014-05-05
|
+
|  
| On day of inspection Supervisor Stonerock issued a request for inspection on said well. The well is idle and is shut in. There is a 4.5''casing and a 4x2 reducer with a valve. There is substantial vegetation and tree cover. The pump jack and rods and tubing all have been pulled. No AD at this time.No production reports filed.No id.
+
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services were not on location. Made call and they are still preparing wellhead and tubing for upcoming completion of plug job.
|
+
|  
| 9-9-05(A)10
+
|  
|
+
|  
|-
 
|-
 
| 1309266388
 
| 2011-06-27
 
|
 
| On day of inspection Supervisor Stonerock issued a request for inspection on said well. The well is idle and is shut in. There is a 4.5''casing and a 4x2 reducer with a valve. There is substantial vegetation and tree cover. The pump jack and rods and tubing all have been pulled. No AD at this time.No production reports filed.No id.
 
|
 
| NONE
 
|
 
|-
 
|-
 
| 1309266388
 
| 2011-06-27
 
|
 
| On day of inspection Supervisor Stonerock issued a request for inspection on said well. The well is idle and is shut in. There is a 4.5''casing and a 4x2 reducer with a valve. There is substantial vegetation and tree cover. The pump jack and rods and tubing all have been pulled. No AD at this time.No production reports filed.No id.
 
|
 
| NONE_
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1309266388
 
| 1309266388
 
| 2011-06-27
 
| 2011-06-27
|
+
|  
 
| On day of inspection Supervisor Stonerock issued a request for inspection on said well. The well is idle and is shut in. There is a 4.5''casing and a 4x2 reducer with a valve. There is substantial vegetation and tree cover. The pump jack and rods and tubing all have been pulled. No AD at this time.No production reports filed.No id.
 
| On day of inspection Supervisor Stonerock issued a request for inspection on said well. The well is idle and is shut in. There is a 4.5''casing and a 4x2 reducer with a valve. There is substantial vegetation and tree cover. The pump jack and rods and tubing all have been pulled. No AD at this time.No production reports filed.No id.
|
+
|  
| NONEC
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1396357335
 
| 1396357335
 
| 2014-04-01
 
| 2014-04-01
|
+
|  
 
+
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043 I witnessed that Well Completion Services wash in a 500
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1396549508
 
| 1396549508
 
| 2014-04-03
 
| 2014-04-03
|
+
|  
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043 I witnessed that Well Completion Services ripped casing at 2900 feet and lost their jars coming up out of the hole. WCS left location for a fishing tool for retrieval and will begin fishing tools out tomorrow.
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043 I witnessed that Well Completion Services ripped casing at 2900 feet and lost their jars coming up out of the hole. WCS left location for a fishing tool for retrieval and will begin fishing tools out tomorrow.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1396889140
 
| 1396889140
 
| 2014-04-07
 
| 2014-04-07
|
+
|  
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services had fished their jars out of the hole on Saturday. I witnessed that Well Completion Services pulled 12 joints of 4.5 inch casing and then washed a 285 foot Big Lime clay plug from 2650 feet to 2935 feet. WCS pulled 1 joint of 4.5 inch casing and their power tongs broke. Shut down to get replacement parts for tongs.
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services had fished their jars out of the hole on Saturday. I witnessed that Well Completion Services pulled 12 joints of 4.5 inch casing and then washed a 285 foot Big Lime clay plug from 2650 feet to 2935 feet. WCS pulled 1 joint of 4.5 inch casing and their power tongs broke. Shut down to get replacement parts for tongs.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1397844076
 
| 1397844076
 
| 2014-04-18
 
| 2014-04-18
|
+
|  
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services ripped 8.625 inch casing at 240 feet and pulled one joint. Due to equipment problems shut down until Monday.
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services ripped 8.625 inch casing at 240 feet and pulled one joint. Due to equipment problems shut down until Monday.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1399465858
 
| 1399465858
 
| 2014-05-06
 
| 2014-05-06
|
+
|  
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, I was accompanied by ODNR Inspector Pat Shreve, new pictures were taken and final restoration was discussed. Well Completion Services will be onsite tomorrow to run tubing in preparation for completing the plug job on Thursday.
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, I was accompanied by ODNR Inspector Pat Shreve, new pictures were taken and final restoration was discussed. Well Completion Services will be onsite tomorrow to run tubing in preparation for completing the plug job on Thursday.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1399486187
 
| 1399486187
 
| 2014-05-06
 
| 2014-05-06
|
+
|  
 
| Doug Bennett and I went in to location and looked at the site condition. We took some pictures of what will need clean up on site and roughed in with the dirt work.
 
| Doug Bennett and I went in to location and looked at the site condition. We took some pictures of what will need clean up on site and roughed in with the dirt work.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1399575228
 
| 1399575228
 
| 2014-05-08
 
| 2014-05-08
|
+
|  
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, I witnessed that Well Completion Services and Formation Cementing Services was on site. Formation Cementing Services pumped a 200 foot class A Berea plug from 1066 feet to 866 feet, WCS pulled 9 joints of 1.5 inch tubing, Formation Cementing Services pumped a 200 foot class A bottom of the surface casing plug from 765 feet to 565 feet, WCS pulled 16 joints of 1.5 inch tubing and Formation Cementing Services pumped a 240 foot surface plug from 240 feet to surface. WCS pulled last 7 joints of tubing and cement stayed to surface.
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, I witnessed that Well Completion Services and Formation Cementing Services was on site. Formation Cementing Services pumped a 200 foot class A Berea plug from 1066 feet to 866 feet, WCS pulled 9 joints of 1.5 inch tubing, Formation Cementing Services pumped a 200 foot class A bottom of the surface casing plug from 765 feet to 565 feet, WCS pulled 16 joints of 1.5 inch tubing and Formation Cementing Services pumped a 240 foot surface plug from 240 feet to surface. WCS pulled last 7 joints of tubing and cement stayed to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1402311007
 
| 1402311007
 
| 2014-06-07
 
| 2014-06-07
|
+
|  
 
| Well has been plugged but the final has not been completed. There is wire and piping laying around that needs removed. The dirt work needs to be completed on the wildlife property.
 
| Well has been plugged but the final has not been completed. There is wire and piping laying around that needs removed. The dirt work needs to be completed on the wildlife property.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1403884112
 
| 1403884112
 
| 2014-06-27
 
| 2014-06-27
|
+
|  
 
| Per the request of Legal Section I performed a Final Restoration inspection on plugged well site. I took pictures from start to finish. There is a patch job on the road from the County Highway department due to Big Sky running dozer on chip and seal and pulling equipment out. The road down the hill between the two lanowners has been put back by the landowners. They used old crushed blacktop was used as a compaction material. Big Sky did make ditch for them on the west side down to the fence. The first gate was hit by Big Sky equipment. They never fixed it back to original status. The second gate is where the Property is owned by  State of Ohio Division of Wildlife. From that point on the lease road is chopped up and wet. The mud is knee deep. There was orange pipe in the road . Upon well site there was trash and material left. There were items such as a piece of 8.625''casing, 2'' white plastic flow pipe, 8.625''cast plug, wire and metal. There was a tool left from rig and 1''orange plastic pipe. The company plugging the well was specifically told to remove all material before leaving the site. The Final Restoration has not passed at this point. Remove all material and install property back per Soil and Water Best Mangement Practices.
 
| Per the request of Legal Section I performed a Final Restoration inspection on plugged well site. I took pictures from start to finish. There is a patch job on the road from the County Highway department due to Big Sky running dozer on chip and seal and pulling equipment out. The road down the hill between the two lanowners has been put back by the landowners. They used old crushed blacktop was used as a compaction material. Big Sky did make ditch for them on the west side down to the fence. The first gate was hit by Big Sky equipment. They never fixed it back to original status. The second gate is where the Property is owned by  State of Ohio Division of Wildlife. From that point on the lease road is chopped up and wet. The mud is knee deep. There was orange pipe in the road . Upon well site there was trash and material left. There were items such as a piece of 8.625''casing, 2'' white plastic flow pipe, 8.625''cast plug, wire and metal. There was a tool left from rig and 1''orange plastic pipe. The company plugging the well was specifically told to remove all material before leaving the site. The Final Restoration has not passed at this point. Remove all material and install property back per Soil and Water Best Mangement Practices.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1450306079
 
| 1450306079
 
| 2014-04-11
 
| 2014-04-11
|
+
|  
 
| Stopped by the site on the plug job to set cast plug over the 7''seat. The company brought out the wrong size plug. They shut down for the day.
 
| Stopped by the site on the plug job to set cast plug over the 7''seat. The company brought out the wrong size plug. They shut down for the day.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1527649477
 +
| 2014-04-16
 +
|
 +
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services ran their tools down through the 7 inch seat at 1153 feet and then ran a precast plug and set it at 1153 feet. WCS washed in 1 ton of clay from 1153 feet to 1091 feet and began to rip the 8.625 inch casing.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 169674238
 
| 169674238
 
| 2014-04-17
 
| 2014-04-17
|
+
|  
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services tried to pull 8.625 inch casing after numerous attempts, tightened the 8.625 inch casing will be back tomorrow to begin to rip casing.
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services tried to pull 8.625 inch casing after numerous attempts, tightened the 8.625 inch casing will be back tomorrow to begin to rip casing.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1744650580
 +
| 2014-09-15
 +
|
 +
| Final Restoration did not pass on day of inspection due to 1''plastic line laying on ground.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1921085567
 +
| 2014-05-14
 +
|
 +
| The well has been plugged by Big Sky Energy. Upon taking equipment out of the location the land owner Dan Mercer called the County Highway Department which initiated the complaint of 4709. Big Sky was pulling a tractor and trailer loaded with pipe and tubing with a dozer and pushing with a dozer up the grade and on the road. The chip and seal was tore up leaving the section of road soft. The Highway department called me and they would fix the road and send the bill to the company.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1959731584
 
| 1959731584
 
| 2014-05-07
 
| 2014-05-07
|
+
|  
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, I witnessed that Well Completion Services rig up their wellhead, run 1068 feet of 1.5 inch tubing and spot their circulating tank for completion of plug job Thursday.
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, I witnessed that Well Completion Services rig up their wellhead, run 1068 feet of 1.5 inch tubing and spot their circulating tank for completion of plug job Thursday.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2127170619
 +
| 2014-09-24
 +
|
 +
| Final  Restoration passed on 9-24-14 by Patrick Shreve. Company picked plastic pipe up.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 295637820
 
| 295637820
 
| 2014-04-01
 
| 2014-04-01
|
+
|  
 
| WCS has rig over well and is washing in bottom hole plug. Rig washed in 3.7 ton in 4.5 casing. Location is extremely muddy located in a swamp making access difficult.
 
| WCS has rig over well and is washing in bottom hole plug. Rig washed in 3.7 ton in 4.5 casing. Location is extremely muddy located in a swamp making access difficult.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -723471238
 +
| 2014-04-21
 +
|
 +
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services pulled 4 joints of 8.625 inch casing and then their slips broke. WCS tried unsuccessfully to repair and then shut down.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 743771902
 
| 743771902
 
| 2014-04-11
 
| 2014-04-11
|
+
|  
| Pat Shreves contacted me to cover this plug job for him during the day. I was on standby to replace him on the job. Pat called me to come out to the job. When I arrived on location we had to shut the service rig crew down. They did not have the right pre-cast plug for the plugging job and they did not have there 8" tools to rip the pipe. They are going to get the right stuff and come back on Monday.
+
| Pat Shreves contacted me to cover this plug job for him during the day. I was on standby to replace him on the job. Pat called me to come out to the job. When I arrived on location we had to shut the service rig crew down. They did not have the right pre-cast plug for the plugging job and they did not have there 8 tools to rip the pipe. They are going to get the right stuff and come back on Monday.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -744940282
 +
| 2014-01-31
 +
|
 +
| Bob Barr called and stated that he will have to post a new plug permit and he will plug this well if he can get equipment in to location.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -79706526
 +
| 2014-04-15
 +
|
 +
| On the day of my inspection I was on site and WCS did not show up and I made several attempts to contact. Received callback later that there was a family emergency and they would be on site tomorrow.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 823482168
 
| 823482168
 
| 2014-04-22
 
| 2014-04-22
|
+
|  
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services pulled the remainder of the 8.625 inch casing for a total of 241 feet. WCS continued plugging well with clay when the hole filled up with water. At that time a decision was made to run tubing and plug out with cement.
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services pulled the remainder of the 8.625 inch casing for a total of 241 feet. WCS continued plugging well with clay when the hole filled up with water. At that time a decision was made to run tubing and plug out with cement.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 912002858
 
| 912002858
 
| 2013-06-24
 
| 2013-06-24
|
+
|  
 
| There is no change with the status of the well. There is a 10.75''conductor and the 8.625''casing is welded to it. There is a 4.5''casing welded to the 8.625''and a 4x2 reducer. There is a 2''valve shut and well is still not capable of production. The line in various areas is dimantled. The tanks have been removed approximately 16 years ago. The well was never capable for domestic gas.
 
| There is no change with the status of the well. There is a 10.75''conductor and the 8.625''casing is welded to it. There is a 4.5''casing welded to the 8.625''and a 4x2 reducer. There is a 2''valve shut and well is still not capable of production. The line in various areas is dimantled. The tanks have been removed approximately 16 years ago. The well was never capable for domestic gas.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 942825253
 
| 942825253
 
| 2014-04-08
 
| 2014-04-08
|
+
|  
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services finished pulling 92 joints of 4.5 inch production casing from the well. Plan is to set the cast plug and continue plugging on Thursday.
 
| On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services finished pulling 92 joints of 4.5 inch production casing from the well. Plan is to set the cast plug and continue plugging on Thursday.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -963352860
 +
| 2014-09-24
 +
|
 +
| I stopped by location at approximately 1200 hrs to 1300 hrs to verify that the 1''orange tubing was removed from the site. The company did not remove the tubing at this point. I called Roger Barr and he would have a crew out at about 2:30 pm.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| PL8311
 
| PL8311
|
+
|  
|
+
|  
 
| Preliminary Restoration  done information from Data Point
 
| Preliminary Restoration  done information from Data Point
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 12:48, 15 July 2015

Well Details

Well ID: 34-119-26770
Loading map...
County: Muskingum
Municipality:
Operator Name: BIG SKY ENERGY INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1984-02-14
Unconventional: No
Configuration: Vertical
Well Status: Final Restoration
Violations: 0
Latitude: 39.88957094
Longitude: -81.92589284

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1984-0 332.0 372.0
1985-0 0.0 0.0
1994-0 0.0 0.0
1995-0 0.0 0.0
2001-0 0.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1049917797 2014-04-16 I met Doug Bennet on site. The rig had just set 7cast plug across 7seat. They then started washing in 1 ton of clay across cast plug. They started to cut the weld from the 8,625casing. They tried to pull casing. It did not budge. They shut down for the day. Compliance Notice
1049917797 2014-04-16 I met Doug Bennet on site. The rig had just set 7cast plug across 7seat. They then started washing in 1 ton of clay across cast plug. They started to cut the weld from the 8,625casing. They tried to pull casing. It did not budge. They shut down for the day. Field Visit or Inspection
1245144442 2009-06-15 Well is open to atmosphere. Tanks have been removed. PJ removed. Some junk and debris around well. LO said tubing and rods and unit and tanks weere removed 7 or 8 years ago. Called Big Sky and they will get back to us on time frame to P & A. Well is part of consent agreement signed over a year ago.
1262609043 2009-12-31 Nothing done. Well has not been plugged nor is it producing as per the consent agreement and the plugging permit has expired.
-1274491085 2014-05-05 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services were not on location. Made call and they are still preparing wellhead and tubing for upcoming completion of plug job.
1309266388 2011-06-27 On day of inspection Supervisor Stonerock issued a request for inspection on said well. The well is idle and is shut in. There is a 4.5casing and a 4x2 reducer with a valve. There is substantial vegetation and tree cover. The pump jack and rods and tubing all have been pulled. No AD at this time.No production reports filed.No id.
1396357335 2014-04-01 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043 I witnessed that Well Completion Services wash in a 500
1396549508 2014-04-03 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043 I witnessed that Well Completion Services ripped casing at 2900 feet and lost their jars coming up out of the hole. WCS left location for a fishing tool for retrieval and will begin fishing tools out tomorrow.
1396889140 2014-04-07 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services had fished their jars out of the hole on Saturday. I witnessed that Well Completion Services pulled 12 joints of 4.5 inch casing and then washed a 285 foot Big Lime clay plug from 2650 feet to 2935 feet. WCS pulled 1 joint of 4.5 inch casing and their power tongs broke. Shut down to get replacement parts for tongs.
1397844076 2014-04-18 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services ripped 8.625 inch casing at 240 feet and pulled one joint. Due to equipment problems shut down until Monday.
1399465858 2014-05-06 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, I was accompanied by ODNR Inspector Pat Shreve, new pictures were taken and final restoration was discussed. Well Completion Services will be onsite tomorrow to run tubing in preparation for completing the plug job on Thursday.
1399486187 2014-05-06 Doug Bennett and I went in to location and looked at the site condition. We took some pictures of what will need clean up on site and roughed in with the dirt work.
1399575228 2014-05-08 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, I witnessed that Well Completion Services and Formation Cementing Services was on site. Formation Cementing Services pumped a 200 foot class A Berea plug from 1066 feet to 866 feet, WCS pulled 9 joints of 1.5 inch tubing, Formation Cementing Services pumped a 200 foot class A bottom of the surface casing plug from 765 feet to 565 feet, WCS pulled 16 joints of 1.5 inch tubing and Formation Cementing Services pumped a 240 foot surface plug from 240 feet to surface. WCS pulled last 7 joints of tubing and cement stayed to surface.
1402311007 2014-06-07 Well has been plugged but the final has not been completed. There is wire and piping laying around that needs removed. The dirt work needs to be completed on the wildlife property.
1403884112 2014-06-27 Per the request of Legal Section I performed a Final Restoration inspection on plugged well site. I took pictures from start to finish. There is a patch job on the road from the County Highway department due to Big Sky running dozer on chip and seal and pulling equipment out. The road down the hill between the two lanowners has been put back by the landowners. They used old crushed blacktop was used as a compaction material. Big Sky did make ditch for them on the west side down to the fence. The first gate was hit by Big Sky equipment. They never fixed it back to original status. The second gate is where the Property is owned by State of Ohio Division of Wildlife. From that point on the lease road is chopped up and wet. The mud is knee deep. There was orange pipe in the road . Upon well site there was trash and material left. There were items such as a piece of 8.625casing, 2 white plastic flow pipe, 8.625cast plug, wire and metal. There was a tool left from rig and 1orange plastic pipe. The company plugging the well was specifically told to remove all material before leaving the site. The Final Restoration has not passed at this point. Remove all material and install property back per Soil and Water Best Mangement Practices.
1450306079 2014-04-11 Stopped by the site on the plug job to set cast plug over the 7seat. The company brought out the wrong size plug. They shut down for the day.
-1527649477 2014-04-16 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services ran their tools down through the 7 inch seat at 1153 feet and then ran a precast plug and set it at 1153 feet. WCS washed in 1 ton of clay from 1153 feet to 1091 feet and began to rip the 8.625 inch casing.
169674238 2014-04-17 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services tried to pull 8.625 inch casing after numerous attempts, tightened the 8.625 inch casing will be back tomorrow to begin to rip casing.
1744650580 2014-09-15 Final Restoration did not pass on day of inspection due to 1plastic line laying on ground.
-1921085567 2014-05-14 The well has been plugged by Big Sky Energy. Upon taking equipment out of the location the land owner Dan Mercer called the County Highway Department which initiated the complaint of 4709. Big Sky was pulling a tractor and trailer loaded with pipe and tubing with a dozer and pushing with a dozer up the grade and on the road. The chip and seal was tore up leaving the section of road soft. The Highway department called me and they would fix the road and send the bill to the company.
1959731584 2014-05-07 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, I witnessed that Well Completion Services rig up their wellhead, run 1068 feet of 1.5 inch tubing and spot their circulating tank for completion of plug job Thursday.
-2127170619 2014-09-24 Final Restoration passed on 9-24-14 by Patrick Shreve. Company picked plastic pipe up.
295637820 2014-04-01 WCS has rig over well and is washing in bottom hole plug. Rig washed in 3.7 ton in 4.5 casing. Location is extremely muddy located in a swamp making access difficult.
-723471238 2014-04-21 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services pulled 4 joints of 8.625 inch casing and then their slips broke. WCS tried unsuccessfully to repair and then shut down.
743771902 2014-04-11 Pat Shreves contacted me to cover this plug job for him during the day. I was on standby to replace him on the job. Pat called me to come out to the job. When I arrived on location we had to shut the service rig crew down. They did not have the right pre-cast plug for the plugging job and they did not have there 8 tools to rip the pipe. They are going to get the right stuff and come back on Monday.
-744940282 2014-01-31 Bob Barr called and stated that he will have to post a new plug permit and he will plug this well if he can get equipment in to location.
-79706526 2014-04-15 On the day of my inspection I was on site and WCS did not show up and I made several attempts to contact. Received callback later that there was a family emergency and they would be on site tomorrow.
823482168 2014-04-22 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services pulled the remainder of the 8.625 inch casing for a total of 241 feet. WCS continued plugging well with clay when the hole filled up with water. At that time a decision was made to run tubing and plug out with cement.
912002858 2013-06-24 There is no change with the status of the well. There is a 10.75conductor and the 8.625casing is welded to it. There is a 4.5casing welded to the 8.625and a 4x2 reducer. There is a 2valve shut and well is still not capable of production. The line in various areas is dimantled. The tanks have been removed approximately 16 years ago. The well was never capable for domestic gas.
942825253 2014-04-08 On the day of my inspection following up on Chiefs Order 2014-43, NOV-1309266388 and NOV-1262609043, Well Completion Services finished pulling 92 joints of 4.5 inch production casing from the well. Plan is to set the cast plug and continue plugging on Thursday.
-963352860 2014-09-24 I stopped by location at approximately 1200 hrs to 1300 hrs to verify that the 1orange tubing was removed from the site. The company did not remove the tubing at this point. I called Roger Barr and he would have a crew out at about 2:30 pm.
PL8311 Preliminary Restoration done information from Data Point

For data sources see[2]