X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-029-21737"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-029-21737
 
| Well ID: 34-029-21737
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.847168308, -80.8115644466 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.84716831, -80.81156445 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Columbiana County, Ohio|Columbiana]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2012-10-07
 
| Spud Date: 2012-10-07
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.847168308
+
| Latitude: 40.84716831
 
|-
 
|-
| Longitude: -80.8115644466
+
| Longitude: -80.81156445
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-3
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-6
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-9
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 175396.0
 +
| style="text-align:right;" | 83.0
 +
|
 +
|
 +
| style="text-align:right;" | 1056.0
 +
| style="text-align:right;" | 83.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 92318.0
 +
| style="text-align:right;" | 91.0
 +
|
 +
|
 +
| style="text-align:right;" | 595.0
 +
| style="text-align:right;" | 91.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 73613.0
 +
| style="text-align:right;" | 89.0
 +
|
 +
|
 +
| style="text-align:right;" | 492.0
 +
| style="text-align:right;" | 89.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 139:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1193860219
 
| -1193860219
 
| 2012-10-14
 
| 2012-10-14
|
+
|  
 
+
| I went to the site to witness the cementing of the intermediate casing.  The drilling contractor, Nomac 310, drilled a 12.25 diameter hole to 1330
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -1929721836
 
| 2012-10-12
 
|
 
| I stopped at the site to check on the drilling progress for the intermediate casing.  I met with drilling consultant, Joe Bailey.  Drilling hadn't resumed due to mechanical issues.
 
|
 
|
 
|
 
|-
 
|-
 
| -805651358
 
| 2102-10-30
 
|
 
 
 
|
 
|
 
|
 
|-
 
|-
 
| -918304266
 
| 2013-09-13
 
|
 
| I went to the site to check the completion of the mousehole and the cellar.  The mousehole was installed within the cellar, and both were well cemented.  The site is ready for the arrival of the drilling rig.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1367953544
 
| 1367953544
 
| 2012-09-05
 
| 2012-09-05
|
+
|  
 
| I was at the site to check the progress on the conductor drilling operation.  United Drilling was on location and in the process of drilling the conductor hole.  The cellar was installed.
 
| I was at the site to check the progress on the conductor drilling operation.  United Drilling was on location and in the process of drilling the conductor hole.  The cellar was installed.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1368100671
 
| 1368100671
 
| 2012-10-10
 
| 2012-10-10
|
+
|  
 
+
| I went to the site to witness the cementing of the surface casing.  The drilling contractor, Nomac 310, had recovered the last joint of 13.375
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1409837557
 +
| 2014-06-17
 +
|
 +
| I stopped by the site to check on the status of well completion and restoration.  The well has been hydraulically fractured. There is two 400 barrel tanks and one GPU production unit. The well is equipped with a Christmas tree. Values are locked out. Tanks or the wellhead do note have ID signs posted.  I walked the entire site, and found the location to be in good condition.  All erosion and sedimentation controls, and drainage controls appear to be functioning.  Ground cover is well established along the access road and around the drilling pad.  No areas of erosion are present.  Preliminary restoration approval will not be finalized until well is in production and ID sigs are posted.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1929721836
 +
| 2012-10-12
 +
|
 +
| I stopped at the site to check on the drilling progress for the intermediate casing.  I met with drilling consultant, Joe Bailey.  Drilling hadn't resumed due to mechanical issues.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 2011006015
 
| 2011006015
 
| 2012-10-05
 
| 2012-10-05
|
+
|  
 
| I went to the site to have a pre-spud meeting with drilling consultant Mike Kirkpatrick of Chesapeake.  Nomac 310 was onsite, and rigging up.  I reviewed the new well construction regulations with Mr. Kirkpatrick, and provided him with a copy.  Drilling superintendent John Snook requested a copy as well.  The rig anticipated spudding on Saturday 10/06/2012.
 
| I went to the site to have a pre-spud meeting with drilling consultant Mike Kirkpatrick of Chesapeake.  Nomac 310 was onsite, and rigging up.  I reviewed the new well construction regulations with Mr. Kirkpatrick, and provided him with a copy.  Drilling superintendent John Snook requested a copy as well.  The rig anticipated spudding on Saturday 10/06/2012.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 729864468
 
| 729864468
 
| 2012-10-09
 
| 2012-10-09
|
+
|  
| I went to the site to check on the progress of completion of the surface casing installation.  Nomac 310 had spudded the well on 10/07/2012, and TD'd the surface hole at 591' KB on 10/07/2012.  The rig had installed the 13.375" OD casing to the bottom of the hole and attempted to circulate.  The casing pressured up, as it appeared to be packed off.  The rig began to remove the casing, and got hung up.  The casing parted and part of the casing string fell down hole.  The rig had to fish it out.  At the time of my site visit, there was still one joint of casing in the hole.  Fishing would continue until the last joint was removed.  A new string of surface casing would then be installed.
+
| I went to the site to check on the progress of completion of the surface casing installation.  Nomac 310 had spudded the well on 10/07/2012, and TD'd the surface hole at 591' KB on 10/07/2012.  The rig had installed the 13.375 OD casing to the bottom of the hole and attempted to circulate.  The casing pressured up, as it appeared to be packed off.  The rig began to remove the casing, and got hung up.  The casing parted and part of the casing string fell down hole.  The rig had to fish it out.  At the time of my site visit, there was still one joint of casing in the hole.  Fishing would continue until the last joint was removed.  A new string of surface casing would then be installed.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 763189225
 
| 763189225
 
| 2012-09-07
 
| 2012-09-07
|
+
|  
 
+
| I witnessed the cementing of the conductor casing.  United Drilling drilled a 26 diameter hole to 10
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -805651358
 +
| 2102-10-30
 +
|
 +
| I went to the site to witness the cementing of the production casing.  The drilling contractor, Nomac 310, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1330
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -918304266
 +
| 2013-09-13
 +
|
 +
| I went to the site to check the completion of the mousehole and the cellar.  The mousehole was installed within the cellar, and both were well cemented.  The site is ready for the arrival of the drilling rig.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 13:17, 15 July 2015

Well Details

Well ID: 34-029-21737
Loading map...
County: Columbiana
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-10-07
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.84716831
Longitude: -80.81156445

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 0.0 0.0
2013-3 0.0 0.0
2013-6 0.0 0.0
2013-9 0.0 0.0
2014-3 175396.0 83.0 1056.0 83.0
2014-1 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0
2014-4 92318.0 91.0 595.0 91.0
2015-1 73613.0 89.0 492.0 89.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1193860219 2012-10-14 I went to the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 310, drilled a 12.25 diameter hole to 1330
1367953544 2012-09-05 I was at the site to check the progress on the conductor drilling operation. United Drilling was on location and in the process of drilling the conductor hole. The cellar was installed.
1368100671 2012-10-10 I went to the site to witness the cementing of the surface casing. The drilling contractor, Nomac 310, had recovered the last joint of 13.375
1409837557 2014-06-17 I stopped by the site to check on the status of well completion and restoration. The well has been hydraulically fractured. There is two 400 barrel tanks and one GPU production unit. The well is equipped with a Christmas tree. Values are locked out. Tanks or the wellhead do note have ID signs posted. I walked the entire site, and found the location to be in good condition. All erosion and sedimentation controls, and drainage controls appear to be functioning. Ground cover is well established along the access road and around the drilling pad. No areas of erosion are present. Preliminary restoration approval will not be finalized until well is in production and ID sigs are posted.
-1929721836 2012-10-12 I stopped at the site to check on the drilling progress for the intermediate casing. I met with drilling consultant, Joe Bailey. Drilling hadn't resumed due to mechanical issues.
2011006015 2012-10-05 I went to the site to have a pre-spud meeting with drilling consultant Mike Kirkpatrick of Chesapeake. Nomac 310 was onsite, and rigging up. I reviewed the new well construction regulations with Mr. Kirkpatrick, and provided him with a copy. Drilling superintendent John Snook requested a copy as well. The rig anticipated spudding on Saturday 10/06/2012.
729864468 2012-10-09 I went to the site to check on the progress of completion of the surface casing installation. Nomac 310 had spudded the well on 10/07/2012, and TD'd the surface hole at 591' KB on 10/07/2012. The rig had installed the 13.375 OD casing to the bottom of the hole and attempted to circulate. The casing pressured up, as it appeared to be packed off. The rig began to remove the casing, and got hung up. The casing parted and part of the casing string fell down hole. The rig had to fish it out. At the time of my site visit, there was still one joint of casing in the hole. Fishing would continue until the last joint was removed. A new string of surface casing would then be installed.
763189225 2012-09-07 I witnessed the cementing of the conductor casing. United Drilling drilled a 26 diameter hole to 10
-805651358 2102-10-30 I went to the site to witness the cementing of the production casing. The drilling contractor, Nomac 310, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1330
-918304266 2013-09-13 I went to the site to check the completion of the mousehole and the cellar. The mousehole was installed within the cellar, and both were well cemented. The site is ready for the arrival of the drilling rig.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.