X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-029-21830"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-029-21830
 
| Well ID: 34-029-21830
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.878900786, -80.6261320519 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.87890079, -80.62613205 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Columbiana County, Ohio|Columbiana]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[ATLAS NOBLE LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-09-20
 
| Spud Date: 2013-09-20
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.878900786
+
| Latitude: 40.87890079
 
|-
 
|-
| Longitude: -80.6261320519
+
| Longitude: -80.62613205
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 42300.0
 +
| style="text-align:right;" | 70.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 70.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 409845.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 250741.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 90.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 94:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1030395491
 
| -1030395491
 
| 2013-12-12
 
| 2013-12-12
|
+
|  
 
+
| I was at the site to witness the cementing of the production casing.  The drilling contractor, Nomac 323, drilled an 8.50 diameter hole from beneath the base of the intermediate casing at 2045
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1169931010
 
| -1169931010
 
| 2013-09-11
 
| 2013-09-11
|
+
|  
 
| I went to the site to review the construction process of the drilling pad.  The entry off SR14 was done and the access road was built and covered with limestone aggregate.  The drilling pad was largely built, and covered with limestone aggregate.  A construction crew was still finishing the drainage, erosion and sedimentation controls surrounding the pad and access road.
 
| I went to the site to review the construction process of the drilling pad.  The entry off SR14 was done and the access road was built and covered with limestone aggregate.  The drilling pad was largely built, and covered with limestone aggregate.  A construction crew was still finishing the drainage, erosion and sedimentation controls surrounding the pad and access road.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -2060939716
 
| 2013-11-18
 
|
 
 
 
|
 
|
 
|
 
|-
 
|-
 
| -485787669
 
| 2013-08-20
 
|
 
| I went to the site and conducted a pre-construction site inspection with Kirk Elkin and Jim Burns of Atlas.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1214361834
 
| 1214361834
 
| 2013-09-20
 
| 2013-09-20
|
+
|  
 
+
| I witnessed the cementing of the conductor casing.  Express Energy Services drilled a 26 diameter hole to 75
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1384867038
 
| 1384867038
 
| 2013-11-12
 
| 2013-11-12
|
+
|  
 
| I went to the site and had a pre-spud meeting with drilling consultants Joe Nelson and Steve Potts.
 
| I went to the site and had a pre-spud meeting with drilling consultants Joe Nelson and Steve Potts.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1784735799
 
| 1784735799
 
| 2013-11-29
 
| 2013-11-29
|
+
|  
 
+
| I was at the site checking the drilling progress.  A drilling consultant wasn
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2060939716
 +
| 2013-11-18
 +
|
 +
| I went to the site to witness the cementing of the intermediate casing.  The drilling contractor, Nomac 323, drilled a 12.25 diameter hole to 2045
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -430781615
 +
| 2014-06-17
 +
|
 +
| I stopped by the site to check on the status of well completion and restoration.  The well has been hydraulically fractured. There is three 400 barrel tanks and three GPU production units. The well is equipped with a Christmas tree. Values are locked out. Tanks or the wellhead do note have ID signs posted.  I walked the entire site, and found the location to be in good condition. There is various values and pipe on location that needs to be removed.  All erosion and sedimentation controls, and drainage controls appear to be functioning.  Ground cover is well established along the access road and around the drilling pad.  No areas of erosion are present.  Preliminary restoration approval will not be finalized until well is in production and ID sigs are posted and location clear of all material laying on location.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -485787669
 +
| 2013-08-20
 +
|
 +
| I went to the site and conducted a pre-construction site inspection with Kirk Elkin and Jim Burns of Atlas.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 547368711
 
| 547368711
 
| 2013-11-14
 
| 2013-11-14
|
+
|  
 
+
| I was at the site to witness the cementing of the surface casing.  The drilling contractor, Nomac 323, spudded the surface section of the well on 11/13/2013.  The 17.50 diameter surface hole was drilled to 645
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 13:31, 15 July 2015

Well Details

Well ID: 34-029-21830
Loading map...
County: Columbiana
Municipality:
Operator Name: ATLAS NOBLE LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-09-20
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.87890079
Longitude: -80.62613205

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-2 0.0 0.0 0.0 0.0
2014-3 42300.0 70.0 0.0 70.0
2014-4 409845.0 92.0 0.0 92.0
2015-1 250741.0 90.0 0.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1030395491 2013-12-12 I was at the site to witness the cementing of the production casing. The drilling contractor, Nomac 323, drilled an 8.50 diameter hole from beneath the base of the intermediate casing at 2045
-1169931010 2013-09-11 I went to the site to review the construction process of the drilling pad. The entry off SR14 was done and the access road was built and covered with limestone aggregate. The drilling pad was largely built, and covered with limestone aggregate. A construction crew was still finishing the drainage, erosion and sedimentation controls surrounding the pad and access road.
1214361834 2013-09-20 I witnessed the cementing of the conductor casing. Express Energy Services drilled a 26 diameter hole to 75
1384867038 2013-11-12 I went to the site and had a pre-spud meeting with drilling consultants Joe Nelson and Steve Potts.
1784735799 2013-11-29 I was at the site checking the drilling progress. A drilling consultant wasn
-2060939716 2013-11-18 I went to the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 323, drilled a 12.25 diameter hole to 2045
-430781615 2014-06-17 I stopped by the site to check on the status of well completion and restoration. The well has been hydraulically fractured. There is three 400 barrel tanks and three GPU production units. The well is equipped with a Christmas tree. Values are locked out. Tanks or the wellhead do note have ID signs posted. I walked the entire site, and found the location to be in good condition. There is various values and pipe on location that needs to be removed. All erosion and sedimentation controls, and drainage controls appear to be functioning. Ground cover is well established along the access road and around the drilling pad. No areas of erosion are present. Preliminary restoration approval will not be finalized until well is in production and ID sigs are posted and location clear of all material laying on location.
-485787669 2013-08-20 I went to the site and conducted a pre-construction site inspection with Kirk Elkin and Jim Burns of Atlas.
547368711 2013-11-14 I was at the site to witness the cementing of the surface casing. The drilling contractor, Nomac 323, spudded the surface section of the well on 11/13/2013. The 17.50 diameter surface hole was drilled to 645

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.