X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-013-20654"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-013-20654
 
| Well ID: 34-013-20654
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.9761068032, -80.8379987642 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.9761068, -80.83799876 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Belmont County, Ohio|Belmont]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[XTO ENERGY INC.]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date: 2012-06-08
+
| Spud Date: 2012-10-12
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing:
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.9761068032
+
| Latitude: 39.9761068
 
|-
 
|-
| Longitude: -80.8379987642
+
| Longitude: -80.83799876
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 277081.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-3
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-6
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-9
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 943977.0
 +
| style="text-align:right;" | 89.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 89.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 627286.0
 +
| style="text-align:right;" | 91.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 91.0
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 388012.0
 +
| style="text-align:right;" | 91.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 91.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 223368.0
 +
| style="text-align:right;" | 65.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 65.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 231435.0
 +
| style="text-align:right;" | 77.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 77.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 139:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 109806723
 +
| 2012-11-01
 +
|
 +
| On the day of my inspection the rig was drilling in the lateral section at 13429ft. No violations were noted.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1303550371
 
| -1303550371
 
| 2012-12-17
 
| 2012-12-17
|
+
|  
 
| On the day of my inspection completion efforts had not begun. There was no activity taking place. No violations noted.
 
| On the day of my inspection completion efforts had not begun. There was no activity taking place. No violations noted.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1333222979
 
| -1333222979
 
| 2013-01-15
 
| 2013-01-15
|
+
|  
 
| On the day of my inspection Ed Smith with XTO was on site. Basic was on site to drill out cement but they were waiting on pipe. No violations noted.
 
| On the day of my inspection Ed Smith with XTO was on site. Basic was on site to drill out cement but they were waiting on pipe. No violations noted.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1342741658
 +
| 2012-07-18
 +
|
 +
| Inspection revealed that driller twisted off down hole motor and bit assembly and after several attempts to retrieve it decision was made to set plug in well bore and then directional drill around lost drill bit@6694' rig crew ran 6641' of drill pipe in well and set 600' plug with 520 sacks ,O-Tex was cement contractor cement plug top should be@600' will confirm when they go back in well to side track around lost down hole motor.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1350769989
 +
| 2012-10-18
 +
|
 +
| On the day of my inspection rig was still down and waiting on top head drive parts. No violations noted.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1416092894
 
| -1416092894
 
| 2012-10-19
 
| 2012-10-19
|
+
|  
 
| Call from company man that rig had been fixed and they were back to drilling.
 
| Call from company man that rig had been fixed and they were back to drilling.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1481130018
 
| -1481130018
 
| 2012-10-25
 
| 2012-10-25
|
+
|  
 
| On the day of my inspection the rig was drilling in the lateral section. No violations were noted.
 
| On the day of my inspection the rig was drilling in the lateral section. No violations were noted.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1503596207
 
| -1503596207
 
| 2013-02-20
 
| 2013-02-20
|
+
|  
 
| On the day of my inspection the Universal Well Services were stimulating the well. No violations noted.
 
| On the day of my inspection the Universal Well Services were stimulating the well. No violations noted.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1867908711
 +
| 2013-02-13
 +
|
 +
| On the day of my inspection Universal Well Services was on site stimulating the well. I spoke with Ed Smith of XTO who advised that they will be completing 7 stages and drilling out the plugs after commencement of the stimulation. No violations noted.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2058010280
 +
| 2013-01-31
 +
|
 +
| On the day of my inspection the company was preparing for fracing operations. The earth pit was being filled with fresh water. Universal was present.  No violations noted.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -273165630
 
| -273165630
 
| 2012-10-05
 
| 2012-10-05
|
+
|  
 
| Inspection revealed that they were at core point@10,120' rig was circulating well preparing to come out of hole to core potential producing formation.
 
| Inspection revealed that they were at core point@10,120' rig was circulating well preparing to come out of hole to core potential producing formation.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 375593663
 +
| 2012-11-07
 +
|
 +
| On the day of my inspection rig was drilling the lateral section at 16,075 ft. TD will be 16,090ft. No violations noted.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -430586749
 
| -430586749
 
| 2013-05-16
 
| 2013-05-16
|
+
|  
 
| On site with local inspector Andrew Corder to look over restoration work preformed at site and I told inspector Corder that once vegetation is fully established restoration work would be satisfactory.
 
| On site with local inspector Andrew Corder to look over restoration work preformed at site and I told inspector Corder that once vegetation is fully established restoration work would be satisfactory.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 475297944
 +
| 2013-01-24
 +
|
 +
| On the day of my inspection the shoe had been drilled out and perforations were made. Rig moving to 20653. No violations noted.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -488702628
 
| -488702628
 
| 2014-02-27
 
| 2014-02-27
|
+
|  
 
| On the day of my inspection the well had all equipment to be capable of production. No violations noted.
 
| On the day of my inspection the well had all equipment to be capable of production. No violations noted.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 817079473
 +
| 2014-10-23
 +
|
 +
| This site has proper erosion and sediment controls preliminary restoration on this site is complete.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -887517782
 
| -887517782
 
| 2013-02-14
 
| 2013-02-14
|
+
|  
 
| On the day of my inspection I was accompanied by Inspector Dave Ball.  Universal Well Services was on site to stimulate the well.  They had to wait on sand truck for a while. No violations noted.
 
| On the day of my inspection I was accompanied by Inspector Dave Ball.  Universal Well Services was on site to stimulate the well.  They had to wait on sand truck for a while. No violations noted.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 109806723
 
| 2012-11-01
 
|
 
| On the day of my inspection the rig was drilling in the lateral section at 13429ft. No violations were noted.
 
|
 
|
 
|
 
|-
 
|-
 
| 1342741658
 
| 2012-07-18
 
|
 
| Inspection revealed that driller twisted off down hole motor and bit assembly and after several attempts to retrieve it decision was made to set plug in well bore and then directional drill around lost drill bit@6694' rig crew ran 6641' of drill pipe in well and set 600' plug with 520 sacks ,O-Tex was cement contractor cement plug top should be@600' will confirm when they go back in well to side track around lost down hole motor.
 
|
 
|
 
|
 
|-
 
|-
 
| 1350769989
 
| 2012-10-18
 
|
 
| On the day of my inspection rig was still down and waiting on top head drive parts. No violations noted.
 
|
 
|
 
|
 
|-
 
|-
 
| 1867908711
 
| 2013-02-13
 
|
 
| On the day of my inspection Universal Well Services was on site stimulating the well. I spoke with Ed Smith of XTO who advised that they will be completing 7 stages and drilling out the plugs after commencement of the stimulation. No violations noted.
 
|
 
|
 
|
 
|-
 
|-
 
| 2058010280
 
| 2013-01-31
 
|
 
| On the day of my inspection the company was preparing for fracing operations. The earth pit was being filled with fresh water. Universal was present.  No violations noted.
 
|
 
|
 
|
 
|-
 
|-
 
| 375593663
 
| 2012-11-07
 
|
 
| On the day of my inspection rig was drilling the lateral section at 16,075 ft. TD will be 16,090ft. No violations noted.
 
|
 
|
 
|
 
|-
 
|-
 
| 475297944
 
| 2013-01-24
 
|
 
| On the day of my inspection the shoe had been drilled out and perforations were made. Rig moving to 20653. No violations noted.
 
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 14:36, 15 July 2015

Well Details

Well ID: 34-013-20654
Loading map...
County: Belmont
Municipality:
Operator Name: XTO ENERGY INC.
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-10-12
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.9761068
Longitude: -80.83799876

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 277081.0 0.0
2013-3 0.0 0.0
2013-6 0.0 0.0
2013-9 0.0 0.0
2014-1 943977.0 89.0 0.0 89.0
2014-2 627286.0 91.0 0.0 91.0
2014-3 388012.0 91.0 0.0 91.0
2014-4 223368.0 65.0 0.0 65.0
2015-1 231435.0 77.0 0.0 77.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
109806723 2012-11-01 On the day of my inspection the rig was drilling in the lateral section at 13429ft. No violations were noted.
-1303550371 2012-12-17 On the day of my inspection completion efforts had not begun. There was no activity taking place. No violations noted.
-1333222979 2013-01-15 On the day of my inspection Ed Smith with XTO was on site. Basic was on site to drill out cement but they were waiting on pipe. No violations noted.
1342741658 2012-07-18 Inspection revealed that driller twisted off down hole motor and bit assembly and after several attempts to retrieve it decision was made to set plug in well bore and then directional drill around lost drill bit@6694' rig crew ran 6641' of drill pipe in well and set 600' plug with 520 sacks ,O-Tex was cement contractor cement plug top should be@600' will confirm when they go back in well to side track around lost down hole motor.
1350769989 2012-10-18 On the day of my inspection rig was still down and waiting on top head drive parts. No violations noted.
-1416092894 2012-10-19 Call from company man that rig had been fixed and they were back to drilling.
-1481130018 2012-10-25 On the day of my inspection the rig was drilling in the lateral section. No violations were noted.
-1503596207 2013-02-20 On the day of my inspection the Universal Well Services were stimulating the well. No violations noted.
1867908711 2013-02-13 On the day of my inspection Universal Well Services was on site stimulating the well. I spoke with Ed Smith of XTO who advised that they will be completing 7 stages and drilling out the plugs after commencement of the stimulation. No violations noted.
2058010280 2013-01-31 On the day of my inspection the company was preparing for fracing operations. The earth pit was being filled with fresh water. Universal was present. No violations noted.
-273165630 2012-10-05 Inspection revealed that they were at core point@10,120' rig was circulating well preparing to come out of hole to core potential producing formation.
375593663 2012-11-07 On the day of my inspection rig was drilling the lateral section at 16,075 ft. TD will be 16,090ft. No violations noted.
-430586749 2013-05-16 On site with local inspector Andrew Corder to look over restoration work preformed at site and I told inspector Corder that once vegetation is fully established restoration work would be satisfactory.
475297944 2013-01-24 On the day of my inspection the shoe had been drilled out and perforations were made. Rig moving to 20653. No violations noted.
-488702628 2014-02-27 On the day of my inspection the well had all equipment to be capable of production. No violations noted.
817079473 2014-10-23 This site has proper erosion and sediment controls preliminary restoration on this site is complete.
-887517782 2013-02-14 On the day of my inspection I was accompanied by Inspector Dave Ball. Universal Well Services was on site to stimulate the well. They had to wait on sand truck for a while. No violations noted.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.