If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-133-22736 | | Well ID: 34-133-22736 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.23289036, -81.09402203 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Portage County, Ohio|Portage]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[B & B OILFIELD SER INC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 1985-04-02 | | Spud Date: 1985-04-02 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Active Injection |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.23289036 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.09402203 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1014109921 | | -1014109921 | ||
| 2008-08-19 | | 2008-08-19 | ||
− | | | + | | |
| Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | Phone Call |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | Field Visit or Inspection |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | Phone Call |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | The | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | Compliance Notice |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | Compliance Notice |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | 2008- | + | | 2008-08-19 |
− | | | + | | |
− | | Quarterly status check inspection found | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | Phone Call |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | Quarterly status check inspection found | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | Field Visit or Inspection |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | Phone Call |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | + | | | |
− | The well | + | | |
− | | | + | | Phone Call |
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | Phone Call |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | Quarterly status check inspection found | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | | + | | 2008-08-19 |
− | | | + | | |
− | | | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | + | | | |
− | + | | | |
− | | | + | | |
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
− | | - | + | | -1014109921 |
− | | 2008- | + | | 2008-08-19 |
− | | | + | | |
− | | Quarterly status check inspection found | + | | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1059931860 |
− | | | + | | 2012-09-13 |
− | | | + | | |
− | | | + | | I witnessed the installation of the packer. All conditions were acceptable. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 1072515087 |
− | | | + | | 2012-03-13 |
− | | | + | | |
− | | | + | | No violatons were found at the time of my inspection of this well site. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1106455754 |
− | + | | 2013-12-03 | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | 2013 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
| There were no violations at the time of inspection. | | There were no violations at the time of inspection. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1133467630 |
− | | | + | | 2013-09-27 |
− | | | + | | |
− | | | + | | My inspection of the well and injection facility found no violations. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -119129650 |
− | | 2007- | + | | 2007-09-05 |
− | + | | | |
− | + | | The valves have been replaced as requested so that pressures could be taken. B&B Oilfield still needs to replace the two-pen recorder as required as an operating condition. | |
− | + | | | |
− | + | | | |
− | | | + | | |
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1192819062 | | 1192819062 | ||
| 2007-10-12 | | 2007-10-12 | ||
− | | | + | | |
− | | During a status check inspection, I found that the packer and/or tubing had lost integrity. The injection pressure, tubing to 4-1/2 annular pressure and the 4-1/2 to 8-5/8 | + | | During a status check inspection, I found that the packer and/or tubing had lost integrity. The injection pressure, tubing to 4-1/2 annular pressure and the 4-1/2 to 8-5/8 annular pressure were all equalized at 860 psi. The fact that the tubing to 4-1/2 casing annulus and the 4-1/2 to 8-5/8 annulus were equalized also indicates that there has been a mechanical failure of the 4-1/2 casing. I called Dave Ballentine with B&B and ordered him to cease injection operations at this well and waited until a driver arrived and shut the system down. I also called Tom Tomastik and advised him of the findings. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1193168012 | | 1193168012 | ||
| 2007-10-17 | | 2007-10-17 | ||
− | | | + | | |
− | | On 10/16, Bub's Well Service was on site to unseat the packer and pull the tubing. On 10/17, Bub's ran a reconditioned Halliburton R-4 and a relatively new string of 2-3/8 | + | | On 10/16, Bub's Well Service was on site to unseat the packer and pull the tubing. On 10/17, Bub's ran a reconditioned Halliburton R-4 and a relatively new string of 2-3/8 upset tubing. The packer was set in tension at 3861'. Superior Well Service mixed 5 gallons of concentrated inhibitor in 70 bbl of fresh water. The inhibitor was pumped down the tubing and up the annulus between the tubing and the 4-1/2 casing. After circulating the inhibitor to surface, Superior pressured up on the annulus and completed the MIT. The initial shut in pressure was 1020 psi. After 5 minutes the pressure remained 1020 psi. After 10 minutes, the pressure dropped to 1015 psi. The final pressure after 15 minutes was 1015 psi. After passing the MIT the pressure was released by opening the valve on the 8-5/8 casing further proving that the 4-1/2 casing has failed and is communicating with the 8-5/8 surface casing. The failure is assumed to be near the surface since cement was circulated to surface when the 4-1/2 was completed. Dave Ballentine was on site to witness the job and understands the importance of having a properly functioning two pen pressure meter recording the injection pressure and the annular pressure. The charts will be available for review at B&B's office. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1193767440 | | 1193767440 | ||
| 2007-10-22 | | 2007-10-22 | ||
− | | | + | | |
| The two pen recorder is in place and appears to be functioning correctly. No violations at this time. | | The two pen recorder is in place and appears to be functioning correctly. No violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1199664868 | | 1199664868 | ||
| 2003-06-17 | | 2003-06-17 | ||
− | | | + | | |
| Status check inspection - no violations at this time. Notified the water truck driver of a small leak on the annular bull plug which he will correct. | | Status check inspection - no violations at this time. Notified the water truck driver of a small leak on the annular bull plug which he will correct. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1208970837 | ||
+ | | 2005-11-30 | ||
+ | | | ||
+ | | Status check inspection of this salt water injection well. No violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1216i191 | | 1216i191 | ||
| 2002-01-25 | | 2002-01-25 | ||
− | | | + | | |
| Site visit this date indicated that the company has not yet removed the oil spill inside the tank battery dike. Check this date was to update status not yet due. Met with the company and reminded them of the due date. Pressures were not taken this date. Insection was to only update the cleanup progress. Last inspection date 01-04-2002. | | Site visit this date indicated that the company has not yet removed the oil spill inside the tank battery dike. Check this date was to update status not yet due. Met with the company and reminded them of the due date. Pressures were not taken this date. Insection was to only update the cleanup progress. Last inspection date 01-04-2002. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1216i2454282 | | 1216i2454282 | ||
| 2001-11-07 | | 2001-11-07 | ||
− | | | + | | |
| No violations notede this date. Las inspection: 09-12-2001. Well is in operation this date. | | No violations notede this date. Las inspection: 09-12-2001. Well is in operation this date. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1231413483 | | 1231413483 | ||
| 2006-05-16 | | 2006-05-16 | ||
− | | | + | | |
| The brine scald at the injection well needs to be reclaimed. The scald was first detected during a routine inspection of the disposal system on May 2, 2006. Dave Ballentine requested permission to reclaim the area when he had equipment on site to repair the tubing leak which caused the scald. I told him that he had two weeks to reclaim the area. The May 16 inspection found that no work had been completed. I stopped at B&B's office and left a message for Dave Ballentine that the work needs to be done immediately. | | The brine scald at the injection well needs to be reclaimed. The scald was first detected during a routine inspection of the disposal system on May 2, 2006. Dave Ballentine requested permission to reclaim the area when he had equipment on site to repair the tubing leak which caused the scald. I told him that he had two weeks to reclaim the area. The May 16 inspection found that no work had been completed. I stopped at B&B's office and left a message for Dave Ballentine that the work needs to be done immediately. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1232315130 | ||
+ | | 2008-11-20 | ||
+ | | | ||
+ | | Quarterly status check inspection found that the well injection pressure exceeded that maximum allowable by 270 psi. I called Dave Ballentine and told him to correct the problem. He said that the high pressure is related to recent large quantities of flowback water entering the system. He will have the pump rate reduced to lower the injection pressure. I will check the well again in the next few days. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1240493841 | ||
+ | | 2010-12-27 | ||
+ | | | ||
+ | | Quarterly status check inspection found that the system was operating. The lease road to the wellhead was drifted over so injection pressures were obtained in the pump house. No violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 124106806 | | 124106806 | ||
| 2009-03-03 | | 2009-03-03 | ||
− | | | + | | |
| Quarterly status check inspection found no violations at this time. The injection pressure (935 psi) was above the maximum allowable (890 psi) and I told the operator to reduce the injection pressure to at or below the allowable. | | Quarterly status check inspection found no violations at this time. The injection pressure (935 psi) was above the maximum allowable (890 psi) and I told the operator to reduce the injection pressure to at or below the allowable. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1250515992 | | 1250515992 | ||
| 2009-08-11 | | 2009-08-11 | ||
− | | | + | | |
| Quarterly status check inspection found no violations at this time. | | Quarterly status check inspection found no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1298914819 | | 1298914819 | ||
| 2011-02-15 | | 2011-02-15 | ||
− | | | + | | |
| Quarterly status check inspection found no violations at this time. | | Quarterly status check inspection found no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1304359619 | ||
+ | | 2003-04-15 | ||
+ | | | ||
+ | | UIC Inspection - an unknown quantity of crude oil and/or brine was released into the secondary containment dike when the sump pump failed to shut off and a 210 bbl tank was overfilled. Oil had impacted the southern half of the containment dike and was floating on the water. According to the water truck driver on site, the spill occurred on or about 4/05. It appears that very little has happened since then to remediate the spill. The operator was given seven days to clean the retention dike. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1306876540 | | 1306876540 | ||
| 2011-05-18 | | 2011-05-18 | ||
− | | | + | | |
| Quarterly status check inspection found no violations at this time. | | Quarterly status check inspection found no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1360035684 | | 1360035684 | ||
| 2012-10-09 | | 2012-10-09 | ||
− | | | + | | |
| I performed a mechanical integrity test on the flow line between the well and the pump house. 1220 psi. of pressure was placed on the flow line and monitored for fifteen minutes. There was no pressure loss observed. | | I performed a mechanical integrity test on the flow line between the well and the pump house. 1220 psi. of pressure was placed on the flow line and monitored for fifteen minutes. There was no pressure loss observed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1396571974 | | 1396571974 | ||
| 2014-03-28 | | 2014-03-28 | ||
− | | | + | | |
| The were no violations at the time of inspection. | | The were no violations at the time of inspection. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1401733532 | | 1401733532 | ||
| 2014-05-30 | | 2014-05-30 | ||
− | | | + | | |
| An inspection of the well and injection facility found no violations. | | An inspection of the well and injection facility found no violations. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1429731911 | ||
+ | | 2013-03-07 | ||
+ | | | ||
+ | | My inspection of the injection well and surface facility found no violations. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1455463822 | ||
+ | | 2004-06-21 | ||
+ | | | ||
+ | | The impacted soil and vegetation has been tilled and reportedly limed. If seed does not germinate properly, then the impacted soil must be removed, disposed and replaced. The contamination around the loading area has not been addressed. The site will continue to be monitored regularly. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1457855282 | | 1457855282 | ||
| 2012-08-13 | | 2012-08-13 | ||
− | | | + | | |
| My inspection of the injection facility was accompanied by another inspector, Stephen Tompkins. | | My inspection of the injection facility was accompanied by another inspector, Stephen Tompkins. | ||
− | A contractor was cutting up the tanks for disposal. | + | A contractor was cutting up the tanks for disposal. |
There were no violations at the time of inspection. | There were no violations at the time of inspection. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1503128387 | ||
+ | | 2012-09-13 | ||
+ | | | ||
+ | | I performed a mechanical integrity test on the well. A pressure of 1050 pounds per square inch (psi.) was placed on the tubing-casing annulus. A loss of 5 psi. was observed during a 15 minute period. | ||
+ | |||
+ | The well passed the test. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1512155005 | ||
+ | | 2004-11-15 | ||
+ | | | ||
+ | | Status check inspection - no violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -155348148 | ||
+ | | 2012-12-18 | ||
+ | | | ||
+ | | My inspection of the injection facility and well found no violations. The pump was off, while the pressures were gauged. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1585191837 | | 1585191837 | ||
| 2006-05-26 | | 2006-05-26 | ||
− | | | + | | |
− | | The top joint of tubing developed a leak. Bub's Well Service was on site to replace the bad joint and pull and replace the packer. A new Halliburton R-4 packer was set in tension. During the following MIT, the valve on the 8-5/8 | + | | The top joint of tubing developed a leak. Bub's Well Service was on site to replace the bad joint and pull and replace the packer. A new Halliburton R-4 packer was set in tension. During the following MIT, the valve on the 8-5/8 wellhead started leaking and the test failed. The leaking valve was replaced and the 15 minute MIT passed. It appears that there is a problem with the 4-1/2 casing but the tubing and packer are properly set. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1588283093 | | 1588283093 | ||
| 2004-06-10 | | 2004-06-10 | ||
− | | | + | | |
| During a status check inspection of this brine disposal well, a sump pump in the containment dike was found to be discharging water out of the dike and down the hillside. The result was a brine scald that affected an area 20 feet wide and 150 feet long. The scald is marked by dead vegetation. A representative of B&B was told to 1) remove and properly dispose of the dead vegetation and impacted soil; 2) lime, seed and mulch the affected area; 3) pump all water inside of the dike into the disposal system and 4) clean the loading pad area. Failure to comply will result in OEPA notification of illegal brine dumping with the recommendation for fines. | | During a status check inspection of this brine disposal well, a sump pump in the containment dike was found to be discharging water out of the dike and down the hillside. The result was a brine scald that affected an area 20 feet wide and 150 feet long. The scald is marked by dead vegetation. A representative of B&B was told to 1) remove and properly dispose of the dead vegetation and impacted soil; 2) lime, seed and mulch the affected area; 3) pump all water inside of the dike into the disposal system and 4) clean the loading pad area. Failure to comply will result in OEPA notification of illegal brine dumping with the recommendation for fines. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | -1592405475 |
− | | | + | | 2012-08-20 |
− | | | + | | |
− | | | + | | My inspection of the injection facility was accompanied by another inspector, Tom Hill. |
− | | | + | |
− | | | + | A layer of gravel was installed inside the facility dike area. |
− | | | + | |
+ | There were no violations at the time of inspection. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1599001365 | | 1599001365 | ||
| 2007-11-27 | | 2007-11-27 | ||
− | | | + | | |
| Quarterly status check inspection found no violations at this time. | | Quarterly status check inspection found no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1600809399 | | 1600809399 | ||
| 2005-10-20 | | 2005-10-20 | ||
− | | | + | | |
| FAILURE TO SUBMIT ANNUAL SALTWATER INJECTION WELL REPORT FOR 2004 | | FAILURE TO SUBMIT ANNUAL SALTWATER INJECTION WELL REPORT FOR 2004 | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1637227980 | ||
+ | | 2010-03-18 | ||
+ | | | ||
+ | | Quarterly status check inspection found that the operator has again pumped water from inside the containment area with a sump pump. The discharged water contained sufficient chlorides to kill the grass. I called Dave Ballentine and told him to stop pumping the water in the containment area anywhere but into the disposal system and to reclaim the affected area from both this incident and the packer failure last year. I also advised him that they were injecting just above the maximum allowable pressure. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1643630657 | ||
+ | | 2009-07-24 | ||
+ | | | ||
+ | | Hagen Well Service was on site to run a rebuilt Halliburton R-4 packer into the well. The packer was set in tension at 3858'. Northeast Water Service mixed 80 bbl of fresh water with 5 gallons of inhibitor. Superior Well Service pumped the water/inhibitor mixture down the annulus and circulated up the tubing. The packer was set and the annulus was pressured up to 1030 psi. After 5 minutes the pressure was 1015 psi, after 10 minutes 1005 psi and after 15 minutes 995 psi. The total pressure loss was less than 5%. The well passed the MIT. | ||
+ | |||
+ | After passing the MIT, Superior treated the well with 500 gallons of 15% HCl acid. The acid was displaced pass the packer and into the formation. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -166478873 | ||
+ | | 2008-05-21 | ||
+ | | | ||
+ | | Quarterly status check inspection found that the injection pressure exceeded the allowable by 20 psi. Dave Ballentine was notified and told to reduce the injection pressure. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1708673295 | | 1708673295 | ||
| 2003-09-18 | | 2003-09-18 | ||
− | | | + | | |
| Status check inspection - no violations at this time. | | Status check inspection - no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1710978018 | ||
+ | | 2004-10-06 | ||
+ | | | ||
+ | | Status check inspection. The facility is being painted and fresh stone has been placed inside of the containment dike. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1721862897 | | 1721862897 | ||
| 2012-07-27 | | 2012-07-27 | ||
− | | | + | | |
| The tanks were removed from the facility. A frac tank and three of the vertical tanks were on location. | | The tanks were removed from the facility. A frac tank and three of the vertical tanks were on location. | ||
There were no violations. | There were no violations. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1747477994 | ||
+ | | 2007-02-20 | ||
+ | | | ||
+ | | Quarterly status check inspection found no violations at this time. The two pen chart recorder was half full of brine indicating some annular discharge. The pressure differential does not indicate that there has been a packer failure. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1753451383 | | 1753451383 | ||
| 2012-09-05 | | 2012-09-05 | ||
− | | | + | | |
| Unloading pad | | Unloading pad | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1782018499 | | 1782018499 | ||
| 2010-04-06 | | 2010-04-06 | ||
− | | | + | | |
| The brine scald remediation and pipeline reclamation has not been completed. | | The brine scald remediation and pipeline reclamation has not been completed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -181031116 | ||
+ | | 2009-11-17 | ||
+ | | | ||
+ | | Quarterly status check inspection found no violations at this time. The affected area near the wellhead still needs to be seeded and mulched. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1827953441 | ||
+ | | 2010-08-26 | ||
+ | | | ||
+ | | Quarterly status check inspection found no violations at this time. The injection pressure was just above the allowable and I ordered the company representative to lower the pressure. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1847595892 | ||
+ | | 2003-11-25 | ||
+ | | | ||
+ | | UIC inspection - no violations at this time - injection pressure 0# annular pressure 150#. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1870348343 | | 1870348343 | ||
| 2013-06-12 | | 2013-06-12 | ||
− | | | + | | |
| My inspection of the well and surface facility found no violations. | | My inspection of the well and surface facility found no violations. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1875093336 | | 1875093336 | ||
| 2005-06-01 | | 2005-06-01 | ||
− | | | + | | |
| Status check inspection for this salt water disposal well. No violations at this time. | | Status check inspection for this salt water disposal well. No violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1885353325 | | 1885353325 | ||
| 2002-01-25 | | 2002-01-25 | ||
− | | | + | | |
| FOLLOW UP TO NOV # 1216i191 Site visit this date indicated that the company has not yet removed the oil spill inside the tank battery dike. Check this date was to update status not yet due. Met with the company and reminded them of the due date. Pressures were not taken this date. | | FOLLOW UP TO NOV # 1216i191 Site visit this date indicated that the company has not yet removed the oil spill inside the tank battery dike. Check this date was to update status not yet due. Met with the company and reminded them of the due date. Pressures were not taken this date. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1904408087 | ||
+ | | 2003-05-20 | ||
+ | | | ||
+ | | The pollution violation inside of the tank battery has been corrected. No violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1912034201 | | 1912034201 | ||
| 2005-08-23 | | 2005-08-23 | ||
− | | | + | | |
| Bub's Well Service was on site to repair the top joint of tubing that had developed a pinhole leak. They had released the pressure, exposed the top joint of tubing approximately 8 inches below the collar and were welding a patch onto the tubing. Barton Well Service was on site to pressure up on the annulus after the wellhead was put back together. I asked for 200 psi. I will check the well again next week. | | Bub's Well Service was on site to repair the top joint of tubing that had developed a pinhole leak. They had released the pressure, exposed the top joint of tubing approximately 8 inches below the collar and were welding a patch onto the tubing. Barton Well Service was on site to pressure up on the annulus after the wellhead was put back together. I asked for 200 psi. I will check the well again next week. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1930535466 | ||
+ | | 2013-01-04 | ||
+ | | | ||
+ | | My inspection of the surface facility and injection well found no violations. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2009379967 | ||
+ | | 2014-07-22 | ||
+ | | | ||
+ | | There were no violations at the time of inspection. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -2009705250 | ||
+ | | 2005-02-22 | ||
+ | | | ||
+ | | Status check inspection of this salt water disposal well and storage system. No violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 2037799654 | | 2037799654 | ||
| 2009-05-12 | | 2009-05-12 | ||
− | | | + | | |
| Quarterly status check inspection found no violations at this time. The well continues to operate at maximum allowable injection pressures. | | Quarterly status check inspection found no violations at this time. The well continues to operate at maximum allowable injection pressures. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 2135131768 | | 2135131768 | ||
| 2003-04-17 | | 2003-04-17 | ||
− | | | + | | |
| NOV followup with Supervisor Cheslock. B&B personnel were on site washing gravel in the dike area with water and a broom. Permission was given to continue washing and to arrange for hot water to be brought in as soon as possible to complete the washing. | | NOV followup with Supervisor Cheslock. B&B personnel were on site washing gravel in the dike area with water and a broom. Permission was given to continue washing and to arrange for hot water to be brought in as soon as possible to complete the washing. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 2154i125 | | 2154i125 | ||
| 2002-04-24 | | 2002-04-24 | ||
− | | | + | | |
| Well was not running during inspection. Active clean-up of crude oil floating on water within the diked area. NO VIOLATIONS. | | Well was not running during inspection. Active clean-up of crude oil floating on water within the diked area. NO VIOLATIONS. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 2154i246 | | 2154i246 | ||
| 2002-06-25 | | 2002-06-25 | ||
− | | | + | | |
| System not running. NO VIOLATIONS. | | System not running. NO VIOLATIONS. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 2154i398 | | 2154i398 | ||
| 2002-08-22 | | 2002-08-22 | ||
− | | | + | | |
| Rain water with oil scum in corner of tank battery dike. System was not running. NO VIOLATIONS. | | Rain water with oil scum in corner of tank battery dike. System was not running. NO VIOLATIONS. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 236547283 | | 236547283 | ||
| 2003-04-25 | | 2003-04-25 | ||
− | | | + | | |
| The spill cleanup inside of the dike is progressing. The impacted gravel is being washed and the oil and water vaccumed from the dike. An extension is granted to 05/15 to complete the spill remediation. | | The spill cleanup inside of the dike is progressing. The impacted gravel is being washed and the oil and water vaccumed from the dike. An extension is granted to 05/15 to complete the spill remediation. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -276093403 | ||
+ | | 2006-02-23 | ||
+ | | | ||
+ | | Status check inspection - no violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -289445625 | ||
+ | | 2006-12-11 | ||
+ | | | ||
+ | | Quarterly status inspection found no violations at this time. The two pen recorder has been installed as requested. The chart indicates that as the pressure increases during injection, there is no increase in annular pressure. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -291155340 | ||
+ | | 2008-02-25 | ||
+ | | | ||
+ | | Quarterly status check inspection of this salt water injection well found no violations at this time. The annulus has been plumbed back to the pumphouse with a pressure release valve. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -374435068 | ||
+ | | 2009-07-23 | ||
+ | | | ||
+ | | Dave Ballentine reported suspected packer failure at this disposal well. The brine return line connected to the annular space between the 4-1/2 production casing and the 8-5/8 surface casing started to flow indicating communication from the tubing, to the production casing and the surface casing. Hagen Well Service was on site today to unseat and remove the tubing and the packer. Sutton Pump was scheduled to be on site later today to pressure test the tubing string. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -409068405 | ||
+ | | 2014-11-12 | ||
+ | | | ||
+ | | The injection well and surface facility were inspected. There were no violations found at the time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -447751265 | ||
+ | | 2013-08-01 | ||
+ | | | ||
+ | | There were no violations at the time of inspection. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | -474408432 |
− | | | + | | 2007-05-08 |
− | | | + | | |
− | | | + | | Quarterly status check found that the required two pen meter has malfunctioned. I called Dave Ballentine who said that he has already contacted Midway Supply about repairing or replacing the meter. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 486701573 | | 486701573 | ||
| 2004-07-07 | | 2004-07-07 | ||
− | | | + | | |
| The brine scald has been corrected. The loading pad still needs additional cleaning. | | The brine scald has been corrected. The loading pad still needs additional cleaning. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 488494298 | | 488494298 | ||
| 2004-02-19 | | 2004-02-19 | ||
− | | | + | | |
| Status check inspectio - no violations at this time. 740# injection and 0# annulus. | | Status check inspectio - no violations at this time. 740# injection and 0# annulus. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -563645313 | ||
+ | | 2014-09-30 | ||
+ | | | ||
+ | | An inspection of the well and injection facility found no violations. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 566639822 | | 566639822 | ||
| 2004-09-09 | | 2004-09-09 | ||
− | | | + | | |
| Barton Oilfield Service was contracted to steam clean the tank battery and the stone pad. The work was completed with satisfactory results. Water generated while cleaning was recovered by a Northeast water truck and disposed in the injection system. The violation has been corrected. | | Barton Oilfield Service was contracted to steam clean the tank battery and the stone pad. The work was completed with satisfactory results. Water generated while cleaning was recovered by a Northeast water truck and disposed in the injection system. The violation has been corrected. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 567229873 | | 567229873 | ||
| 2006-06-02 | | 2006-06-02 | ||
− | | | + | | |
− | | Met on site with Dave Ballentine to conduct a pump test on this well. This pump test was initiated by the results of the MIT completed on May 26. The ball valve located on the 8-5/8 | + | | Met on site with Dave Ballentine to conduct a pump test on this well. This pump test was initiated by the results of the MIT completed on May 26. The ball valve located on the 8-5/8 casing head was opened and the pump was turned on. Injection pressure built to 700 psi with no fluid loss from the ball valve. It appears that there is no problem with either the packer or the tubing. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 570320205 | | 570320205 | ||
| 2011-08-04 | | 2011-08-04 | ||
− | | | + | | |
| I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 655000901 | | 655000901 | ||
| 2011-11-02 | | 2011-11-02 | ||
− | | | + | | |
| I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 6679058 | | 6679058 | ||
| 2002-02-28 | | 2002-02-28 | ||
− | | | + | | |
| Well was not running. Unable to check previous tank battery contamination due to excess snow cover. Violation is pending. | | Well was not running. Unable to check previous tank battery contamination due to excess snow cover. Violation is pending. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 674997017 | ||
+ | | 2015-03-31 | ||
+ | | | ||
+ | | The injection well and surface facility were inspected. There were no violations found at the time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -678122122 | ||
+ | | 2007-08-31 | ||
+ | | | ||
+ | | On 8/24, attempted to complete the quarterly inspection for this brine disposal well. Instead I found the required two pen recorder was still missing, the needle valve on the annulus could not be opened or closed and there was a leak on the 8-5/8 casing valve. I called Dave Ballentine and requested that these issues be corrected by 8/31 so that the quarterly inspection could be completed. On 8/31, I found that none of the requested work was compelted. I called Dave Ballentine and told him that until this work was completed and the required inspection performed, the well was shut down and could not be used for brine disposal. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -72090206 | ||
+ | | 2012-11-01 | ||
+ | | | ||
+ | | My inspection of the injection facility and well found no violations. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -721191558 | ||
+ | | 2006-05-02 | ||
+ | | | ||
+ | | Status check inspection found a leak at the wellhead which caused a brine scald extending 50 feet from the well. The ID was missing from the brine storage area. I called Dave Ballentine and told him that the scald area needs to be reclaimed, the leak repaired and the ID replaced. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 728432306 | | 728432306 | ||
| 2004-08-12 | | 2004-08-12 | ||
− | | | + | | |
| Salt water disposal well - status check inspection. Free oil and brine was found inside of the containment dike. Sloppy operations and a malfunctioning pump are to blame. The gravel inside of the dike area needs to be either cleaned or removed and replaced. | | Salt water disposal well - status check inspection. Free oil and brine was found inside of the containment dike. Sloppy operations and a malfunctioning pump are to blame. The gravel inside of the dike area needs to be either cleaned or removed and replaced. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -738576898 | ||
+ | | 2013-05-14 | ||
+ | | | ||
+ | | My inspection of the well and surface facility found no violations. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 744188355 | | 744188355 | ||
| 2010-05-11 | | 2010-05-11 | ||
− | | | + | | |
| Quarterly status check inspection found no violations at this time. | | Quarterly status check inspection found no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 76505439 | | 76505439 | ||
| 2008-06-04 | | 2008-06-04 | ||
− | | | + | | |
| Injection pressures are now less than the maximum pressure of 890 psi. | | Injection pressures are now less than the maximum pressure of 890 psi. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -83384368 | ||
+ | | 2004-06-28 | ||
+ | | | ||
+ | | The grass seed has started to germinate and will probably recover. The loading pad still needs to be cleaned and the debris properly disposed. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -857218815 | ||
+ | | 2003-05-07 | ||
+ | | | ||
+ | | The spill remediation inside of the tank battery dike is continuing. Impacted vegetation still needs to be removed and impacted gravel from the southern half of the dike area needs to be either washed or removed. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 877984231 | | 877984231 | ||
| 2013-01-08 | | 2013-01-08 | ||
− | | | + | | |
| I performed a mechanical integrity test on the well. 1020 psi. was place on the tubing/casing annulus and monitored for fifteen minutes. There was no pressure loss observed. | | I performed a mechanical integrity test on the well. 1020 psi. was place on the tubing/casing annulus and monitored for fifteen minutes. There was no pressure loss observed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -929208054 | ||
+ | | 2014-01-31 | ||
+ | | | ||
+ | | No violations were found at the time of inspection. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -955456334 | ||
+ | | 2009-07-14 | ||
+ | | | ||
+ | | Dave Ballentine with B&B Oilfield Service reported that the casing and tubing had equalized indicating a packer failure. I ordered B&B to cease operations and schedule a service rig to unseat and pull the packer. I notified Tom Tomastik of the problems. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 99379283 | | 99379283 | ||
| 2006-08-30 | | 2006-08-30 | ||
− | | | + | | |
− | | Quarterly status check inspection. I spoke with Dave Ballentine about setting a two pen recorder on the injection and annular side of this well. As noted during the previous MIT, it appears that there has been a failure of the 4-1/2 | + | | Quarterly status check inspection. I spoke with Dave Ballentine about setting a two pen recorder on the injection and annular side of this well. As noted during the previous MIT, it appears that there has been a failure of the 4-1/2 casing. The two pen chart can track annular vs injection pressures and identify any packer failure. No violations at this time. |
− | | | + | | |
− | | | + | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
|- | |- | ||
| iGMM0000122 | | iGMM0000122 | ||
| 2000-05-26 | | 2000-05-26 | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| PL6339 | | PL6339 | ||
− | | | + | | |
− | | | + | | |
| Preliminary Restoration done information from Data Point | | Preliminary Restoration done information from Data Point | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| UIC1728 | | UIC1728 | ||
| 1997-04-10 | | 1997-04-10 | ||
− | | | + | | |
| 1509.22 & 1501:9-3-07 (H) ANNULUS VALVE LEAK | | 1509.22 & 1501:9-3-07 (H) ANNULUS VALVE LEAK | ||
− | | | + | | |
− | | | + | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
|- | |- | ||
| UIC1794 | | UIC1794 | ||
| 1999-08-05 | | 1999-08-05 | ||
− | | | + | | |
| 1509.03, 1501:9-3-07 (H) VALVE LEAKING | | 1509.03, 1501:9-3-07 (H) VALVE LEAKING | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-133-22736 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.23289036,"lon":-81.09402203,"icon":""}]} |
County: Portage | |
Municipality: | |
Operator Name: B & B OILFIELD SER INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1985-04-02 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 41.23289036 | |
Longitude: -81.09402203 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Phone Call | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Field Visit or Inspection | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Phone Call | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Compliance Notice | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Compliance Notice | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Phone Call | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Field Visit or Inspection | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Phone Call | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Phone Call | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | Phone Call | |||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||||
-1014109921 | 2008-08-19 | Quarterly status check inspection found no violations at this time. The well is operating below the maximum allowable injection pressure. | ||||
-1059931860 | 2012-09-13 | I witnessed the installation of the packer. All conditions were acceptable. | ||||
1072515087 | 2012-03-13 | No violatons were found at the time of my inspection of this well site. | ||||
-1106455754 | 2013-12-03 | There were no violations at the time of inspection. | ||||
-1133467630 | 2013-09-27 | My inspection of the well and injection facility found no violations. | ||||
-119129650 | 2007-09-05 | The valves have been replaced as requested so that pressures could be taken. B&B Oilfield still needs to replace the two-pen recorder as required as an operating condition. | ||||
1192819062 | 2007-10-12 | During a status check inspection, I found that the packer and/or tubing had lost integrity. The injection pressure, tubing to 4-1/2 annular pressure and the 4-1/2 to 8-5/8 annular pressure were all equalized at 860 psi. The fact that the tubing to 4-1/2 casing annulus and the 4-1/2 to 8-5/8 annulus were equalized also indicates that there has been a mechanical failure of the 4-1/2 casing. I called Dave Ballentine with B&B and ordered him to cease injection operations at this well and waited until a driver arrived and shut the system down. I also called Tom Tomastik and advised him of the findings. | ||||
1193168012 | 2007-10-17 | On 10/16, Bub's Well Service was on site to unseat the packer and pull the tubing. On 10/17, Bub's ran a reconditioned Halliburton R-4 and a relatively new string of 2-3/8 upset tubing. The packer was set in tension at 3861'. Superior Well Service mixed 5 gallons of concentrated inhibitor in 70 bbl of fresh water. The inhibitor was pumped down the tubing and up the annulus between the tubing and the 4-1/2 casing. After circulating the inhibitor to surface, Superior pressured up on the annulus and completed the MIT. The initial shut in pressure was 1020 psi. After 5 minutes the pressure remained 1020 psi. After 10 minutes, the pressure dropped to 1015 psi. The final pressure after 15 minutes was 1015 psi. After passing the MIT the pressure was released by opening the valve on the 8-5/8 casing further proving that the 4-1/2 casing has failed and is communicating with the 8-5/8 surface casing. The failure is assumed to be near the surface since cement was circulated to surface when the 4-1/2 was completed. Dave Ballentine was on site to witness the job and understands the importance of having a properly functioning two pen pressure meter recording the injection pressure and the annular pressure. The charts will be available for review at B&B's office. | ||||
1193767440 | 2007-10-22 | The two pen recorder is in place and appears to be functioning correctly. No violations at this time. | ||||
1199664868 | 2003-06-17 | Status check inspection - no violations at this time. Notified the water truck driver of a small leak on the annular bull plug which he will correct. | ||||
-1208970837 | 2005-11-30 | Status check inspection of this salt water injection well. No violations at this time. | ||||
1216i191 | 2002-01-25 | Site visit this date indicated that the company has not yet removed the oil spill inside the tank battery dike. Check this date was to update status not yet due. Met with the company and reminded them of the due date. Pressures were not taken this date. Insection was to only update the cleanup progress. Last inspection date 01-04-2002. | ||||
1216i2454282 | 2001-11-07 | No violations notede this date. Las inspection: 09-12-2001. Well is in operation this date. | ||||
1231413483 | 2006-05-16 | The brine scald at the injection well needs to be reclaimed. The scald was first detected during a routine inspection of the disposal system on May 2, 2006. Dave Ballentine requested permission to reclaim the area when he had equipment on site to repair the tubing leak which caused the scald. I told him that he had two weeks to reclaim the area. The May 16 inspection found that no work had been completed. I stopped at B&B's office and left a message for Dave Ballentine that the work needs to be done immediately. | ||||
-1232315130 | 2008-11-20 | Quarterly status check inspection found that the well injection pressure exceeded that maximum allowable by 270 psi. I called Dave Ballentine and told him to correct the problem. He said that the high pressure is related to recent large quantities of flowback water entering the system. He will have the pump rate reduced to lower the injection pressure. I will check the well again in the next few days. | ||||
-1240493841 | 2010-12-27 | Quarterly status check inspection found that the system was operating. The lease road to the wellhead was drifted over so injection pressures were obtained in the pump house. No violations at this time. | ||||
124106806 | 2009-03-03 | Quarterly status check inspection found no violations at this time. The injection pressure (935 psi) was above the maximum allowable (890 psi) and I told the operator to reduce the injection pressure to at or below the allowable. | ||||
1250515992 | 2009-08-11 | Quarterly status check inspection found no violations at this time. | ||||
1298914819 | 2011-02-15 | Quarterly status check inspection found no violations at this time. | ||||
-1304359619 | 2003-04-15 | UIC Inspection - an unknown quantity of crude oil and/or brine was released into the secondary containment dike when the sump pump failed to shut off and a 210 bbl tank was overfilled. Oil had impacted the southern half of the containment dike and was floating on the water. According to the water truck driver on site, the spill occurred on or about 4/05. It appears that very little has happened since then to remediate the spill. The operator was given seven days to clean the retention dike. | ||||
1306876540 | 2011-05-18 | Quarterly status check inspection found no violations at this time. | ||||
1360035684 | 2012-10-09 | I performed a mechanical integrity test on the flow line between the well and the pump house. 1220 psi. of pressure was placed on the flow line and monitored for fifteen minutes. There was no pressure loss observed. | ||||
1396571974 | 2014-03-28 | The were no violations at the time of inspection. | ||||
1401733532 | 2014-05-30 | An inspection of the well and injection facility found no violations. | ||||
-1429731911 | 2013-03-07 | My inspection of the injection well and surface facility found no violations. | ||||
-1455463822 | 2004-06-21 | The impacted soil and vegetation has been tilled and reportedly limed. If seed does not germinate properly, then the impacted soil must be removed, disposed and replaced. The contamination around the loading area has not been addressed. The site will continue to be monitored regularly. | ||||
1457855282 | 2012-08-13 | My inspection of the injection facility was accompanied by another inspector, Stephen Tompkins.
A contractor was cutting up the tanks for disposal. There were no violations at the time of inspection. |
||||
-1503128387 | 2012-09-13 | I performed a mechanical integrity test on the well. A pressure of 1050 pounds per square inch (psi.) was placed on the tubing-casing annulus. A loss of 5 psi. was observed during a 15 minute period.
The well passed the test. |
||||
-1512155005 | 2004-11-15 | Status check inspection - no violations at this time. | ||||
-155348148 | 2012-12-18 | My inspection of the injection facility and well found no violations. The pump was off, while the pressures were gauged. | ||||
1585191837 | 2006-05-26 | The top joint of tubing developed a leak. Bub's Well Service was on site to replace the bad joint and pull and replace the packer. A new Halliburton R-4 packer was set in tension. During the following MIT, the valve on the 8-5/8 wellhead started leaking and the test failed. The leaking valve was replaced and the 15 minute MIT passed. It appears that there is a problem with the 4-1/2 casing but the tubing and packer are properly set. | ||||
1588283093 | 2004-06-10 | During a status check inspection of this brine disposal well, a sump pump in the containment dike was found to be discharging water out of the dike and down the hillside. The result was a brine scald that affected an area 20 feet wide and 150 feet long. The scald is marked by dead vegetation. A representative of B&B was told to 1) remove and properly dispose of the dead vegetation and impacted soil; 2) lime, seed and mulch the affected area; 3) pump all water inside of the dike into the disposal system and 4) clean the loading pad area. Failure to comply will result in OEPA notification of illegal brine dumping with the recommendation for fines. | ||||
-1592405475 | 2012-08-20 | My inspection of the injection facility was accompanied by another inspector, Tom Hill.
A layer of gravel was installed inside the facility dike area. There were no violations at the time of inspection. |
||||
1599001365 | 2007-11-27 | Quarterly status check inspection found no violations at this time. | ||||
1600809399 | 2005-10-20 | FAILURE TO SUBMIT ANNUAL SALTWATER INJECTION WELL REPORT FOR 2004 | ||||
-1637227980 | 2010-03-18 | Quarterly status check inspection found that the operator has again pumped water from inside the containment area with a sump pump. The discharged water contained sufficient chlorides to kill the grass. I called Dave Ballentine and told him to stop pumping the water in the containment area anywhere but into the disposal system and to reclaim the affected area from both this incident and the packer failure last year. I also advised him that they were injecting just above the maximum allowable pressure. | ||||
-1643630657 | 2009-07-24 | Hagen Well Service was on site to run a rebuilt Halliburton R-4 packer into the well. The packer was set in tension at 3858'. Northeast Water Service mixed 80 bbl of fresh water with 5 gallons of inhibitor. Superior Well Service pumped the water/inhibitor mixture down the annulus and circulated up the tubing. The packer was set and the annulus was pressured up to 1030 psi. After 5 minutes the pressure was 1015 psi, after 10 minutes 1005 psi and after 15 minutes 995 psi. The total pressure loss was less than 5%. The well passed the MIT.
After passing the MIT, Superior treated the well with 500 gallons of 15% HCl acid. The acid was displaced pass the packer and into the formation. |
||||
-166478873 | 2008-05-21 | Quarterly status check inspection found that the injection pressure exceeded the allowable by 20 psi. Dave Ballentine was notified and told to reduce the injection pressure. | ||||
1708673295 | 2003-09-18 | Status check inspection - no violations at this time. | ||||
-1710978018 | 2004-10-06 | Status check inspection. The facility is being painted and fresh stone has been placed inside of the containment dike. | ||||
1721862897 | 2012-07-27 | The tanks were removed from the facility. A frac tank and three of the vertical tanks were on location.
There were no violations. |
||||
-1747477994 | 2007-02-20 | Quarterly status check inspection found no violations at this time. The two pen chart recorder was half full of brine indicating some annular discharge. The pressure differential does not indicate that there has been a packer failure. | ||||
1753451383 | 2012-09-05 | Unloading pad | ||||
1782018499 | 2010-04-06 | The brine scald remediation and pipeline reclamation has not been completed. | ||||
-181031116 | 2009-11-17 | Quarterly status check inspection found no violations at this time. The affected area near the wellhead still needs to be seeded and mulched. | ||||
-1827953441 | 2010-08-26 | Quarterly status check inspection found no violations at this time. The injection pressure was just above the allowable and I ordered the company representative to lower the pressure. | ||||
-1847595892 | 2003-11-25 | UIC inspection - no violations at this time - injection pressure 0# annular pressure 150#. | ||||
1870348343 | 2013-06-12 | My inspection of the well and surface facility found no violations. | ||||
1875093336 | 2005-06-01 | Status check inspection for this salt water disposal well. No violations at this time. | ||||
1885353325 | 2002-01-25 | FOLLOW UP TO NOV # 1216i191 Site visit this date indicated that the company has not yet removed the oil spill inside the tank battery dike. Check this date was to update status not yet due. Met with the company and reminded them of the due date. Pressures were not taken this date. | ||||
-1904408087 | 2003-05-20 | The pollution violation inside of the tank battery has been corrected. No violations at this time. | ||||
1912034201 | 2005-08-23 | Bub's Well Service was on site to repair the top joint of tubing that had developed a pinhole leak. They had released the pressure, exposed the top joint of tubing approximately 8 inches below the collar and were welding a patch onto the tubing. Barton Well Service was on site to pressure up on the annulus after the wellhead was put back together. I asked for 200 psi. I will check the well again next week. | ||||
-1930535466 | 2013-01-04 | My inspection of the surface facility and injection well found no violations. | ||||
2009379967 | 2014-07-22 | There were no violations at the time of inspection. | ||||
-2009705250 | 2005-02-22 | Status check inspection of this salt water disposal well and storage system. No violations at this time. | ||||
2037799654 | 2009-05-12 | Quarterly status check inspection found no violations at this time. The well continues to operate at maximum allowable injection pressures. | ||||
2135131768 | 2003-04-17 | NOV followup with Supervisor Cheslock. B&B personnel were on site washing gravel in the dike area with water and a broom. Permission was given to continue washing and to arrange for hot water to be brought in as soon as possible to complete the washing. | ||||
2154i125 | 2002-04-24 | Well was not running during inspection. Active clean-up of crude oil floating on water within the diked area. NO VIOLATIONS. | ||||
2154i246 | 2002-06-25 | System not running. NO VIOLATIONS. | ||||
2154i398 | 2002-08-22 | Rain water with oil scum in corner of tank battery dike. System was not running. NO VIOLATIONS. | ||||
236547283 | 2003-04-25 | The spill cleanup inside of the dike is progressing. The impacted gravel is being washed and the oil and water vaccumed from the dike. An extension is granted to 05/15 to complete the spill remediation. | ||||
-276093403 | 2006-02-23 | Status check inspection - no violations at this time. | ||||
-289445625 | 2006-12-11 | Quarterly status inspection found no violations at this time. The two pen recorder has been installed as requested. The chart indicates that as the pressure increases during injection, there is no increase in annular pressure. | ||||
-291155340 | 2008-02-25 | Quarterly status check inspection of this salt water injection well found no violations at this time. The annulus has been plumbed back to the pumphouse with a pressure release valve. | ||||
-374435068 | 2009-07-23 | Dave Ballentine reported suspected packer failure at this disposal well. The brine return line connected to the annular space between the 4-1/2 production casing and the 8-5/8 surface casing started to flow indicating communication from the tubing, to the production casing and the surface casing. Hagen Well Service was on site today to unseat and remove the tubing and the packer. Sutton Pump was scheduled to be on site later today to pressure test the tubing string. | ||||
-409068405 | 2014-11-12 | The injection well and surface facility were inspected. There were no violations found at the time. | ||||
-447751265 | 2013-08-01 | There were no violations at the time of inspection. | ||||
-474408432 | 2007-05-08 | Quarterly status check found that the required two pen meter has malfunctioned. I called Dave Ballentine who said that he has already contacted Midway Supply about repairing or replacing the meter. | ||||
486701573 | 2004-07-07 | The brine scald has been corrected. The loading pad still needs additional cleaning. | ||||
488494298 | 2004-02-19 | Status check inspectio - no violations at this time. 740# injection and 0# annulus. | ||||
-563645313 | 2014-09-30 | An inspection of the well and injection facility found no violations. | ||||
566639822 | 2004-09-09 | Barton Oilfield Service was contracted to steam clean the tank battery and the stone pad. The work was completed with satisfactory results. Water generated while cleaning was recovered by a Northeast water truck and disposed in the injection system. The violation has been corrected. | ||||
567229873 | 2006-06-02 | Met on site with Dave Ballentine to conduct a pump test on this well. This pump test was initiated by the results of the MIT completed on May 26. The ball valve located on the 8-5/8 casing head was opened and the pump was turned on. Injection pressure built to 700 psi with no fluid loss from the ball valve. It appears that there is no problem with either the packer or the tubing. | ||||
570320205 | 2011-08-04 | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||||
655000901 | 2011-11-02 | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||||
6679058 | 2002-02-28 | Well was not running. Unable to check previous tank battery contamination due to excess snow cover. Violation is pending. | ||||
674997017 | 2015-03-31 | The injection well and surface facility were inspected. There were no violations found at the time. | ||||
-678122122 | 2007-08-31 | On 8/24, attempted to complete the quarterly inspection for this brine disposal well. Instead I found the required two pen recorder was still missing, the needle valve on the annulus could not be opened or closed and there was a leak on the 8-5/8 casing valve. I called Dave Ballentine and requested that these issues be corrected by 8/31 so that the quarterly inspection could be completed. On 8/31, I found that none of the requested work was compelted. I called Dave Ballentine and told him that until this work was completed and the required inspection performed, the well was shut down and could not be used for brine disposal. | ||||
-72090206 | 2012-11-01 | My inspection of the injection facility and well found no violations. | ||||
-721191558 | 2006-05-02 | Status check inspection found a leak at the wellhead which caused a brine scald extending 50 feet from the well. The ID was missing from the brine storage area. I called Dave Ballentine and told him that the scald area needs to be reclaimed, the leak repaired and the ID replaced. | ||||
728432306 | 2004-08-12 | Salt water disposal well - status check inspection. Free oil and brine was found inside of the containment dike. Sloppy operations and a malfunctioning pump are to blame. The gravel inside of the dike area needs to be either cleaned or removed and replaced. | ||||
-738576898 | 2013-05-14 | My inspection of the well and surface facility found no violations. | ||||
744188355 | 2010-05-11 | Quarterly status check inspection found no violations at this time. | ||||
76505439 | 2008-06-04 | Injection pressures are now less than the maximum pressure of 890 psi. | ||||
-83384368 | 2004-06-28 | The grass seed has started to germinate and will probably recover. The loading pad still needs to be cleaned and the debris properly disposed. | ||||
-857218815 | 2003-05-07 | The spill remediation inside of the tank battery dike is continuing. Impacted vegetation still needs to be removed and impacted gravel from the southern half of the dike area needs to be either washed or removed. | ||||
877984231 | 2013-01-08 | I performed a mechanical integrity test on the well. 1020 psi. was place on the tubing/casing annulus and monitored for fifteen minutes. There was no pressure loss observed. | ||||
-929208054 | 2014-01-31 | No violations were found at the time of inspection. | ||||
-955456334 | 2009-07-14 | Dave Ballentine with B&B Oilfield Service reported that the casing and tubing had equalized indicating a packer failure. I ordered B&B to cease operations and schedule a service rig to unseat and pull the packer. I notified Tom Tomastik of the problems. | ||||
99379283 | 2006-08-30 | Quarterly status check inspection. I spoke with Dave Ballentine about setting a two pen recorder on the injection and annular side of this well. As noted during the previous MIT, it appears that there has been a failure of the 4-1/2 casing. The two pen chart can track annular vs injection pressures and identify any packer failure. No violations at this time. | ||||
iGMM0000122 | 2000-05-26 | |||||
PL6339 | Preliminary Restoration done information from Data Point | |||||
UIC1728 | 1997-04-10 | 1509.22 & 1501:9-3-07 (H) ANNULUS VALVE LEAK | ||||
UIC1794 | 1999-08-05 | 1509.03, 1501:9-3-07 (H) VALVE LEAKING |
For data sources see[1]