X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-031-27177"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-031-27177
 
| Well ID: 34-031-27177
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.3009009321, -81.8480344416 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.30090093, -81.84803444 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Coshocton County, Ohio|Coshocton]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BUCKEYE BRINE LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2011-12-21
 
| Spud Date: 2011-12-21
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Active Injection
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.3009009321
+
| Latitude: 40.30090093
 
|-
 
|-
| Longitude: -81.8480344416
+
| Longitude: -81.84803444
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1048462073
 
| -1048462073
 
| 2013-09-30
 
| 2013-09-30
|
+
|  
 
| On site to witness Producers Service Corp perform 2000 gallon acid treatment on well they pumped a total of 2650 gallon of fluid down well at  a average rate of 4.9 bpm with a average pressure of 950 psi and once treatment was done well was put back into injection status.
 
| On site to witness Producers Service Corp perform 2000 gallon acid treatment on well they pumped a total of 2650 gallon of fluid down well at  a average rate of 4.9 bpm with a average pressure of 950 psi and once treatment was done well was put back into injection status.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -1296412221
 
| 2014-02-24
 
|
 
| Inspection revealed that injection pump was in operation today and there was several vacuum trucks waiting to unload brine during my inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| -1340566057
 
| 2013-06-06
 
|
 
| Facility appears to be in satisfactory condition this inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| -1527950206
 
| 2012-06-08
 
|
 
| Pad for tanks under construction and dirt work continues and facility should be up and running by late summer.
 
Me with Rex Baker and discussed well site and construction plan will check in on site in a few days.
 
|
 
|
 
|
 
|-
 
|-
 
| -1556618432
 
| 2013-01-29
 
|
 
| Inspection revealed that Bakerwell Service personnel was on site to try and retrieve packer from wellbore ,they attached down hole tools to packer and used hydraulic means to try and break packer free they were able too do so after several attempts and they started tools out of hole and after pulling 36 joints of tubing packer became stuck again we then backed off fishing tool and came out of hole for the night.
 
|
 
|
 
|
 
|-
 
|-
 
| -1557012218
 
| 2014-07-28
 
|
 
| Inspection revealed that injection pump was in operation today and it was noted that owner is preparing to paint all storage tanks and make some small upgrades to the facility.
 
|
 
|
 
|
 
|-
 
|-
 
| -1658262295
 
| 2012-04-16
 
|
 
| Inspection revealed that facility is waiting on construction of unloading pad and dike area to be constructed and well placed into operation.
 
|
 
|
 
|
 
|-
 
|-
 
| -1745131126
 
| 2013-01-25
 
|
 
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to release the packer by means of using an overshot and jars. Bakerwell pulled all of the 4.5" casing from the well and began equipping the well head with a blow out preventer.
 
|
 
|
 
|
 
|-
 
|-
 
| -2073247765
 
| 2013-06-25
 
|
 
| Injection pump was in operation during my inspection and it was noted that five Infinity Water Trucks were waiting to unload at site during my inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| -2121173556
 
| 2013-05-22
 
|
 
| Visited site along with Chief Serinko of division of geo surveys and toured site and answered questions that Mr. Serinko asked about injection well facility and equipment involved with disposal operations.
 
|
 
|
 
|
 
|-
 
|-
 
| -2121595727
 
| 2013-07-08
 
|
 
| Jordan Services on site cleaning out storage tanks and placing material in roll off containers owned by Waste Management and once  profile is returned from landfill they will haul material to landfill.
 
|
 
|
 
|
 
|-
 
|-
 
| -233621810
 
| 2014-04-01
 
|
 
| On site to witness Producers Services perform 2000 gallon acid job on said well.
 
|
 
|
 
|
 
|-
 
|-
 
| -273798879
 
| 2014-07-11
 
|
 
| Inspected site along with staff members from central office and it was determined that injection pump was not in operation today.
 
|
 
|
 
|
 
|-
 
|-
 
| -348435507
 
| 2013-09-11
 
|
 
| Inspection revealed that injection pump was in operation today during our tour of facility Deputy Chief  Worstall and T.  Tomastik and group from Denver and Atlanta Ga. were inspecting site  to give visitors a better idea of how brine disposal is handled in Ohio.
 
|
 
|
 
|
 
|-
 
|-
 
| -423651118
 
| 2013-04-12
 
|
 
| Inspection revealed that injection pump was not in operation today.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -584955552
 
| 2012-12-24
 
|
 
| Inspection revealed that injection pump was in operation during my inspection and it was noted that Bakerwell Services has there service rig on site to prepare to work on said well, they plan on releasing packer and removing it from well and then run noise log and temp log to try and determine if they have casing issues or tubing and packer issues.
 
Note: 151,989 bbl of brine has went down well since it went into operation.
 
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 108398258
| -596554483
+
| 2015-04-07
| 2012-11-26
+
|  
|
+
| Well not in operation at this time.
| On site with Central Office staff to inspect well site and tour facility.
+
|  
|
+
|  
|
+
|  
|
 
|-
 
|-
 
| -623280504
 
| 2012-11-08
 
|
 
| On site with Central Office group to inspect UIC facility and while on site ODNR film crew interviewed personnel inquiring about salt water disposal facilities throughout the state.
 
|
 
|
 
|
 
|-
 
|-
 
| -718367942
 
| 2013-05-10
 
|
 
| No violations noted, injection pump was not in operation during my inspection and in conversation with operator stating that they have not been very busy this week.
 
|
 
|
 
|
 
|-
 
|-
 
| -726002399
 
| 2014-02-20
 
|
 
| On site to witness 2000 gal acid job on said well,Producers Services pumped acid and once acid was pumped the injection pressure on well declined by 250 #.
 
|
 
|
 
|
 
|-
 
|-
 
| -993837409
 
| 2013-10-17
 
|
 
| Injection pump in operation and there were several registered brine haulers unloading at facility during my inspection.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1162095830
 
| 1162095830
 
| 2011-11-07
 
| 2011-11-07
|
+
|  
 
| Well access road being built for drilling site. Bakerwell doing work.
 
| Well access road being built for drilling site. Bakerwell doing work.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1265639482
 +
| 2015-06-09
 +
|
 +
| Inspection revealed that injection pump to this well was shut down at the time of my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1290375039
 
| 1290375039
 
| 2013-01-30
 
| 2013-01-30
|
+
|  
 
| Pulled down hole sphere today and started back into well with milling tools.
 
| Pulled down hole sphere today and started back into well with milling tools.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1290680548
 
| 1290680548
 
| 2013-12-31
 
| 2013-12-31
|
+
|  
 
| On site to witness Producers Services perform 2000 gal acid treatment on said well.
 
| On site to witness Producers Services perform 2000 gal acid treatment on said well.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1296412221
 +
| 2014-02-24
 +
|
 +
| Inspection revealed that injection pump was in operation today and there was several vacuum trucks waiting to unload brine during my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1298413898
 
| 1298413898
 
| 2012-11-26
 
| 2012-11-26
|
+
|  
 
| Restoration work at site satisfactory, pits have been closed and site restored and vegetation has been established.
 
| Restoration work at site satisfactory, pits have been closed and site restored and vegetation has been established.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1312489309
 
| 1312489309
 
| 2014-06-25
 
| 2014-06-25
|
+
|  
 
| Injection pump not in operation today.
 
| Injection pump not in operation today.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1324311413
 
| 1324311413
 
| 2011-12-19
 
| 2011-12-19
|
+
|  
 
| Bakerwell ( Sonny ). building location with dozer and back hoe. Ohio Valley rig to move in tomorrow the 20th. Lease road is stoned and location is to be rocked with limestone.
 
| Bakerwell ( Sonny ). building location with dozer and back hoe. Ohio Valley rig to move in tomorrow the 20th. Lease road is stoned and location is to be rocked with limestone.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1324311413
 
| 1324311413
 
| 2011-12-19
 
| 2011-12-19
|
+
|  
 
| Bakerwell ( Sonny ). building location with dozer and back hoe. Wildcat drilling rig to move in tomorrow the 20th. Lease road is stoned and location is to be rocked with limestone.
 
| Bakerwell ( Sonny ). building location with dozer and back hoe. Wildcat drilling rig to move in tomorrow the 20th. Lease road is stoned and location is to be rocked with limestone.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1324482181
 
| 1324482181
 
| 2011-12-21
 
| 2011-12-21
|
+
|  
 
| Ohio Valley drilling moved in to start drilling a new salt water injection well. Digging pit this inspection.
 
| Ohio Valley drilling moved in to start drilling a new salt water injection well. Digging pit this inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1324482181
 
| 1324482181
 
| 2011-12-21
 
| 2011-12-21
|
+
|  
 
| Wildcat drilling moved in to start drilling a new salt water injection well. Digging pit this inspection.
 
| Wildcat drilling moved in to start drilling a new salt water injection well. Digging pit this inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1324539160
 
| 1324539160
 
| 2011-12-22
 
| 2011-12-22
|
+
|  
| Ran 125' of 16" casing and cemented to surface.
+
| Ran 125' of 16 casing and cemented to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1324539160
 
| 1324539160
 
| 2011-12-22
 
| 2011-12-22
|
+
|  
| Ran 125' of 16" casing and cemented to surface.
+
| Ran 125' of 16 casing and cemented to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1324648326
 
| 1324648326
 
| 2011-12-23
 
| 2011-12-23
|
+
|  
| Ran 11 3/4" casing and cemented for surface casing.
+
| Ran 11 3/4 casing and cemented for surface casing.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1324648326
 
| 1324648326
 
| 2011-12-23
 
| 2011-12-23
|
+
|  
| Ran 11 3/4" casing and cemented for surface casing.
+
| Ran 11 3/4 casing and cemented for surface casing.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1325087033
 
| 1325087033
 
| 2011-12-28
 
| 2011-12-28
|
+
|  
| Wildcat drilling rig shut down for holidays. 113/4" casing has swedge and valve.
+
| Wildcat drilling rig shut down for holidays. 113/4 casing has swedge and valve.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1325627827
 
| 1325627827
 
| 2012-01-03
 
| 2012-01-03
|
+
|  
 
+
| Test BOP (blow out preventer). First, second and third test didn
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1326148103
 
| 1326148103
 
| 2012-01-09
 
| 2012-01-09
|
+
|  
| Ran 5800' of 7 5/8" casing and cemented to surface. Waited on cementers from 11:30 pm to 6:00 am 1/10/12. Done cementing at 11:30 am.
+
| Ran 5800' of 7 5/8 casing and cemented to surface. Waited on cementers from 11:30 pm to 6:00 am 1/10/12. Done cementing at 11:30 am.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1326822771
 
| 1326822771
 
| 2012-01-17
 
| 2012-01-17
|
+
|  
 
| Tripping out of hole well total depth 7272' in Mt Simon formation.
 
| Tripping out of hole well total depth 7272' in Mt Simon formation.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1328121458
 
| 1328121458
 
| 2012-02-01
 
| 2012-02-01
|
+
|  
 
| Ran tubing to total depth and pumped 2500 gal of acid and completed a rate test for barrels per minute.
 
| Ran tubing to total depth and pumped 2500 gal of acid and completed a rate test for barrels per minute.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1328547213
 
| 1328547213
 
| 2012-02-06
 
| 2012-02-06
|
+
|  
 
| Vacuum trucks hauling pit water to close pits.
 
| Vacuum trucks hauling pit water to close pits.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1340566057
 +
| 2013-06-06
 +
|
 +
| Facility appears to be in satisfactory condition this inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1341678445
 
| 1341678445
 
| 2012-07-06
 
| 2012-07-06
|
+
|  
| On site to witness pressure testing of temporary injection line, said line consist of 11.6# 4.5" casing and company personnel pressured up to 1500# and we monitored pressure for 15 minutes with no decline in pressure.
+
| On site to witness pressure testing of temporary injection line, said line consist of 11.6# 4.5 casing and company personnel pressured up to 1500# and we monitored pressure for 15 minutes with no decline in pressure.
 
Note: Prior to getting line up to pressure they had to tighten  all connections they had five leaks prior to getting well tested, company rep stated that injection pump sales rep would be on site in the near future to test pump prior too placing it into operation.
 
Note: Prior to getting line up to pressure they had to tighten  all connections they had five leaks prior to getting well tested, company rep stated that injection pump sales rep would be on site in the near future to test pump prior too placing it into operation.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1350775643
 
| 1350775643
 
| 2012-10-18
 
| 2012-10-18
|
+
|  
 
| Inspection revealed that injection pump was not in operation during my inspection and we pressure tested flowline to well head@1510 psi and we monitored pressure for 15 min. with no decline in pressure(Test Passed) and there was a Infinity Vacuum truckUIC#486 on unloading pad it took 13 minutes to unload truck into holding tanks.
 
| Inspection revealed that injection pump was not in operation during my inspection and we pressure tested flowline to well head@1510 psi and we monitored pressure for 15 min. with no decline in pressure(Test Passed) and there was a Infinity Vacuum truckUIC#486 on unloading pad it took 13 minutes to unload truck into holding tanks.
 
Note: Once all tanks are full they will start pump and check plumbing for possible leaks.
 
Note: Once all tanks are full they will start pump and check plumbing for possible leaks.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1358984966
 
| 1358984966
 
| 2013-01-23
 
| 2013-01-23
|
+
|  
 
| On site to witness service rig try and release packer they tried several different ways to release packer with no luck, decision was made to part tubing just above packer and then attempt to fish packer from well using tubing and washover assembly.
 
| On site to witness service rig try and release packer they tried several different ways to release packer with no luck, decision was made to part tubing just above packer and then attempt to fish packer from well using tubing and washover assembly.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1359129335
 
| 1359129335
 
| 2013-01-24
 
| 2013-01-24
|
+
|  
 
| Inspection revealed that Bakerwell Services has service rig on site to try and determine if they have tubing leak or packer leak, after several attempts to release packer failed decision was made to cut injection string off just above packer and then go in well and fish for packer.
 
| Inspection revealed that Bakerwell Services has service rig on site to try and determine if they have tubing leak or packer leak, after several attempts to release packer failed decision was made to cut injection string off just above packer and then go in well and fish for packer.
 
Note: Blue Dot  services on site with various tools to run into well to retrieve packer.
 
Note: Blue Dot  services on site with various tools to run into well to retrieve packer.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1359139742
 
| 1359139742
 
| 2013-01-23
 
| 2013-01-23
|
+
|  
 
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to mechanically release the packer. It was reported that annular pressure was detected, requiring that the casing and packer be removed and tested.
 
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to mechanically release the packer. It was reported that annular pressure was detected, requiring that the casing and packer be removed and tested.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1359202377
 
| 1359202377
 
| 2013-01-25
 
| 2013-01-25
|
+
|  
| Inspection revealed that service rig has removed 4.5" injection string from well they will nipple up BOP and then run 2.375" tubing with fishing tool on bottom and then proceed to go in well to try and retrieve packer from well.
+
| Inspection revealed that service rig has removed 4.5 injection string from well they will nipple up BOP and then run 2.375 tubing with fishing tool on bottom and then proceed to go in well to try and retrieve packer from well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1359503003
 
| 1359503003
 
| 2013-01-28
 
| 2013-01-28
|
+
|  
 
| Inspection revealed that service rig had to mix kill water before starting out of hole, pulled tubing and Blue-Dot tools from well and we did not retrieve packer at this point, decision was made to go in hole with down hole sphere and a set of hydraulic jars and try and retrieve lost packer.
 
| Inspection revealed that service rig had to mix kill water before starting out of hole, pulled tubing and Blue-Dot tools from well and we did not retrieve packer at this point, decision was made to go in hole with down hole sphere and a set of hydraulic jars and try and retrieve lost packer.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1359562197
 
| 1359562197
 
| 2013-01-29
 
| 2013-01-29
|
+
|  
 
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to release the packer with a spear and hydraulic jars.
 
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to release the packer with a spear and hydraulic jars.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1359644793
 
| 1359644793
 
| 2013-01-30
 
| 2013-01-30
|
+
|  
| On  the day of my inspection Bakerwell released the spear and tripped the jars out of the hole. They went back in with a 5" mill in an attempt to clear any obstructions that my be preventing the packer from coming up the hole.
+
| On  the day of my inspection Bakerwell released the spear and tripped the jars out of the hole. They went back in with a 5 mill in an attempt to clear any obstructions that my be preventing the packer from coming up the hole.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1359751862
 
| 1359751862
 
| 2013-02-01
 
| 2013-02-01
|
+
|  
 
| Inspection revealed that service rig has packer moving up hole but it is still dragging a little it will be a slow process before they get packer out of hole, once out of hole they plan on running a casing scrapper in the well to make sure there is no burrs on inside of casing and then we will start new packer in well .
 
| Inspection revealed that service rig has packer moving up hole but it is still dragging a little it will be a slow process before they get packer out of hole, once out of hole they plan on running a casing scrapper in the well to make sure there is no burrs on inside of casing and then we will start new packer in well .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1360110387
 
| 1360110387
 
| 2013-02-04
 
| 2013-02-04
|
+
|  
| On site to pressure test the integrity of the 7" casing, rig crew ran a mechanical bridge plug too 5872' and  they then filled casing with fluid and they closed the Blow Out Preventer and then they applied 1450 psi of pressure and we monitored pressure for 30 minutes with no pressure loss, then decision was made to pull bridge plug and then shut well in for the evening they will resume working on changing out well head in the morning before running down hole magnet in well to try and retrieve lost packer slip assembly.
+
| On site to pressure test the integrity of the 7 casing, rig crew ran a mechanical bridge plug too 5872' and  they then filled casing with fluid and they closed the Blow Out Preventer and then they applied 1450 psi of pressure and we monitored pressure for 30 minutes with no pressure loss, then decision was made to pull bridge plug and then shut well in for the evening they will resume working on changing out well head in the morning before running down hole magnet in well to try and retrieve lost packer slip assembly.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1360155167
 
| 1360155167
 
| 2013-02-05
 
| 2013-02-05
|
+
|  
 
| On site to witness Arrow Set Lock packer in hole, before running packer decision was made to run magnet in well to retrieve broken packer parts we got small amount of metal we made three runs with magnet and then ran bare tools in well to check total depth@7241' and then they proceeded to change out well head on well head was in place it was determined that packer would not go through it then they had to call in well head personnel to grind out obstruction then we started packer in hole.
 
| On site to witness Arrow Set Lock packer in hole, before running packer decision was made to run magnet in well to retrieve broken packer parts we got small amount of metal we made three runs with magnet and then ran bare tools in well to check total depth@7241' and then they proceeded to change out well head on well head was in place it was determined that packer would not go through it then they had to call in well head personnel to grind out obstruction then we started packer in hole.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1360249979
 
| 1360249979
 
| 2013-02-06
 
| 2013-02-06
|
+
|  
| On site to witness 4.5" injection string &packer run in hole and then pressure test annulus of tubing,packer was set under 20K tension and well head used as a mandrel type and a sphere will need to be used if packer is to be released at a later date.Universal Well Services preformed pressure testing and pumping of 117 bbl of fresh water with inhibitor on backside of 4.5" casing and once testing was complete they had to have welder replumb flowline to well head and then we retested flowline @1500 psi and no leaks were detected at this time.
+
| On site to witness 4.5 injection string &packer run in hole and then pressure test annulus of tubing,packer was set under 20K tension and well head used as a mandrel type and a sphere will need to be used if packer is to be released at a later date.Universal Well Services preformed pressure testing and pumping of 117 bbl of fresh water with inhibitor on backside of 4.5 casing and once testing was complete they had to have welder replumb flowline to well head and then we retested flowline @1500 psi and no leaks were detected at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1360347682
 
| 1360347682
 
| 2013-02-06
 
| 2013-02-06
|
+
|  
 
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell setting the packer. Universal Well Services conducted the mechanical integrity test. The test passed and Bakerwell was authorized to resume operations.
 
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell setting the packer. Universal Well Services conducted the mechanical integrity test. The test passed and Bakerwell was authorized to resume operations.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1361645095
 
| 1361645095
 
| 2013-02-22
 
| 2013-02-22
|
+
|  
 
| Inspection revealed that according to well attendant there was very little water being received at facility at this time.
 
| Inspection revealed that according to well attendant there was very little water being received at facility at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1364941713
 +
| 2014-08-15
 +
|
 +
| I am accompanied by Inspector David Ball and Regional Supervisor Rocky King.  The injection pump is in use.  The pressure at the well is 570 psi.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1365027320
 
| 1365027320
 
| 2013-04-02
 
| 2013-04-02
|
+
|  
 
| Inspection revealed that injection pump was not in operation today and according to well care taker things have been slow going for the last couple weeks.
 
| Inspection revealed that injection pump was not in operation today and according to well care taker things have been slow going for the last couple weeks.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1367102731
 
| 1367102731
 
| 2013-04-26
 
| 2013-04-26
|
+
|  
 
| Inspection revealed that injection pump was not in operation today and company owner was on site to discuss cleaning of dirty fluids and proper handling of solids.
 
| Inspection revealed that injection pump was not in operation today and company owner was on site to discuss cleaning of dirty fluids and proper handling of solids.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1382744861
 
| 1382744861
 
| 2013-10-25
 
| 2013-10-25
|
+
|  
 
| On site to witness Producers Service Corp perform acid treatment on well they pumped 2000 gallon of 15% acid at a rate of 5 bbl per minute and once acid was pumped away they hooked well back up to injection pump and resumed normal operations.
 
| On site to witness Producers Service Corp perform acid treatment on well they pumped 2000 gallon of 15% acid at a rate of 5 bbl per minute and once acid was pumped away they hooked well back up to injection pump and resumed normal operations.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1387495266
 
| 1387495266
 
| 2013-12-19
 
| 2013-12-19
|
+
|  
 
| Inspection revealed that injection pump was in operation and it was noted that there was three Stallion vacuum trucks unloading at facility during my inspection.
 
| Inspection revealed that injection pump was in operation and it was noted that there was three Stallion vacuum trucks unloading at facility during my inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1391295916
 
| 1391295916
 
| 2014-01-31
 
| 2014-01-31
|
+
|  
 
| On site to witness acid job performed on well, Producers Services pumped 2000 gal of 15% acid and once acid was inside of tubing site injection pump took over and displaced it into formation and then they resumed injection operations.
 
| On site to witness acid job performed on well, Producers Services pumped 2000 gal of 15% acid and once acid was inside of tubing site injection pump took over and displaced it into formation and then they resumed injection operations.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1397510544
 
| 1397510544
 
| 2014-04-14
 
| 2014-04-14
|
+
|  
 
| Inspection revealed that injection pump was in operation today and it was noted that several vacuum trucks were unloading at facility during my inspection.
 
| Inspection revealed that injection pump was in operation today and it was noted that several vacuum trucks were unloading at facility during my inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1398799941
 
| 1398799941
 
| 2014-04-29
 
| 2014-04-29
|
+
|  
 
| Inspection revealed that injection pump was in operation during my inspection and it was noted that three Oilfield Services vacuum trucks were unloading at facility during my inspection.
 
| Inspection revealed that injection pump was in operation during my inspection and it was noted that three Oilfield Services vacuum trucks were unloading at facility during my inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1399592699
 
| 1399592699
 
| 2014-05-07
 
| 2014-05-07
|
+
|  
 
| On site along with Producers Services to perform 2000 gallon acid treatment on said well.
 
| On site along with Producers Services to perform 2000 gallon acid treatment on said well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1400972090
 
| 1400972090
 
| 2014-05-22
 
| 2014-05-22
|
+
|  
 
| Injection pump not running during my inspection.
 
| Injection pump not running during my inspection.
 
Note: On site with Central Office staff to confirm UIC numbers on brine hauling trucks.
 
Note: On site with Central Office staff to confirm UIC numbers on brine hauling trucks.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1409173174
 
| 1409173174
 
| 2014-08-26
 
| 2014-08-26
|
+
|  
 
| Producers Well Service on site to perform 2000 gallon acid treatment job on said well.
 
| Producers Well Service on site to perform 2000 gallon acid treatment job on said well.
 
Pressure charts forwarded to central office.
 
Pressure charts forwarded to central office.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1410738267
 +
| 2014-09-11
 +
|
 +
| Inspection revealed that injection pump too this well was in operation during my site inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1418073343
 +
| 2014-12-08
 +
|
 +
| Inspection revealed that Producers Services was on site to perform acid treatment on said well, they pumped a total of 2000 gallon 500 gal 28% 1000 gal of HF and then 500 gal of 28% and displaced it with 100 bbl. of brine and once brine was in wellbore we shut well down for 1 hour before resuming injection operations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1426191920
 +
| 2015-03-12
 +
|
 +
| Well is not in operation at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1430094752
 
| 1430094752
 
| 2013-12-12
 
| 2013-12-12
|
+
|  
 
| Inspection revealed that contractor is preparing site for containment expansion and they plan on adding two 2500 bbl tanks and plumb them into existing storage capacity.
 
| Inspection revealed that contractor is preparing site for containment expansion and they plan on adding two 2500 bbl tanks and plumb them into existing storage capacity.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1433165214
 +
| 2015-03-11
 +
|
 +
| Field Audit: 20 Brine Trucks on site. (3) Elite GasField Services (UIC # 25-516), (2)ECM Trucks (UIC # 25-548), (3) Infinity Trucks (UIC #25-442) (1) Buckeye Water Service (UIC #25-019), (3) Stallion Oilfield Construction Trucks (UIC #25-368), (3) Oilfield Trucking Solutions (UIC #25-485), (3) Haas Environmental Trucks (UIC #25-512), (1) Mountain Energy Truck (UIC #25-514), and (1) Curry Supply Truck (UIC # 25-412).  All Trucks were labeled correctly with UIC # and the word Brine, and approved to haul to the Adams wells.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1470113746
 
| 1470113746
 
| 2014-06-11
 
| 2014-06-11
|
+
|  
 
| Inspection revealed that injection pump too this well was not in operation during my inspection.
 
| Inspection revealed that injection pump too this well was not in operation during my inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1473031659
 
| 1473031659
 
| 2013-11-21
 
| 2013-11-21
|
+
|  
 
| On site to witness 2000 gal acid job performed on well Producers Services pumped 15% acid down tubing and then site injection pump displaced fluid into injection formation.
 
| On site to witness 2000 gal acid job performed on well Producers Services pumped 15% acid down tubing and then site injection pump displaced fluid into injection formation.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1527950206
 +
| 2012-06-08
 +
|
 +
| Pad for tanks under construction and dirt work continues and facility should be up and running by late summer.
 +
Me with Rex Baker and discussed well site and construction plan will check in on site in a few days.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1556618432
 +
| 2013-01-29
 +
|
 +
| Inspection revealed that Bakerwell Service personnel was on site to try and retrieve packer from wellbore ,they attached down hole tools to packer and used hydraulic means to try and break packer free they were able too do so after several attempts and they started tools out of hole and after pulling 36 joints of tubing packer became stuck again we then backed off fishing tool and came out of hole for the night.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1557012218
 +
| 2014-07-28
 +
|
 +
| Inspection revealed that injection pump was in operation today and it was noted that owner is preparing to paint all storage tanks and make some small upgrades to the facility.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -158381751
 +
| 2014-10-17
 +
|
 +
| Injection pump too this well was not in operation during my inspection.
 +
Note: All storage tanks at this facility are being repainted at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1592839315
 
| 1592839315
 
| 2013-07-31
 
| 2013-07-31
|
+
|  
 
| Inspection revealed that injection pump was in operation during my inspection and it was noted that second injection pump was being installed at facility and owner states that they plan on drilling there second disposal well at site by 9/1/13.
 
| Inspection revealed that injection pump was in operation during my inspection and it was noted that second injection pump was being installed at facility and owner states that they plan on drilling there second disposal well at site by 9/1/13.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1608602348
 +
| 2015-01-15
 +
|
 +
| Pump was shut down prior to my inspection due to fact they were preparing to start up well# 3.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1650662507
 +
| 2015-02-25
 +
|
 +
| Inspection revealed that well is not in operation at this time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1658262295
 +
| 2012-04-16
 +
|
 +
| Inspection revealed that facility is waiting on construction of unloading pad and dike area to be constructed and well placed into operation.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1745131126
 +
| 2013-01-25
 +
|
 +
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to release the packer by means of using an overshot and jars. Bakerwell pulled all of the 4.5 casing from the well and began equipping the well head with a blow out preventer.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1801330405
 
| 1801330405
 
| 2013-10-21
 
| 2013-10-21
|
+
|  
 
| Inspection revealed that injection pump was in operation today and it was noted that there were several vacuum trucks at facility waiting to unload.
 
| Inspection revealed that injection pump was in operation today and it was noted that there were several vacuum trucks at facility waiting to unload.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 195048616
 
| 195048616
 
| 2013-03-20
 
| 2013-03-20
|
+
|  
 
| Inspection revealed that injection pump was not in operation today and according to well tender things have been slow lately.
 
| Inspection revealed that injection pump was not in operation today and according to well tender things have been slow lately.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1954513694
 +
| 2015-03-05
 +
|
 +
| Inspection revealed that this well is shut in at present time and owner will shut down the number three well later this week and resume injection operation on the number one well for a short period of time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 197635731
 
| 197635731
 
| 2012-11-08
 
| 2012-11-08
|
+
|  
 
| On day of inspection the tour of the Columbus staff was purpose of being on site. Group and Rex Baker and Steve Mobley were at facility.
 
| On day of inspection the tour of the Columbus staff was purpose of being on site. Group and Rex Baker and Steve Mobley were at facility.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1980799740
 
| 1980799740
 
| 2013-01-24
 
| 2013-01-24
|
+
|  
 
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to release the packer by means of detonating primer cord inside. This method was unsuccessful. The decision was then made to shoot the casing off above the packer.
 
| On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to release the packer by means of detonating primer cord inside. This method was unsuccessful. The decision was then made to shoot the casing off above the packer.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2073247765
 +
| 2013-06-25
 +
|
 +
| Injection pump was in operation during my inspection and it was noted that five Infinity Water Trucks were waiting to unload at site during my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 2076365143
 
| 2076365143
 
| 2013-12-13
 
| 2013-12-13
|
+
|  
 
| On site to witness contractor place 81 yards of concrete in area adjacent to current tank area, they have submitted expansion plan to the division.
 
| On site to witness contractor place 81 yards of concrete in area adjacent to current tank area, they have submitted expansion plan to the division.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2121173556
 +
| 2013-05-22
 +
|
 +
| Visited site along with Chief Serinko of division of geo surveys and toured site and answered questions that Mr. Serinko asked about injection well facility and equipment involved with disposal operations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -2121595727
 +
| 2013-07-08
 +
|
 +
| Jordan Services on site cleaning out storage tanks and placing material in roll off containers owned by Waste Management and once  profile is returned from landfill they will haul material to landfill.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 225741726
 
| 225741726
 
| 2013-09-16
 
| 2013-09-16
|
+
|  
 
| On site to witness Universal Well Services pump 2000 gallon 28% acid into well to treat injection zone.
 
| On site to witness Universal Well Services pump 2000 gallon 28% acid into well to treat injection zone.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -233621810
 +
| 2014-04-01
 +
|
 +
| On site to witness Producers Services perform 2000 gallon acid job on said well.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 236636590
 +
| 2015-03-27
 +
|
 +
| Inspection revealed that well is not in operation at this time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -273798879
 +
| 2014-07-11
 +
|
 +
| Inspected site along with staff members from central office and it was determined that injection pump was not in operation today.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 290514059
 
| 290514059
 
| 2013-07-15
 
| 2013-07-15
|
+
|  
 
| Inspection revealed that injection pump was not operating during my inspection and it was noted that eight roll off boxes were filled with material from tank cleaning process and Waste Management was on site hauling containers to landfill.
 
| Inspection revealed that injection pump was not operating during my inspection and it was noted that eight roll off boxes were filled with material from tank cleaning process and Waste Management was on site hauling containers to landfill.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 29256815
 +
| 2014-12-15
 +
|
 +
| PERFORMED FIELD AUDIT OF BRINE TRUCKS AND WITNESSED 2 HAAS TRUCKS (UIC #512), 3 ELITE TRUCKS (UIC #516), AND 6 OILFIELD TRUCKING (UIC #485) ALL LABELED PROPERLY AND APPROVED TO HAUL TO SITE. NO TRUCK VIOLATIONS FOUND.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 298102600
 
| 298102600
 
| 2014-03-27
 
| 2014-03-27
|
+
|  
 
| Inspection revealed that injection pumps were not in operation during my inspection.
 
| Inspection revealed that injection pumps were not in operation during my inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 338233549
 
| 338233549
 
| 2014-03-06
 
| 2014-03-06
|
+
|  
 
| Inspection revealed that injection pump was in operation during my inspection and it was noted that additional storage tanks are nearly complete.
 
| Inspection revealed that injection pump was in operation during my inspection and it was noted that additional storage tanks are nearly complete.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -348435507
 +
| 2013-09-11
 +
|
 +
| Inspection revealed that injection pump was in operation today during our tour of facility Deputy Chief  Worstall and T.  Tomastik and group from Denver and Atlanta Ga. were inspecting site  to give visitors a better idea of how brine disposal is handled in Ohio.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -423651118
 +
| 2013-04-12
 +
|
 +
| Inspection revealed that injection pump was not in operation today.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 450981201
 
| 450981201
 
| 2012-05-10
 
| 2012-05-10
|
+
|  
 
| Meeting with well owners and landowner to discuss construction of surface facilities.
 
| Meeting with well owners and landowner to discuss construction of surface facilities.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 520332877
 
| 520332877
 
| 2014-08-11
 
| 2014-08-11
|
+
|  
 
| Inspection revealed that injection pump too this well was not in service during my inspection.
 
| Inspection revealed that injection pump too this well was not in service during my inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 562118928
 
| 562118928
 
| 2012-08-23
 
| 2012-08-23
|
+
|  
 
| Inspection revealed that well is in operation and surface facility is still under construction and it was noted that storage tanks are nearly plumbed up and unloading pad is nearly complete.
 
| Inspection revealed that well is in operation and surface facility is still under construction and it was noted that storage tanks are nearly plumbed up and unloading pad is nearly complete.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -584955552
 +
| 2012-12-24
 +
|
 +
| Inspection revealed that injection pump was in operation during my inspection and it was noted that Bakerwell Services has there service rig on site to prepare to work on said well, they plan on releasing packer and removing it from well and then run noise log and temp log to try and determine if they have casing issues or tubing and packer issues.
 +
Note: 151,989 bbl of brine has went down well since it went into operation.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -588112798
 +
| 2015-01-02
 +
|
 +
| Inspection revealed that injection pump was in operation during my inspection and it was noted that several vacuum trucks were waiting to unload at the facility on this day.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -596554483
 +
| 2012-11-26
 +
|
 +
| On site with Central Office staff to inspect well site and tour facility.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 600045772
 
| 600045772
 
| 2013-11-25
 
| 2013-11-25
|
+
|  
 
| Pump not running today and it was noted that one Resource Well Service vacuum truck was unloading at site during my inspection.
 
| Pump not running today and it was noted that one Resource Well Service vacuum truck was unloading at site during my inspection.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -623280504
 +
| 2012-11-08
 +
|
 +
| On site with Central Office group to inspect UIC facility and while on site ODNR film crew interviewed personnel inquiring about salt water disposal facilities throughout the state.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -660469170
 +
| 2015-02-13
 +
|
 +
| Inspection revealed that injection pump was in operation today and it was noted that twenty vacuum trucks were waiting to unload at the facility during my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 683651567
 
| 683651567
 
| 2014-01-14
 
| 2014-01-14
|
+
|  
 
| Inspection revealed that injection pump was in operation during my inspection.
 
| Inspection revealed that injection pump was in operation during my inspection.
 
Note: Containment area for additional storage tanks has been completed and owner is waiting on tanks to be delivered.
 
Note: Containment area for additional storage tanks has been completed and owner is waiting on tanks to be delivered.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -718367942
 +
| 2013-05-10
 +
|
 +
| No violations noted, injection pump was not in operation during my inspection and in conversation with operator stating that they have not been very busy this week.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -726002399
 +
| 2014-02-20
 +
|
 +
| On site to witness 2000 gal acid job on said well,Producers Services pumped acid and once acid was pumped the injection pressure on well declined by 250 #.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -792448283
 +
| 2014-11-06
 +
|
 +
| Inspection revealed that injection pump too this well was not in operation during my inspection and it was noted that all storage tanks at the facility have been recently been repainted.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 803366850
 
| 803366850
 
| 2014-06-18
 
| 2014-06-18
|
+
|  
 
| Inspection revealed that injection pump was in operation today and it was noted that three IBEX vacuum trucks were unloading at facility during my inspection.
 
| Inspection revealed that injection pump was in operation today and it was noted that three IBEX vacuum trucks were unloading at facility during my inspection.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -812506906
 +
| 2014-11-25
 +
|
 +
| PERFORMED FIELD AUDIT FOR BRINE TRUCKS WITNESSED 2 MYERS TRUCKS (UIC #427) BOTH TRUCKS LABELED PROPERLY AND APPROVED TO HAUL TO THIS SITE. NO TRUCK VIOLATIONS FOUND.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -993837409
 +
| 2013-10-17
 +
|
 +
| Injection pump in operation and there were several registered brine haulers unloading at facility during my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:28, 15 July 2015

Well Details

Well ID: 34-031-27177
Loading map...
County: Coshocton
Municipality:
Operator Name: BUCKEYE BRINE LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-12-21
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 40.30090093
Longitude: -81.84803444

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1048462073 2013-09-30 On site to witness Producers Service Corp perform 2000 gallon acid treatment on well they pumped a total of 2650 gallon of fluid down well at a average rate of 4.9 bpm with a average pressure of 950 psi and once treatment was done well was put back into injection status.
108398258 2015-04-07 Well not in operation at this time.
1162095830 2011-11-07 Well access road being built for drilling site. Bakerwell doing work.
-1265639482 2015-06-09 Inspection revealed that injection pump to this well was shut down at the time of my inspection.
1290375039 2013-01-30 Pulled down hole sphere today and started back into well with milling tools.
1290680548 2013-12-31 On site to witness Producers Services perform 2000 gal acid treatment on said well.
-1296412221 2014-02-24 Inspection revealed that injection pump was in operation today and there was several vacuum trucks waiting to unload brine during my inspection.
1298413898 2012-11-26 Restoration work at site satisfactory, pits have been closed and site restored and vegetation has been established.
1312489309 2014-06-25 Injection pump not in operation today.
1324311413 2011-12-19 Bakerwell ( Sonny ). building location with dozer and back hoe. Ohio Valley rig to move in tomorrow the 20th. Lease road is stoned and location is to be rocked with limestone.
1324311413 2011-12-19 Bakerwell ( Sonny ). building location with dozer and back hoe. Wildcat drilling rig to move in tomorrow the 20th. Lease road is stoned and location is to be rocked with limestone.
1324482181 2011-12-21 Ohio Valley drilling moved in to start drilling a new salt water injection well. Digging pit this inspection.
1324482181 2011-12-21 Wildcat drilling moved in to start drilling a new salt water injection well. Digging pit this inspection.
1324539160 2011-12-22 Ran 125' of 16 casing and cemented to surface.
1324539160 2011-12-22 Ran 125' of 16 casing and cemented to surface.
1324648326 2011-12-23 Ran 11 3/4 casing and cemented for surface casing.
1324648326 2011-12-23 Ran 11 3/4 casing and cemented for surface casing.
1325087033 2011-12-28 Wildcat drilling rig shut down for holidays. 113/4 casing has swedge and valve.
1325627827 2012-01-03 Test BOP (blow out preventer). First, second and third test didn
1326148103 2012-01-09 Ran 5800' of 7 5/8 casing and cemented to surface. Waited on cementers from 11:30 pm to 6:00 am 1/10/12. Done cementing at 11:30 am.
1326822771 2012-01-17 Tripping out of hole well total depth 7272' in Mt Simon formation.
1328121458 2012-02-01 Ran tubing to total depth and pumped 2500 gal of acid and completed a rate test for barrels per minute.
1328547213 2012-02-06 Vacuum trucks hauling pit water to close pits.
-1340566057 2013-06-06 Facility appears to be in satisfactory condition this inspection.
1341678445 2012-07-06 On site to witness pressure testing of temporary injection line, said line consist of 11.6# 4.5 casing and company personnel pressured up to 1500# and we monitored pressure for 15 minutes with no decline in pressure.

Note: Prior to getting line up to pressure they had to tighten all connections they had five leaks prior to getting well tested, company rep stated that injection pump sales rep would be on site in the near future to test pump prior too placing it into operation.

1350775643 2012-10-18 Inspection revealed that injection pump was not in operation during my inspection and we pressure tested flowline to well head@1510 psi and we monitored pressure for 15 min. with no decline in pressure(Test Passed) and there was a Infinity Vacuum truckUIC#486 on unloading pad it took 13 minutes to unload truck into holding tanks.

Note: Once all tanks are full they will start pump and check plumbing for possible leaks.

1358984966 2013-01-23 On site to witness service rig try and release packer they tried several different ways to release packer with no luck, decision was made to part tubing just above packer and then attempt to fish packer from well using tubing and washover assembly.
1359129335 2013-01-24 Inspection revealed that Bakerwell Services has service rig on site to try and determine if they have tubing leak or packer leak, after several attempts to release packer failed decision was made to cut injection string off just above packer and then go in well and fish for packer.

Note: Blue Dot services on site with various tools to run into well to retrieve packer.

1359139742 2013-01-23 On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to mechanically release the packer. It was reported that annular pressure was detected, requiring that the casing and packer be removed and tested.
1359202377 2013-01-25 Inspection revealed that service rig has removed 4.5 injection string from well they will nipple up BOP and then run 2.375 tubing with fishing tool on bottom and then proceed to go in well to try and retrieve packer from well.
1359503003 2013-01-28 Inspection revealed that service rig had to mix kill water before starting out of hole, pulled tubing and Blue-Dot tools from well and we did not retrieve packer at this point, decision was made to go in hole with down hole sphere and a set of hydraulic jars and try and retrieve lost packer.
1359562197 2013-01-29 On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to release the packer with a spear and hydraulic jars.
1359644793 2013-01-30 On the day of my inspection Bakerwell released the spear and tripped the jars out of the hole. They went back in with a 5 mill in an attempt to clear any obstructions that my be preventing the packer from coming up the hole.
1359751862 2013-02-01 Inspection revealed that service rig has packer moving up hole but it is still dragging a little it will be a slow process before they get packer out of hole, once out of hole they plan on running a casing scrapper in the well to make sure there is no burrs on inside of casing and then we will start new packer in well .
1360110387 2013-02-04 On site to pressure test the integrity of the 7 casing, rig crew ran a mechanical bridge plug too 5872' and they then filled casing with fluid and they closed the Blow Out Preventer and then they applied 1450 psi of pressure and we monitored pressure for 30 minutes with no pressure loss, then decision was made to pull bridge plug and then shut well in for the evening they will resume working on changing out well head in the morning before running down hole magnet in well to try and retrieve lost packer slip assembly.
1360155167 2013-02-05 On site to witness Arrow Set Lock packer in hole, before running packer decision was made to run magnet in well to retrieve broken packer parts we got small amount of metal we made three runs with magnet and then ran bare tools in well to check total depth@7241' and then they proceeded to change out well head on well head was in place it was determined that packer would not go through it then they had to call in well head personnel to grind out obstruction then we started packer in hole.
1360249979 2013-02-06 On site to witness 4.5 injection string &packer run in hole and then pressure test annulus of tubing,packer was set under 20K tension and well head used as a mandrel type and a sphere will need to be used if packer is to be released at a later date.Universal Well Services preformed pressure testing and pumping of 117 bbl of fresh water with inhibitor on backside of 4.5 casing and once testing was complete they had to have welder replumb flowline to well head and then we retested flowline @1500 psi and no leaks were detected at this time.
1360347682 2013-02-06 On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell setting the packer. Universal Well Services conducted the mechanical integrity test. The test passed and Bakerwell was authorized to resume operations.
1361645095 2013-02-22 Inspection revealed that according to well attendant there was very little water being received at facility at this time.
-1364941713 2014-08-15 I am accompanied by Inspector David Ball and Regional Supervisor Rocky King. The injection pump is in use. The pressure at the well is 570 psi.
1365027320 2013-04-02 Inspection revealed that injection pump was not in operation today and according to well care taker things have been slow going for the last couple weeks.
1367102731 2013-04-26 Inspection revealed that injection pump was not in operation today and company owner was on site to discuss cleaning of dirty fluids and proper handling of solids.
1382744861 2013-10-25 On site to witness Producers Service Corp perform acid treatment on well they pumped 2000 gallon of 15% acid at a rate of 5 bbl per minute and once acid was pumped away they hooked well back up to injection pump and resumed normal operations.
1387495266 2013-12-19 Inspection revealed that injection pump was in operation and it was noted that there was three Stallion vacuum trucks unloading at facility during my inspection.
1391295916 2014-01-31 On site to witness acid job performed on well, Producers Services pumped 2000 gal of 15% acid and once acid was inside of tubing site injection pump took over and displaced it into formation and then they resumed injection operations.
1397510544 2014-04-14 Inspection revealed that injection pump was in operation today and it was noted that several vacuum trucks were unloading at facility during my inspection.
1398799941 2014-04-29 Inspection revealed that injection pump was in operation during my inspection and it was noted that three Oilfield Services vacuum trucks were unloading at facility during my inspection.
1399592699 2014-05-07 On site along with Producers Services to perform 2000 gallon acid treatment on said well.
1400972090 2014-05-22 Injection pump not running during my inspection.

Note: On site with Central Office staff to confirm UIC numbers on brine hauling trucks.

1409173174 2014-08-26 Producers Well Service on site to perform 2000 gallon acid treatment job on said well.

Pressure charts forwarded to central office.

1410738267 2014-09-11 Inspection revealed that injection pump too this well was in operation during my site inspection.
1418073343 2014-12-08 Inspection revealed that Producers Services was on site to perform acid treatment on said well, they pumped a total of 2000 gallon 500 gal 28% 1000 gal of HF and then 500 gal of 28% and displaced it with 100 bbl. of brine and once brine was in wellbore we shut well down for 1 hour before resuming injection operations.
1426191920 2015-03-12 Well is not in operation at this time.
1430094752 2013-12-12 Inspection revealed that contractor is preparing site for containment expansion and they plan on adding two 2500 bbl tanks and plumb them into existing storage capacity.
1433165214 2015-03-11 Field Audit: 20 Brine Trucks on site. (3) Elite GasField Services (UIC # 25-516), (2)ECM Trucks (UIC # 25-548), (3) Infinity Trucks (UIC #25-442) (1) Buckeye Water Service (UIC #25-019), (3) Stallion Oilfield Construction Trucks (UIC #25-368), (3) Oilfield Trucking Solutions (UIC #25-485), (3) Haas Environmental Trucks (UIC #25-512), (1) Mountain Energy Truck (UIC #25-514), and (1) Curry Supply Truck (UIC # 25-412). All Trucks were labeled correctly with UIC # and the word Brine, and approved to haul to the Adams wells.
1470113746 2014-06-11 Inspection revealed that injection pump too this well was not in operation during my inspection.
1473031659 2013-11-21 On site to witness 2000 gal acid job performed on well Producers Services pumped 15% acid down tubing and then site injection pump displaced fluid into injection formation.
-1527950206 2012-06-08 Pad for tanks under construction and dirt work continues and facility should be up and running by late summer.

Me with Rex Baker and discussed well site and construction plan will check in on site in a few days.

-1556618432 2013-01-29 Inspection revealed that Bakerwell Service personnel was on site to try and retrieve packer from wellbore ,they attached down hole tools to packer and used hydraulic means to try and break packer free they were able too do so after several attempts and they started tools out of hole and after pulling 36 joints of tubing packer became stuck again we then backed off fishing tool and came out of hole for the night.
-1557012218 2014-07-28 Inspection revealed that injection pump was in operation today and it was noted that owner is preparing to paint all storage tanks and make some small upgrades to the facility.
-158381751 2014-10-17 Injection pump too this well was not in operation during my inspection.

Note: All storage tanks at this facility are being repainted at this time.

1592839315 2013-07-31 Inspection revealed that injection pump was in operation during my inspection and it was noted that second injection pump was being installed at facility and owner states that they plan on drilling there second disposal well at site by 9/1/13.
1608602348 2015-01-15 Pump was shut down prior to my inspection due to fact they were preparing to start up well# 3.
1650662507 2015-02-25 Inspection revealed that well is not in operation at this time.
-1658262295 2012-04-16 Inspection revealed that facility is waiting on construction of unloading pad and dike area to be constructed and well placed into operation.
-1745131126 2013-01-25 On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to release the packer by means of using an overshot and jars. Bakerwell pulled all of the 4.5 casing from the well and began equipping the well head with a blow out preventer.
1801330405 2013-10-21 Inspection revealed that injection pump was in operation today and it was noted that there were several vacuum trucks at facility waiting to unload.
195048616 2013-03-20 Inspection revealed that injection pump was not in operation today and according to well tender things have been slow lately.
-1954513694 2015-03-05 Inspection revealed that this well is shut in at present time and owner will shut down the number three well later this week and resume injection operation on the number one well for a short period of time.
197635731 2012-11-08 On day of inspection the tour of the Columbus staff was purpose of being on site. Group and Rex Baker and Steve Mobley were at facility.
1980799740 2013-01-24 On the day of my inspection I met ODNR Inspector Dave Ball on location to witness Bakerwell attempting to release the packer by means of detonating primer cord inside. This method was unsuccessful. The decision was then made to shoot the casing off above the packer.
-2073247765 2013-06-25 Injection pump was in operation during my inspection and it was noted that five Infinity Water Trucks were waiting to unload at site during my inspection.
2076365143 2013-12-13 On site to witness contractor place 81 yards of concrete in area adjacent to current tank area, they have submitted expansion plan to the division.
-2121173556 2013-05-22 Visited site along with Chief Serinko of division of geo surveys and toured site and answered questions that Mr. Serinko asked about injection well facility and equipment involved with disposal operations.
-2121595727 2013-07-08 Jordan Services on site cleaning out storage tanks and placing material in roll off containers owned by Waste Management and once profile is returned from landfill they will haul material to landfill.
225741726 2013-09-16 On site to witness Universal Well Services pump 2000 gallon 28% acid into well to treat injection zone.
-233621810 2014-04-01 On site to witness Producers Services perform 2000 gallon acid job on said well.
236636590 2015-03-27 Inspection revealed that well is not in operation at this time.
-273798879 2014-07-11 Inspected site along with staff members from central office and it was determined that injection pump was not in operation today.
290514059 2013-07-15 Inspection revealed that injection pump was not operating during my inspection and it was noted that eight roll off boxes were filled with material from tank cleaning process and Waste Management was on site hauling containers to landfill.
29256815 2014-12-15 PERFORMED FIELD AUDIT OF BRINE TRUCKS AND WITNESSED 2 HAAS TRUCKS (UIC #512), 3 ELITE TRUCKS (UIC #516), AND 6 OILFIELD TRUCKING (UIC #485) ALL LABELED PROPERLY AND APPROVED TO HAUL TO SITE. NO TRUCK VIOLATIONS FOUND.
298102600 2014-03-27 Inspection revealed that injection pumps were not in operation during my inspection.
338233549 2014-03-06 Inspection revealed that injection pump was in operation during my inspection and it was noted that additional storage tanks are nearly complete.
-348435507 2013-09-11 Inspection revealed that injection pump was in operation today during our tour of facility Deputy Chief Worstall and T. Tomastik and group from Denver and Atlanta Ga. were inspecting site to give visitors a better idea of how brine disposal is handled in Ohio.
-423651118 2013-04-12 Inspection revealed that injection pump was not in operation today.
450981201 2012-05-10 Meeting with well owners and landowner to discuss construction of surface facilities.
520332877 2014-08-11 Inspection revealed that injection pump too this well was not in service during my inspection.
562118928 2012-08-23 Inspection revealed that well is in operation and surface facility is still under construction and it was noted that storage tanks are nearly plumbed up and unloading pad is nearly complete.
-584955552 2012-12-24 Inspection revealed that injection pump was in operation during my inspection and it was noted that Bakerwell Services has there service rig on site to prepare to work on said well, they plan on releasing packer and removing it from well and then run noise log and temp log to try and determine if they have casing issues or tubing and packer issues.

Note: 151,989 bbl of brine has went down well since it went into operation.

-588112798 2015-01-02 Inspection revealed that injection pump was in operation during my inspection and it was noted that several vacuum trucks were waiting to unload at the facility on this day.
-596554483 2012-11-26 On site with Central Office staff to inspect well site and tour facility.
600045772 2013-11-25 Pump not running today and it was noted that one Resource Well Service vacuum truck was unloading at site during my inspection.
-623280504 2012-11-08 On site with Central Office group to inspect UIC facility and while on site ODNR film crew interviewed personnel inquiring about salt water disposal facilities throughout the state.
-660469170 2015-02-13 Inspection revealed that injection pump was in operation today and it was noted that twenty vacuum trucks were waiting to unload at the facility during my inspection.
683651567 2014-01-14 Inspection revealed that injection pump was in operation during my inspection.

Note: Containment area for additional storage tanks has been completed and owner is waiting on tanks to be delivered.

-718367942 2013-05-10 No violations noted, injection pump was not in operation during my inspection and in conversation with operator stating that they have not been very busy this week.
-726002399 2014-02-20 On site to witness 2000 gal acid job on said well,Producers Services pumped acid and once acid was pumped the injection pressure on well declined by 250 #.
-792448283 2014-11-06 Inspection revealed that injection pump too this well was not in operation during my inspection and it was noted that all storage tanks at the facility have been recently been repainted.
803366850 2014-06-18 Inspection revealed that injection pump was in operation today and it was noted that three IBEX vacuum trucks were unloading at facility during my inspection.
-812506906 2014-11-25 PERFORMED FIELD AUDIT FOR BRINE TRUCKS WITNESSED 2 MYERS TRUCKS (UIC #427) BOTH TRUCKS LABELED PROPERLY AND APPROVED TO HAUL TO THIS SITE. NO TRUCK VIOLATIONS FOUND.
-993837409 2013-10-17 Injection pump in operation and there were several registered brine haulers unloading at facility during my inspection.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.