If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-121-24349 | | Well ID: 34-121-24349 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.66469637, -81.53746864 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Noble County, Ohio|Noble]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[ANADARKO E & P ONSHORE LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
− | | Spud Date: 2012- | + | | Spud Date: 2012-06-12 |
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.66469637 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.53746864 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 2970.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-12 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-3 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-6 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-9 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-3 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 130: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -105367093 | | -105367093 | ||
| 2012-05-30 | | 2012-05-30 | ||
− | | | + | | |
| Stopped by drill rig for up date they were tripping bit@10,277' they hope to have vertical section of well done later this week and possibly be ready to plug back well this weekend. | | Stopped by drill rig for up date they were tripping bit@10,277' they hope to have vertical section of well done later this week and possibly be ready to plug back well this weekend. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 1436998003 |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| 2013-10-29 | | 2013-10-29 | ||
− | | | + | | |
| My inspection today finds the well is shut in. The preliminary restoration requirements have been met. | | My inspection today finds the well is shut in. The preliminary restoration requirements have been met. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1863230100 |
− | | 2012- | + | | 2012-04-05 |
− | | | + | | |
− | | | + | | Spud date 3/31/12 Ziegenfuss set 156' of 24 casing and drilled pilot hole for 16 casing too be set with drill rig when it arrives on site there is 517' of 19 hole owner will set approximately 515' of 16 when drill rig shows up on site. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | -29439878 |
| 2013-10-29 | | 2013-10-29 | ||
− | | | + | | |
| My inspection today finds the well is shut in. The preliminary restoration requirements have been met. | | My inspection today finds the well is shut in. The preliminary restoration requirements have been met. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 66795773 | | 66795773 | ||
| 2012-05-25 | | 2012-05-25 | ||
− | | | + | | |
| Stopped by drill site for update they were tripping bit@8238' they stated that they should be back to drilling by this evening. | | Stopped by drill site for update they were tripping bit@8238' they stated that they should be back to drilling by this evening. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -79668743 | ||
+ | | 2012-06-04 | ||
+ | | | ||
+ | | Drilling@10,544' should be at total depth by early morning. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-121-24349 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.66469637,"lon":-81.53746864,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANADARKO E & P ONSHORE LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-06-12 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.66469637 | |
Longitude: -81.53746864 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 0.0 | 2970.0 | ||||
2013-12 | 0.0 | 0.0 | ||||
2013-3 | 0.0 | 0.0 | ||||
2013-6 | 0.0 | 0.0 | ||||
2013-9 | 0.0 | 0.0 | ||||
2014-3 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2014-4 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2015-1 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-105367093 | 2012-05-30 | Stopped by drill rig for up date they were tripping bit@10,277' they hope to have vertical section of well done later this week and possibly be ready to plug back well this weekend. | ||||
1436998003 | 2013-10-29 | My inspection today finds the well is shut in. The preliminary restoration requirements have been met. | ||||
-1863230100 | 2012-04-05 | Spud date 3/31/12 Ziegenfuss set 156' of 24 casing and drilled pilot hole for 16 casing too be set with drill rig when it arrives on site there is 517' of 19 hole owner will set approximately 515' of 16 when drill rig shows up on site. | ||||
-29439878 | 2013-10-29 | My inspection today finds the well is shut in. The preliminary restoration requirements have been met. | ||||
66795773 | 2012-05-25 | Stopped by drill site for update they were tripping bit@8238' they stated that they should be back to drilling by this evening. | ||||
-79668743 | 2012-06-04 | Drilling@10,544' should be at total depth by early morning. |
For data sources see[2]