X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-029-62636"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-029-62636
 
| Well ID: 34-029-62636
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.63264876, -80.6637852887 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.63264876, -80.66378529 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Columbiana County, Ohio|Columbiana]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GONZOIL INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date:  
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Final Restoration
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
Line 31: Line 31:
 
| Latitude: 40.63264876
 
| Latitude: 40.63264876
 
|-
 
|-
| Longitude: -80.6637852887
+
| Longitude: -80.66378529
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
| -1215769143
+
| 1166944386
 
| 2002-09-20
 
| 2002-09-20
|
+
|  
| Inspected the plugged well for any signs of leakage and to see if the cement has dropped down hole . There are no signs of any leakage at this time and the top of  cement is approximately 5' from ground level ( excavation approximately 4' deep was dug around the wellbore , cement approximately 1' below the bottom of the excavation ) . I advised Doug Gonzales to go ahead and backfill the excavation around the wellbore ( via phone call ) .
+
| Inspected the plugged well for any signs of leakage and to see if the cement has dropped down hole . There are no signs of any leakage at this time and the top of  cement is approximately 5' from ground level ( excavation approximately 4' deep was dug around the wellbore , cement approximately 1' below the bottom of the excavation ) . I advised Doug Gonzales to go ahead and backfill the excavation around the wellbore ( via phone call ) .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1166944386
+
| -1215769143
 
| 2002-09-20
 
| 2002-09-20
|
+
|  
| Inspected the plugged well for any signs of leakage and to see if the cement has dropped down hole . There are no signs of any leakage at this time and the top of  cement is approximately 5' from ground level ( excavation approximately 4' deep was dug around the wellbore , cement approximately 1' below the bottom of the excavation ) . I advised Doug Gonzales to go ahead and backfill the excavation around the wellbore ( via phone call ) .
+
| Inspected the plugged well for any signs of leakage and to see if the cement has dropped down hole . There are no signs of any leakage at this time and the top of  cement is approximately 5' from ground level ( excavation approximately 4' deep was dug around the wellbore , cement approximately 1' below the bottom of the excavation ) . I advised Doug Gonzales to go ahead and backfill the excavation around the wellbore ( via phone call ) .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 94677755
 
| 94677755
 
| 2002-10-15
 
| 2002-10-15
|
+
|  
 
| Met with the landowner. No probems. Meets requirements.
 
| Met with the landowner. No probems. Meets requirements.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:45, 15 July 2015

Well Details

Well ID: 34-029-62636
Loading map...
County: Columbiana
Municipality:
Operator Name: GONZOIL INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional: No
Configuration: Vertical
Well Status: Final Restoration
Violations: 0
Latitude: 40.63264876
Longitude: -80.66378529

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1166944386 2002-09-20 Inspected the plugged well for any signs of leakage and to see if the cement has dropped down hole . There are no signs of any leakage at this time and the top of cement is approximately 5' from ground level ( excavation approximately 4' deep was dug around the wellbore , cement approximately 1' below the bottom of the excavation ) . I advised Doug Gonzales to go ahead and backfill the excavation around the wellbore ( via phone call ) .
-1215769143 2002-09-20 Inspected the plugged well for any signs of leakage and to see if the cement has dropped down hole . There are no signs of any leakage at this time and the top of cement is approximately 5' from ground level ( excavation approximately 4' deep was dug around the wellbore , cement approximately 1' below the bottom of the excavation ) . I advised Doug Gonzales to go ahead and backfill the excavation around the wellbore ( via phone call ) .
94677755 2002-10-15 Met with the landowner. No probems. Meets requirements.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.